SFI SYSTEM > ECM Power Source Circuit |

| 1.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY) |
![]() |
Remove the No. 1 integration relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1C-1 - Body ground | Always | 11 to 14 V |
| *a | Front view of wire harness connector (to No. 1 Integration Relay) |
|
| ||||
| OK | |
| 2.INSPECT NO.1 INTEGRATION RELAY (EFI MAIN RELAY AND IG2 RELAY) |
Inspect the No. 1 integration relay (Click here).
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM) |
Remove the No. 1 integration relay from the engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A74-44 (MREL) - 1D-7 | Always | Below 1 Ω |
| A74-2 (+B) - 1E-4 | Always | Below 1 Ω |
| A74-1 (+B2) - 1E-4 | Always | Below 1 Ω |
| A74-44 (MREL) or 1D-7 - Body ground | Always | 10 kΩ or higher |
| A74-2 (+B) or 1E-4 - Body ground | Always | 10 kΩ or higher |
| A74-1 (+B2) or 1E-4 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND) |
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| B84-104 (E1) - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | |
| 5.INSPECT ECM (IGSW TERMINAL VOLTAGE) |
![]() |
Disconnect the ECM connectors.
Turn the ignition switch assembly to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| A74-28 (IGSW) - B84-104(E1) | Ignition switch ON | 11 to 14 V |
| *a | Front view of wire harness connector (to ECM) |
| *b | Front view of wire harness connector (to ECM) |
| Result | Proceed to |
| NG | A |
| OK | B |
|
| ||||
| A | |
| 6.CHECK HARNESS AND CONNECTOR (ECM - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A74-28 (IGSW) - 1D-9 | Always | Below 1 Ω |
| A74-28 (IGSW) or 1D-9 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 7.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH ASSEMBLY - NO. 1 INTEGRATION RELAY - BODY GROUND) |
Remove the No. 1 integration relay from the engine room relay block.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1D-17 - F13-6 (IG2) | Always | Below 1 Ω |
| 1E-10 - Body ground | Always | Below 1 Ω |
| F13-6 (IG2) or 1D-17 - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | |
| 8.INSPECT IGNITION SWITCH ASSEMBLY |
Inspect the ignition switch assembly (Click here).
|
| ||||
| OK | ||
| ||