2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Nov 2006


1. INSTALL DUTY VACUUM SWITCHING VALVE

  1. A158276
    Connect the 2 hoses to the duty vacuum switching valve.

  1. Install the duty vacuum switching valve with the screw.

  1. A158275
    Connect the duty vacuum switching valve connector and wire harness clamp.


2. INSTALL NO. 2 CYLINDER HEAD COVER

  1. A158207
    Disengage the 4 fittings shown and install the No. 2 cylinder head cover by applying pressure to it.

    HINT:
    Make sure that the oil and the engine oil level dipstick are correctly installed before installing the No. 2 cylinder head cover.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

← INSPECTION (from Nov 2006)PRECAUTION (from Nov 2005) →