The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during the front door belt moulding removal/installation are shown below.
*1: When performing learning using the GTS.
*2: w/ Stop and start system
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
1. PRECAUTION
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
2.DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
for 8NR-FTS:
for 3ZR-FAE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
87940
3.REMOVE OUTER REAR VIEW MIRROR ASSEMBLY
67832
4.REMOVE FRONT DOOR SERVICE HOLE COVER
68102
5.REMOVE FRONT DOOR GLASS SUB-ASSEMBLY
75720
6.REMOVE FRONT DOOR BELT MOULDING ASSEMBLY
|
Protective Tape |
Apply protective tape around the front door belt moulding assembly.
|
Remove in this Direction |
Disengage the 6 claws as shown in the illustration to remove the front door belt moulding assembly.