16331A
1.INSTALL THERMOSTAT
Apply a continuous bead of seal packing (diameter 2.2 to 2.7 mm (0.0866 to 0.1063 in.)) as shown in the illustration.
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent.
Remove any oil from the contact surface.
Install the water outlet within 3 minutes of applying the seal packing.
Do not start the engine for at least 2 hours after the installation.
Install a new gasket onto the thermostat.
Align the jiggle valve to the position shown in the illustration and install the thermostat.
| *a | Jiggle Valve |
Install the water outlet with the 3 bolts.
29 N*m (291 kgf*cm, 21 ft.*lbf)
16571
2.CONNECT INLET RADIATOR HOSE
17113
3.INSTALL INTAKE PIPE
17341K
4.CONNECT NO. 1 INTERCOOLER AIR HOSE
16206
5.CONNECT WATER BY-PASS PIPE SUB-ASSEMBLY
Connect the water by-pass pipe sub-assembly with the 3 bolts
29 N*m (291 kgf*cm, 21 ft.*lbf)
Connect the water by-pass hose and slide the hose clamp to secure the hose.
6.ADD ENGINE COOLANT
7.INSPECT FOR COOLANT LEAK
58701A
8.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY
33506F
9.INSTALL FLOOR SHIFT CONTROL SHIFT LEVER RETAINER SUB-ASSEMBLY
58123A
10.INSTALL SHIFT AND SELECT LEVER SUPPORT WITH BOOTS
58420
11.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY
58734B
12.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP
58410
13.INSTALL ENGINE SERVICE HOLE COVER
58521D
14.INSTALL ENGINE SERVICE HOLE COVER MAT