Home › Engine / Hybrid System › 2ZR-FXE (HYBRID / BATTERY CONTROL) › HV BATTERY STACK (for LITHIUM-ION BATTERY) › from 2019.09
RM32K0E _51 Engine / Hybrid System _083958 2ZR-FXE HYBRID / BATTERY CONTROL _0404396 HV BATTERY STACK(for LITHIUM-ION BATTERY) A

2ZR-FXE HYBRID / BATTERY CONTROL  HV BATTERY STACK(for LITHIUM-ION BATTERY)  INSTALLATION  


PROCEDURE

Hide G9509 1.INSTALL NO. 2 HV SUPPLY STACK SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Install the No. 2 HV supply stack sub-assembly with the 4 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Engage the claw.


Hide G9508 2.INSTALL NO. 1 HV SUPPLY STACK SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Install the No. 1 HV supply stack sub-assembly with the 4 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Engage the claw.


c.

Connect the connector.

NOTICE:

Make sure that the connector is connected securely.



d.

Connect the connector.

NOTICE:

Make sure that the connector is connected securely.



Hide G92PC 5.INSTALL NO. 1 HV BATTERY PROTECTOR

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Engage the 2 claws to install the No. 1 HV battery protector to the No. 2 HV battery protector.


b.

Install the 3 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


c.

Engage the clamp to connect the wire harness.


Hide G920Q 6.INSTALL NO. 1 HYBRID BATTERY SHIELD SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Install the No. 1 hybrid battery shield sub-assembly to the HV battery with the nut.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Engage the clip.


Hide G92D1 8.INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT

CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Install the No. 1 hybrid battery intake duct to the HV battery with the clip.


b.

Engage the claw of hybrid battery thermistor (sensor portion) to connect the hybrid battery thermistor to the No. 1 hybrid battery intake duct.


Hide G92Z0 10.INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY WITH NO. 2 HYBRID BATTERY SHIELD SUB-ASSEMBLY

Hide G920L 11.INSTALL UPPER NO. 1 HYBRID BATTERY COVER SUB-ASSEMBLY

Hide 13. PERFORM UTILITY

NOTICE:
·

Perform "Battery Status Info Update" after replacing a malfunctioning HV supply stack sub-assembly.

Click hereEngine / Hybrid System>2ZR-FXE (HYBRID / BATTERY CONTROL)>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>UTILITY

·

Perform "Prediagnostic Battery Charge" after replacing a malfunctioning HV supply stack sub-assembly.

Click hereEngine / Hybrid System>2ZR-FXE (HYBRID / BATTERY CONTROL)>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>UTILITY

·

Perform "Battery Diagnosis" after replacing a malfunctioning HV supply stack sub-assembly.

Click hereEngine / Hybrid System>2ZR-FXE (HYBRID / BATTERY CONTROL)>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>UTILITY