ENGINE ASSEMBLY > INSTALLATION |
| 1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
![]() |
Using SST, install a new gasket and the ECT sensor.
| 2. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
![]() |
Clean the threads of the oil pressure switch. Apply adhesive to 2 or 3 threads of the oil.
![]() |
Using a 24 mm deep socket wrench, install the oil pressure switch.
| 3. INSTALL RADIO SETTING CONDENSER |
![]() |
Install the condenser with the bolt.
| 4. INSTALL KNOCK SENSOR |
![]() |
Install the sensor with the nut as shown in the illustration.
| 5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY |
![]() |
Apply a light coat of engine oil to an O-ring of the camshaft timing oil control valve assembly sensor.
![]() |
Install the camshaft timing oil control valve assembly sensor with the bolt.
Connect the camshaft timing oil control valve assembly sensor connector.
| 6. INSTALL IGNITION COIL ASSEMBLY |
Install the 4 ignition coils with the 4 bolts.
| 7. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Install the V-ribbed belt tensioner with the bolt and nut.
| 8. INSTALL ENGINE MOUNTING BRACKET RH |
![]() |
Remove the engine mounting bracket RH with the 3 bolts.
| 9. INSTALL OIL COOLER PIPE |
![]() |
Install a new gasket and the pipe with the bolt and 2 nuts.
| 10. INSTALL NO. 1 WATER BY-PASS PIPE |
![]() |
Install a new gasket and the pipe with the bolt and 2 nuts.
| 11. INSTALL THERMOSTAT |
Install a new gasket onto the thermostat.
![]() |
Install the thermostat with the jiggle valve upward.
| 12. INSTALL WATER INLET |
![]() |
Install the water inlet with the 2 nuts.
| 13. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY |
Install a new gasket onto the cylinder head.
Temporarily tighten the exhaust manifold converter with the 5 nuts.
![]() |
Tighten the 5 nuts in the sequence shown in the illustration.
![]() |
Connect the air-fuel ratio sensor connector.
![]() |
Install the exhaust manifold heat insulator with the 4 bolts.
| 14. INSTALL NO. 2 MANIFOLD STAY |
![]() |
Install the stay with the bolt and nut.
| 15. INSTALL MANIFOLD STAY |
![]() |
Install the stay with the bolt and nut.
| 16. INSTALL OIL LEVEL GAUGE GUIDE |
![]() |
Apply a light coat of engine oil to a new O-ring and install it to the guide.
Install the oil level gauge guide with the bolt.
| 17. INSTALL OIL LEVEL GAUGE SUB-ASSEMBLY |
| 18. INSTALL DRIVE SHAFT BEARING BRACKET |
![]() |
Install the bracket with the 3 bolts.
| 19. INSTALL NO. 1 INTAKE MANIFOLD INSULATOR |
![]() |
Install the intake manifold insulator onto the cylinder block.
| 20. INSTALL NO. 2 VENTILATION HOSE |
| 21. INSTALL INTAKE MANIFOLD |
![]() |
Install a new gasket into the intake manifold.
![]() |
Install the intake manifold with the 5 bolts and 2 nuts.
| 22. INSTALL FUEL DELIVERY PIPE WITH INJECTOR |
![]() |
Install 4 new insulators into the cylinder head.
Install the 2 delivery pipe spacers onto the cylinder head.
![]() |
Install the fuel delivery pipe together with the 4 fuel injectors, then temporarily tighten the 2 bolts.
Check that the fuel injector rotates smoothly.
If the fuel injector does not rotate smoothly, replace the O-ring.
![]() |
Tighten the 2 bolts to the specified torque.
![]() |
Connect the 4 fuel injector connectors.
Install the 2 wire harness clamps.
| 23. REMOVE ENGINE STAND |
| 24. INSTALL FLYWHEEL SUB-ASSEMBLY (for Manual Transaxle) |
![]() |
Using SST, hold the crankshaft.
Clean the bolt and the bolt hole.
Apply adhesive to 2 or 3 threads of the bolt end.
![]() |
Install the flywheel with the 8 bolts. Uniformly tighten the 8 bolts in the sequence shown in the illustration.
| 25. INSTALL CLUTCH DISC ASSEMBLY (for Manual Transaxle) |
![]() |
Insert SST into the clutch disc assembly, then insert them into the flywheel sub-assembly.
| 26. INSTALL CLUTCH COVER ASSEMBLY (for Manual Transaxle) |
![]() |
Align the matchmarks on the clutch cover assembly with the one on the flywheel sub-assembly.
Following the procedures shown in the illustration, tighten the 6 bolts in order, starting with the bolt located near the knock pin on the top.
| 27. INSTALL DRIVE PLATE & RING GEAR SUB-ASSEMBLY (for Automatic Transaxle) |
![]() |
Using SST, hold the crankshaft.
Clean the bolt and the bolt hole.
Apply adhesive to 2 or 3 threads of the bolt end.
![]() |
Install the front spacer, drive plate and rear spacer with the 8 bolts. Uniformly tighten the 8 bolts in the sequence shown in the illustration.
| 28. INSTALL MANUAL TRANSAXLE ASSEMBLY (for Manual Transaxle) |
| 29. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY (for Automatic Transaxle) |
| 30. INSTALL STARTER ASSEMBLY (for Manual Transaxle) |
![]() |
Install the starter assembly and clutch flexible hose bracket with the 3 bolts.
![]() |
Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.
Connect the terminal 50 connector to the starter assembly.
| 31. INSTALL STARTER ASSEMBLY (for Automatic Transaxle) |
![]() |
Install the starter assembly with the 2 bolts.
![]() |
Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.
Connect the terminal 50 connector to the starter assembly.
| 32. INSTALL ENGINE WIRE |
| 33. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH |
![]() |
Coat the spline of the inboard joint shaft assembly with ATF.
Align the shaft splines and install the drive shaft assembly LH with a brass bar and hammer.
| 34. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH |
![]() |
Coat the spline of the inboard joint shaft assembly with ATF.
Install the front drive shaft the assembly RH.
Using a screwdriver, install a new bearing bracket hole snap ring.
Install a new bolt.
| 35. INSTALL FRONT FRAME ASSEMBLY |
![]() |
A/T:
Install the engine mounting insulator LH with the nut.
![]() |
M/T:
Install the engine mounting insulator LH with the bolt.
![]() |
Install the engine mounting insulator RH with the nut.
![]() |
Install the engine mounting insulator FR with the bolt.
![]() |
M/T:
Install the engine lateral control rod with the bolt.
| 36. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install the vane pump to the engine with the 2 bolts.
Connect the oil pressure switch connector.
| 37. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE |
![]() |
Set the engine assembly with transaxle on the engine lifter.
Install the engine assembly to the vehicle.
Install the frame side plate LH and RH with the 4 bolts and 2 nuts.
![]() |
Install the front suspension member brace rear RH and LH with the 4 bolts and 2 nuts.
| 38. INSTALL STEERING SLIDING YOKE |
![]() |
Align the matchmarks on the steering sliding yoke and the steering link assembly.
![]() |
Install the bolt.
| 39. INSTALL NO. 1 EXHAUST PIPE SUPPORT BRACKET |
Install the exhaust pipe support bracket with the 2 bolts.
| 40. INSTALL DRIVE PLATE & TORQUE CONVERTER CLUTCH SETTING BOLT (for Automatic Transaxle) |
Apply a few drops of adhesive to 2 threads on the tip of the 6 torque converter clutch mounting bolts.
![]() |
Install the 6 torque converter clutch mounting bolts.
![]() |
Install the flywheel housing under cover.
| 41. INSTALL FRONT AXLE ASSEMBLY LH |
![]() |
Align the matchmarks and install the front drive shaft assembly to the front axle hub sub-assembly.
| 42. INSTALL FRONT AXLE ASSEMBLY RH |
| 43. INSTALL FRONT SUSPENSION LOWER NO. 1 ARM LH |
![]() |
Install the lower ball joint to the front suspension lower No. 1 arm with the bolt and 2 nuts.
| 44. INSTALL FRONT SUSPENSION LOWER NO. 1 ARM RH |
| 45. INSTALL TIE ROD ASSEMBLY LH |
Install the tie rod end sub-assembly to the steering knuckle with the nut.
Install a new cotter pin.
| 46. INSTALL TIE ROD ASSEMBLY RH |
| 47. INSTALL FRONT SPEED SENSOR LH |
![]() |
Install the front speed sensor to the steering knuckle with the bolt.
![]() |
Install the flexible hose and the speed sensor to the shock absorber with the bolt and set the sensor clip on the knuckle.
| 48. INSTALL FRONT SPEED SENSOR RH |
| 49. INSTALL FRONT STABILIZER LINK ASSEMBLY LH |
![]() |
Install the stabilizer link assembly with the nut.
| 50. INSTALL FRONT STABILIZER LINK ASSEMBLY RH |
| 51. INSTALL FRONT AXLE HUB NUT LH |
Clean the threaded parts on the drive shaft and front axle hub nut using a non-residue solvent.
![]() |
Using a socket wrench (30 mm), install a new axle hub nut.
Using a chisel and hammer, stake the front axle hub nut.
| 52. INSTALL FRONT AXLE HUB NUT RH |
| 53. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
| 54. INSTALL COMPRESSOR AND MAGNETIC CLUTCH |
![]() |
Install the cooler compressor with the 4 bolts.
| 55. INSTALL GENERATOR ASSEMBLY |
![]() |
Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.
![]() |
Install the generator assembly with the 2 bolts.
![]() |
Install the generator wire to terminal B with the nut.
Install the clamp bracket with the bolt.
Attach the clamp and connect the generator connector to the generator.
| 56. CONNECT FUEL TUBE SUB-ASSEMBLY |
![]() |
Push in the fuel tube connector to the fuel pipe until the connector makes a "click" sound.
![]() |
Install the No. 1 fuel pipe clamp.
| 57. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transaxle) |
| 58. INSTALL CLUTCH ACCUMULATOR ASSEMBLY (for Manual Transaxle) |
| 59. CONNECT RETURN TUBE SUB-ASSEMBLY |
![]() |
Connect the return tube sub-assembly.
| 60. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE |
![]() |
Connect the No. 1 oil reservoir to pump hose.
| 61. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Manual Transaxle) |
![]() |
Connect the ends of the 2 cables and install the 2 washers and 2 clips.
Install 2 new clips to the control cable bracket.
| 62. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transaxle) |
![]() |
Install a new clip and nut, and connect the control lever.
Connect the clamp with the cable to the transaxle.
| 63. CONNECT ENGINE WIRE |
![]() |
Install the 2 bolts and clamp to the body.
![]() |
Connect the clamp to the bracket.
![]() |
Connect the wire to the engine room junction block. Then, install it with the nut and 3 connectors.
| 64. INSTALL ECM |
| 65. CONNECT HEATER WATER HOSE INLET |
![]() |
Connect the heater inlet water hose.
| 66. CONNECT HEATER WATER HOSE OUTLET |
![]() |
Connect the heater outlet water hose.
| 67. CONNECT OIL COOLER INLET HOSE (for Automatic Transaxle) |
![]() |
Connect the oil cooler inlet hose to the radiator assembly.
| 68. CONNECT OIL COOLER OUTLET HOSE (for Automatic Transaxle) |
![]() |
Connect the oil cooler outlet hose to the radiator assembly.
| 69. CONNECT RADIATOR HOSE INLET |
![]() |
Install the clamp and connect the radiator hose inlet.
| 70. CONNECT RADIATOR HOSE OUTLET |
![]() |
Install the clamp and connect the radiator hose outlet.
| 71. CONNECT NO. 1 VACUUM HOSE CONNECTOR |
![]() |
Install the clamp and connect the vacuum hose connector.
| 72. INSTALL NO. 2 ENGINE MOUNTING BRACKET RH |
![]() |
Install the 3 bolts and No. 2 mounting bracket RH.
| 73. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY |
![]() |
Install the engine moving control rod with the 3 bolts.
