P0252 Injection Pump Fuel Metering Control "A" Range / Performance (Cam / Rotor / Injector)
Diagnostic trouble codes · Vehicles built from Nov 2005
Also covers:
- P1228 Injection Pump Fuel Metering Control "A" Range / Performance (Cam / Rotor / Injector)
DESCRIPTION
| DTC No. |
DTC Detection Conditions |
Trouble Areas |
| P0252 |
|
|
| P1228 |
Open or short in fuel metering unit circuit for more than 0.5 seconds (The MIL is illuminated and a DTC is immediately set when a malfunction is detected) |
- HINT:
- These DTCs are set when the engine idles for approximately 60 seconds.
- When DTC P0252 and/or P1228 is set, check the internal fuel pressure of the common rail by selecting the following menu items on the intelligent tester: Powertrain / Engine and ECT / Data List / Common Rail Pressure.
- These DTCs are set when the engine idles for approximately 60 seconds.
Engine Speed
Fuel Pressure (MPa)
Idling
Approximately 25 to 36
2,000 rpm (No engine load)
Approximately 27 to 46
3,000 rpm (No engine load)
Approximately 34 to 69
WIRING DIAGRAM


INSPECTION PROCEDURE
- HINT:
- Read freeze frame data using an intelligent tester. Freeze frame data record the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, if the air-fuel ratio was lean or rich, and other data, from the time the malfunction occurred.
| 1. READ OUTPUT DTCS (DTC P0252 AND/OR P1228) |
Connect an intelligent tester to the DLC3.
Turn the ignition switch on (IG) and turn the tester on.
Select the following menu items: Powertrain / Engine and ECT / DTC.
Read DTCs.
- Result:
Display (DTC Output)
Proceed To
P1228, or P0252 and P1228
A
Only P0252
B
|
|
||||
| A | |
| 2. INSPECT SUPPLY PUMP ASSEMBLY (FUEL METERING UNIT) |
Disconnect the C54 fuel metering unit connector.

Measure the resistance between the terminals of the fuel metering unit valve.
- Standard resistance:
- 2.60 to 3.15 Ω at 20°C (68°F)
Reconnect the fuel metering unit connector.
|
|
||||
| OK | |
| 3. CHECK FUSE (ECD2 FUSE) |
Remove the ECD2 fuse from the engine room relay block.

Check the ECD2 fuse resistance.
- Standard resistance:
- Below 1 Ω
Reinstall the ECD2 fuse.
|
|
||||
| OK | |
| 4. CHECK HARNESS AND CONNECTOR (ECD RELAY - FUEL METERING UNIT - ECM) |
Disconnect the C54 fuel metering unit connector.

Disconnect the C50 ECM connector.
Remove the integration relay from the engine room relay block.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
(C54-1) - Integration relay (1A-8)
Below 1 Ω
PCV (C50-12) - (C54-2)
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
(C54-1) or Integration relay (1A-8) - Body ground
10 kΩ or higher
PCV (C50-12) or (C54-2) - Body ground
Reinstall the integration relay.
Reconnect the ECM connector.
Reconnect the fuel metering unit connector.
|
|
||||
| NG | ||
| ||
