Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY) › from 2020.08
RM33C0E _51 Engine / Hybrid System _065433 HYBRID / BATTERY CONTROL _0442936 HYBRID BATTERY SYSTEM(for LITHIUM-ION BATTERY) C

HYBRID / BATTERY CONTROL  HYBRID BATTERY SYSTEM(for LITHIUM-ION BATTERY)  P0A8115  Hybrid/EV Battery Cooling Fan 1 Circuit Short to Auxiliary Battery or Open  


DESCRIPTION

Refer to the description for DTC P0A8111.

Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>P0A8111

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Warning Indicate
P0A8115 Hybrid/EV Battery Cooling Fan 1 Circuit Short to Auxiliary Battery or Open Both of the following conditions are met:
·

The speed calculated based on the battery cooling blower assembly output frequency (FP0) is not within the target control speed range.

·

The battery cooling blower assembly speed is excessively high when a speed below a certain level is requested.


(1 trip detection logic)
·

Battery cooling blower assembly

·

Battery ECU assembly


Comes on Master Warning Light:
Comes on

Related Data List
DTC No. Data List
P0A8115
·

Hybrid/EV Battery Cooling Fan 1 Drive Request

·

Hybrid/EV Battery Cooling Fan 1 Drive Status

·

Hybrid/EV Battery Cooling Fan 1 Frequency



The following items can be helpful when performing repairs:

Data List
·

Hybrid/EV Battery Temperature 1 to 6

·

BATT Voltage


HINT:
·

"Hybrid/EV Battery Cooling Fan 1 Frequency" is detected when the battery cooling blower assembly is operating and its value changes in proportion to the battery cooling blower assembly speed.

·

If the battery cooling blower assembly speed is excessively high, this DTC is stored.



CONFIRMATION DRIVING PATTERN

HINT:

After repairs have been completed, clear the DTCs and then check that the vehicle has returned to normal by performing the following All Readiness check procedure.

Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>UTILITY


1.

Connect the GTS to the DLC3.

2.

Turn the power switch on (IG) and turn the GTS on.

3.

Clear the DTCs (even if no DTCs are stored, perform the clear DTC procedure).

4.

Turn the power switch off and wait for 2 minutes or more.

5.

Turn the power switch on (IG) and turn the GTS on.

6.

Enter the following menus: Powertrain / HV Battery / Active Test / Control the Hybrid/EV Battery Cooling Fan.

7.

Select fan mode 6 and operate the battery cooling blower assembly and wait for 60 seconds or more.

HINT:

Operation of the battery cooling blower assembly can be confirmed by checking if air is sucked into the air intake port of the intake duct or by operation sounds.


8.

Enter the following menus: Powertrain / HV Battery / Utility / All Readiness.

9.

Check the DTC judgment result.

HINT:
·

If the judgment result shows NORMAL, the system is normal.

·

If the judgment result shows ABNORMAL, the system has a malfunction.

·

If the judgment result shows INCOMPLETE or N/A, perform driving pattern again.




WIRING DIAGRAM

CAUTION / NOTICE / HINT

CAUTION:
·
A340358

Before the following operations are conducted, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip from HV battery.

-

Inspecting the high-voltage system

-

Disconnecting the low voltage connector of the inverter with converter assembly

-

Disconnecting the low voltage connector of the HV battery


·
A357588

To prevent electric shock, make sure to remove the service plug grip to cut off the high voltage circuit before servicing the vehicle.

·
A358042

After removing the service plug grip from the HV battery, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.

·
A357589C02
1.573,0.74 2.021,0.427 true 2.094,0.344 2.354,0.51 0.26,0.167 10 false *a
*a Without waiting for 10 minutes


After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work.

Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>PRECAUTION

HINT:

Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.




NOTICE:

After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION


PROCEDURE

1.CHECK DTC OUTPUT (HV BATTERY, HYBRID CONTROL)
a.

Connect the GTS to the DLC3.


b.

Turn the power switch on (IG).


c.

Enter the following menus: Powertrain / HV Battery and Hybrid Control / Trouble Codes.


d.

Check for DTCs.

Powertrain > HV Battery > Trouble Codes
50001 398
Powertrain > Hybrid Control > Trouble Codes
50001 397
Result:
Result Proceed to
P0A8115 only is output, or DTCs except the ones in the table below are also output. A
DTCs of hybrid battery system in the table below are output. B
DTCs of hybrid control system in the table below are output. C


System Relevant DTC
Hybrid battery system P060A47 Hybrid/EV Battery Energy Control Module Monitoring Processor Watchdog / Safety MCU Failure
P060B49 Hybrid/EV Battery Energy Control Module A/D Processing Internal Electronic Failure
P060687 Hybrid/EV Battery Energy Control Module Processor to Monitoring Processor Missing Message
Hybrid control system P0A1F94 Hybrid/EV Battery Energy Control Module Unexpected Operation


e.

Turn the power switch off.



A

2.CHECK BATTERY ECU ASSEMBLY (FREQUENCY)

B

C