![]() |
Install the ground cable with the bolt.
| 74. INSTALL NO. 2 ENGINE MOUNTING STAY RH |
![]() |
Install the No. 2 mounting stay RH with the 2 bolts.
| 75. INSTALL BATTERY |
Install the battery and battery tray.
![]() |
Install the battery clamp with the bolt and nut.
| 76. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
![]() |
Install the air cleaner case with the 3 bolts.
Connect the hose clamp.
| 77. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
Install the air cleaner filter element onto the air cleaner case.
![]() |
Insert the hinges. Install the air cleaner cap sub-assembly with the 2 bolts.
![]() |
Align the matchmarks of the No. 1 air cleaner hose and throttle body, and then connect the air cleaner hose No. 1 to the throttle body and unfasten the No. 1 air cleaner hose clamp.
![]() |
Connect the No. 2 ventilation hose to the air cleaner hose.
![]() |
Connect the purge line hose to the clamp (*1).
Connect the 2 purge VSV vacuum hoses (*2).
Connect the purge VSV connector (*3).
Connect the mass air flow meter connector (*4).
| 78. INSTALL AIR CLEANER INLET ASSEMBLY |
![]() |
Install the air cleaner inlet with the 2 bolts.
| 79. INSTALL V-RIBBED BELT |
![]() |
Using SST and 19 mm socket wrench, loosen the V-ribbed belt tensioner arm clockwise, then install the V-ribbed belt.
After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Check to confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.
| 80. INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY |
![]() |
Install the outer cowl top panel sub-assembly with the 4 bolts and 4 nuts.
| 81. INSTALL WINDSHIELD WIPER LINK ASSEMBLY |
| 82. INSTALL FRONT WHEEL |
| 83. ADD ENGINE OIL |
| 84. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 85. BLEED CLUTCH LINE (for Manual Transaxle) |
Fill the brake reservoir with brake fluid and bleed the clutch system.
| 86. ADD ENGINE COOLANT |
Close the radiator drain cock plug and 2 cylinder block drain cock plugs.
Slowly fill the radiator with TOYOTA Super Long Life Coolant (SLLC).
Slowly pour coolant into the radiator reservoir tank until it reaches the FULL line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level is low, add coolant.
Install the radiator cap sub-assembly and reservoir tank cap.
Start the engine, and warm it up.
Stop the engine, and wait until the engine coolant cools down.
Add engine coolant to the FULL line on the radiator reservoir.
| 87. ADD MANUAL TRANSAXLE OIL (for Manual Transaxle) |
![]() |
Park the vehicle on a level place.
Remove the filler plug and gasket.
Check that the oil surface is within 5 mm (0.20 in.) below the lowest point of the filler plug opening.
Check for oil leakage if the oil level is low.
Install the filler plug and a new gasket.
| 88. ADD AUTOMATIC TRANSAXLE FLUID (for Automatic Transaxle) |
| 89. ADD POWER STEERING FLUID |
| 90. BLEED POWER STEERING FLUID |
Check the fluid level .
Jack up the front of the vehicle and support it with stands.
Turn the steering wheel.
With the engine stopped, turn the steering wheel slowly from lock to lock several times.
Lower the vehicle.
Start the engine.
Run the engine at idle for a few minutes.
Turn the steering wheel.
With the engine idling, turn the steering wheel left or right to the full lock position and keep it in that position for 2 to 3 seconds, then turn the steering wheel to the opposite full lock position and keep it there for 2 to 3 seconds.
Repeat this procedure several times.
Stop the engine.
![]() |
Check for foaming or emulsification.
Check the fluid level .
| 91. CHECK FOR FUEL LEAKS |
Check fuel pump operation.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to the ON position and push the intelligent tester main switch on.
Select the following menus: Powertrain / Engine / Active Test / Control the Fuel Pump /Speed.
Check for pressure in the fuel inlet tube from the fuel line. Check that sound of fuel flowing in the fuel tank can be heard. If no sound can be heard, check the integration relay, fuel pump, ECM and wiring connector.
Check for fuel leaks.
Check that there are no fuel leaks anywhere on the system after performing maintenance. If there is a fuel leak, repair or replace parts as necessary.
Turn the ignition switch off.
Disconnect the intelligent tester from the DLC3.
| 92. CHECK FOR ENGINE OIL LEAKS |
| 93. CHECK FOR ENGINE COOLANT LEAKS |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf*cm, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
| 94. CHECK FOR EXHAUST GAS LEAKS |
| 95. CHECK SHIFT LEVER POSITION |
When shifting from the P to the R position with the ignition switch on and brake pedal depressed, make sure that the shift lever moves smoothly and moves correctly into position.
Start the engine and make sure that the vehicle moves forward when shifting from the N to the D position and moves rearward when shifting to the R position.
If operation cannot be done as specified, inspect the park/neutral position switch assembly and check the shift lever assembly installation condition.
| 96. ADJUST FRONT WHEEL ALIGNMENT |
| 97. CHECK IGNITION TIMING |
Warm up the engine.
![]() |
When using the intelligent tester:
Check the ignition timing.
Connect the intelligent tester to the DLC3.
Enter DATA LIST MODE on the intelligent tester.
![]() |
When not using the intelligent tester:
Check the ignition timing.
Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.
![]() |
Remove the No. 1 engine cover.
Pull out the wire harness as shown in the illustration. Connect the clip of the timing light to the wire harness.
Check the ignition timing at idle.
Disconnect terminals 13 (TC) and 4 (CG) of the DLC3.
Check the ignition timing at idle.
Confirm that the ignition timing moves to the advanced angle side when the engine rpm is increased.
Remove the timing light.
| 98. CHECK ENGINE IDLE SPEED |
![]() |
Warm up the engine.
When using the intelligent tester:
Check the idle speed.
Connect the intelligent tester to the DLC3.
Enter DATA LIST MODE on the intelligent tester.
| Item | Specified Condition |
| M/T | 650 to 750 rpm |
| A/T | 610 to 710 rpm |
![]() |
When not using the intelligent tester:
Check the idle speed.
Using SST, connect the tachometer tester probe to terminal 9 (TAC) of the DLC3.
Check the idle speed.
| Item | Specified Condition |
| M/T | 650 to 750 rpm |
| A/T | 610 to 710 rpm |
| 99. INSPECT CO/HC |
Start the engine.
Run the engine at 2,500 rpm for approximately 180 seconds.
Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe during idling.
Immediately check CO/HC concentration at idle and/or 2,500 rpm.
If the CO/HC concentration does not comply with regulations, troubleshoot in the order given below.
Check A/F sensor operation .
Check heated oxygen sensor operation .
See the table below for possible causes, and then inspect and repair.
| CO | HC | Problems | Causes |
| Normal | High | Rough idle |
|
| Low | High | Rough idle (fluctuating HC reading) |
|
| High | High | Rough idle (black smoke from exhaust) |
|
| 100. INSTALL FRONT FENDER APRON SEAL RH |
| 101. INSTALL ENGINE UNDER COVER LH |
| 102. INSTALL ENGINE UNDER COVER RH |
| 103. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
![]() |
Install the engine cover with the 2 nuts.
| 104. CHECK ABS SPEED SENSOR SIGNAL |
ABS: Click here.
VSC: Click here.