When the engine is cranked, the ST (Starter) relay drive signal output from the ignition or starter switch assembly*1 or certification ECU (smart key ECU assembly)*2 is input to the STA terminal of the ECM, and the NE signal generated by the crankshaft position sensor is also input to the NE+ terminal. Thus, the ECM interprets that the engine has been cranked, and turns transistor Tr1 in the ECM internal circuit on. Current flows to the C/OPN (Circuit Opening) relay by turning Tr1 on. Then, the fuel pump operates.
While the NE signal is input to the ECM with the engine running, the ECM turns Tr1 on continuously.
*1: w/o smart entry and start system.
*2: w/ smart entry and start system.
Inspect the fuses for circuits related to this system before performing the following procedure.
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
| Tester Display |
|---|
| Control the Fuel Pump / Speed |
Check whether the fuel pump operating sound occurs when performing the Active Test on the GTS.
| Result | Proceed to |
|---|---|
| Fuel pump operating sound does not occur | A |
| Fuel pump operating sound occurs | B |
A
B
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1E-1 - A25-21 (FC) | Always | Below 1 Ω |
| 1E-1 or A25-21 (FC) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1C-6 - N11-4 (B) | Always | Below 1 Ω |
| 1C-6 or N11-4 (B) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| N11-5 (E) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the fuel pump.
Click hereEngine / Hybrid System>2AR-FE FUEL>FUEL PUMP>INSPECTION
Perform "Inspection After Repair" after replacing the fuel pump.
Click hereEngine / Hybrid System>2AR-FE ENGINE CONTROL>SFI SYSTEM>INITIALIZATION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1D-1 - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the No. 1 integration relay.
Click hereEngine / Hybrid System>2AR-FE ENGINE CONTROL>INTEGRATION RELAY>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Starter Signal.
| Tester Display |
|---|
| Starter Signal |
Check the result when the ignition switch is ON and the engine starts.
| Condition | Starter Signal |
|---|---|
| Ignition switch ON | OFF |
| Cranking position | ON |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Engine Speed.
| Tester Display |
|---|
| Engine Speed |
Read the values displayed on the GTS while cranking.
Values are displayed continuously.
| Proceed to |
|---|
| OK |
| NG |
OK
NG