INSPECTION
Inspection · Vehicles built from Nov 2006
| INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
Check the resistance.

Measure the resistance between the terminals.
- Standard resistance:
- 6.9 to 7.9 Ω at 20 °C (68°F)
Check the operation.

Connect the positive (+) battery lead to terminal 1 and the negative (-) lead to terminal 2, and check the movement of the valve.
- Standard:
Condition
Specified Condition
Battery positive (+) voltage applied
Valve moves to the left as shown in the illustration
Battery positive (+) voltage cut off
Valve moves to the right as shown in the illustration
- NOTICE:
- If the valve cannot return properly because of foreign matter intrusion, a small amount of leakage in the advanced direction may occur and a DTC may be output.
