Twin Clutch System Actuation Fluid Reservoir Removal and Installation
Precautions: Precautions for Diagnosing Trouble · Precautions for Disassembly and Reassembly · Precautions for Transmission / Transaxle · General safety (00)
Removal
1)Perform “Hydraulic Circuit Depressurization” function under “Utility” mode on SUZUKI scan tool referring Hydraulic Circuit Depressurization Procedure.
4)Remove twin clutch system actuation fluid reservoir bolt No.1 (1) and twin clutch system actuation fluid reservoir bolt No.2 (2) and then remove reservoir.
Installation
Reverse removal procedure noting the following points.
•Use new O-ring.
•Tighten twin clutch system actuation fluid reservoir bolt No.1 and twin clutch system actuation fluid reservoir bolt No.2 to specified torque.
Twin clutch system actuation fluid reservoir bolt No.2: 10 N·m (1.0 kgf-m, 7.5 lbf-ft)
•After replacing twin clutch system actuation fluid reservoir, perform TCM and Clutch Initialization.
•Tighten twin clutch system actuation fluid reservoir bolt No.1 and twin clutch system actuation fluid reservoir bolt No.2 to specified torque.
Tightening torque
Twin clutch system actuation fluid reservoir bolt No.1: 10 N·m (1.0 kgf-m, 7.5 lbf-ft)Twin clutch system actuation fluid reservoir bolt No.2: 10 N·m (1.0 kgf-m, 7.5 lbf-ft)

