Home › Engine / Hybrid System › 2GR-FE ENGINE CONTROL › SFI SYSTEM
RM2030EQ _51 Engine / Hybrid System _014634 2GR-FE ENGINE CONTROL _0074393 SFI SYSTEM J

2GR-FE ENGINE CONTROL  SFI SYSTEM  Active Control Engine Mount System  


DESCRIPTION

LOCATION
A255115C02
3.542,4.396 3.875,4.813 3.875,4.813 4.01,4.813 false 3.281,4.573 3.083,5.115 3.083,5.115 2.948,5.115 false 4.052,4.74 4.24,4.927 0.188,0.188 10 false *1 2.76,5.042 2.917,5.229 0.156,0.188 10 false *2
*1 Vacuum Switching Valve (for Active Control Engine Mount) *2 Front Engine Mounting Insulator Assembly



The active control engine mount system decreases engine vibration at a low engine speed using the vacuum switching valve (for active control engine mount). The vacuum switching valve (for active control engine mount) is controlled by a pulse signal transmitted to the vacuum switching valve (for active control engine mount) from the ECM. The frequency of this pulse signal is matched to the engine speed to decrease engine vibration.

WIRING DIAGRAM

A266395E05
5.656,1.177 6.073,1.521 0.417,0.344 10 false ACM 5.656,2.927 6.135,3.271 0.479,0.344 10 false MREL 5.479,1.094 5.917,1.458 0.438,0.365 10 false 8 5.406,2.823 5.74,3.052 0.333,0.229 10 false 46 5.073,1.094 5.406,1.51 0.333,0.417 10 false 2 3.792,1.094 4.021,1.448 0.229,0.354 10 false 1 3.615,1.385 3.927,1.635 0.313,0.25 10 false E10 3.615,1.552 5.396,2.25 1.781,0.698 10 false Vacuum Switching Valve (for Active Control Engine Mount) 3.167,1.188 3.573,1.604 0.406,0.417 10 false 1A 3.167,1.677 3.5,2.01 0.333,0.333 10 false 1C 1.333,2.24 1.656,2.646 0.323,0.406 10 false 1E 1.26,1.177 1.542,1.552 0.281,0.375 10 false 1B 3.219,1 3.542,1.365 0.323,0.365 10 false 8 3.219,1.5 3.51,1.76 0.292,0.26 10 false 7 1.302,1 1.583,1.302 0.281,0.302 10 false 1 1.458,2.052 1.833,2.406 0.375,0.354 10 false 2 1.688,1.958 2.396,2.229 0.708,0.271 10 false EFI MAIN 2.365,1.333 3.146,1.625 0.781,0.292 10 false EFI NO. 3 1.75,2.479 3.198,2.813 1.448,0.333 10 false No. 1 Integration Relay 0.458,1.656 1.094,2.063 0.635,0.406 10 false EFI-MAIN NO. 1 0.594,3.344 1.063,3.677 0.469,0.333 10 false Battery 0.479,2.5 1.063,2.896 0.583,0.396 10 false FL MAIN 6.229,3.875 6.667,4.219 0.438,0.344 10 false ECM 5.917,3.885 6.313,4.156 0.396,0.271 10 false A25

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses for circuits related to this system before performing the following procedure.


PROCEDURE

1.CHECK VACUUM HOSES
a.
A204508C01
2.177,0.917 2.333,0.365 2.333,0.365 2.458,0.365 false 2.406,2.135 2.698,2.771 false 1.469,2.75 1.469,3.031 false 0.844,2.219 1.01,2.375 0.167,0.156 10 *1 0.552,0.813 0.76,0.969 0.208,0.156 10 *a 2.5,0.302 2.667,0.458 0.167,0.156 10 *6 2.333,1.177 2.5,1.333 0.167,0.156 10 *5 2.333,1.573 2.5,1.729 0.167,0.156 10 *4 1.375,3.052 1.542,3.208 0.167,0.156 10 *3 2.729,2.688 2.896,2.844 0.167,0.156 10 *2
*1 Engine
*2 Vacuum Switching Valve (for Active Control Engine Mount)
*3 Front Engine Mounting Insulator Assembly
*4 ECM
*5 Air Cleaner
*6 Vacuum Tank
*a to Vacuum Switching Valve (for Air Intake Control Valve)


Check the air and vacuum hoses for looseness, disconnection and blockage.

OK:

No looseness, disconnection or blockage.



Result:
Proceed to
OK
NG



OK

2.CHECK VACUUM

NG

REPAIR OR REPLACE VACUUM HOSES

2.CHECK VACUUM
a.
A255869

Disconnect the vacuum hose from the air cleaner cap.


b.

Start the engine.


c.

Check that the disconnected port located on the vacuum tank applies suction to your finger.

OK:

Vacuum exists.



Result:
Proceed to
OK
NG



OK

3.INSPECT VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) (OPERATION)

NG

CHECK AND REPLACE VACUUM SOURCE AND HOSES

3.INSPECT VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) (OPERATION)
a.

Inspect the vacuum switching valve (for active control engine mount) operation.

Click hereEngine / Hybrid System>2GR-FE ENGINE CONTROL>VACUUM SWITCHING VALVE(for Engine Mounting)>INSPECTION


Result:
Proceed to
OK
NG



OK

4.INSPECT VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) (RESISTANCE)

NG

REPLACE VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT)

4.INSPECT VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) (RESISTANCE)
a.

Inspect the vacuum switching valve (for active control engine mount) resistance.

Click hereEngine / Hybrid System>2GR-FE ENGINE CONTROL>VACUUM SWITCHING VALVE(for Engine Mounting)>INSPECTION


Result:
Proceed to
OK
NG



OK

5.INSPECT FRONT ENGINE MOUNTING INSULATOR ASSEMBLY

NG

REPLACE VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT)

5.INSPECT FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
a.

Inspect the front engine mounting insulator assembly.

Click hereEngine / Hybrid System>2GR-FE ENGINE CONTROL>ACTIVE CONTROL ENGINE MOUNT>ON-VEHICLE INSPECTION


Result:
Proceed to
OK
NG



OK

6.CHECK TERMINAL VOLTAGE (POWER SOURCE OF VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT))

NG

REPLACE FRONT ENGINE MOUNTING INSULATOR ASSEMBLY

6.CHECK TERMINAL VOLTAGE (POWER SOURCE OF VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT))
a.
A203087C01
0.552,1.073 1.01,1.354 0.458,0.281 0.177,0.188 0.729,0.667 0.552,0.479 10 *a 0.677,1.135 1.167,1.469 0.49,0.333 10 E10
*a Front view of wire harness connector
(to Vacuum Switching Valve (for Active Control Engine Mount))


Disconnect the vacuum switching valve (for active control engine mount) connector.


b.

Turn the ignition switch to ON.


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
E10-1 - Body ground Ignition switch ON 11 to 14 V



Result:
Proceed to
OK
NG



OK

7.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) - ECM)

NG

8.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) - NO. 1 INTEGRATION RELAY)
7.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) - ECM)
a.

Disconnect the vacuum switching valve (for active control engine mount) connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
E10-2 - A25-8 (ACM) Always Below 1 Ω
E10-2 or A25-8 (ACM) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE (FOR ACTIVE CONTROL ENGINE MOUNT) - NO. 1 INTEGRATION RELAY)
a.

Disconnect the vacuum switching valve (for active control engine mount) connector.


b.

Remove the No. 1 integration relay from the engine room relay block and junction block assembly.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
E10-1 - 1A-8 Always Below 1 Ω
E10-1 or 1A-8 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR