Home › Engine / Hybrid System › N04C-VQ (INTAKE) › TURBOCHARGER
RM2850E _51 Engine / Hybrid System _073303 N04C-VQ INTAKE _0356987 TURBOCHARGER A

N04C-VQ INTAKE  TURBOCHARGER  INSTALLATION  


PROCEDURE

Hide 17201 1.INSTALL TURBOCHARGER SUB-ASSEMBLY

a.

Install a new gasket and the turbocharger sub-assembly with 4 new nuts and the 4 spacers.

Torque:

70 N*m (714 kgf*cm, 52 ft.*lbf)



b.

Connect the turbocharger sub-assembly control actuator connector.


Hide 17271 2.INSTALL NO. 1 TURBO INSULATOR

a.

Install the No. 1 turbo insulator with the 3 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 15474 3.INSTALL TURBO OIL OUTLET PIPE

a.

Install 2 new gaskets, coolant by-pass pipe sub-assembly and turbo oil outlet pipe with the 4 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 16028 4.INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY

a.

Install 4 new gaskets and the No. 2 turbo water pipe sub-assembly with the 2 union bolts.

Torque:

25 N*m (250 kgf*cm, 18 ft.*lbf)



Hide 15407 5.INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY

a.

Install 4 new gaskets and the turbo oil inlet pipe sub-assembly, and temporarily install the 2 union bolts and bolt.


b.

Tighten the 2 union bolts.

Torque:

25 N*m (250 kgf*cm, 18 ft.*lbf)



c.

Tighten the bolt.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



d.

Connect the engine oil pressure switch assembly connector.


Hide 16895 6.INSTALL NO. 1 TURBO WATER PIPE

a.

Install a new O-ring to the No. 1 turbo water pipe.


b.

Install 2 new gaskets and the No. 1 turbo water pipe, and temporarily install the union bolt and bolt.


c.

Tighten the union bolt.

Torque:

25 N*m (250 kgf*cm, 18 ft.*lbf)



d.

Tighten the bolt.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 17030 7.CONNECT AIR HOSE ASSEMBLY

a.

Connect the air hose assembly and install the bolt.

Torque:

18 N*m (184 kgf*cm, 13 ft.*lbf)



b.

Tighten the hose clamp.

Torque:

5.0 N*m (51 kgf*cm, 44 in.*lbf)



c.

Connect the PCV hose to the air hose assembly, and slide the clamp to secure the hose.


d.

Attach the 2 wire harness clamps.


Hide 17113D 8.INSTALL NO. 1 INTAKE PIPE

a.

Install a new gasket and the No. 1 intake pipe with the 2 nuts and bolt.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



b.

Connect the No. 1 air hose with the hose clamp.

Torque:

6.0 N*m (61 kgf*cm, 53 in.*lbf)



Hide 46700 9.INSTALL EXHAUST RETARDER ASSEMBLY

Hide 25608 10.INSTALL EGR COOLER SUB-ASSEMBLY

Hide 13.INSPECT FOR EXHAUST GAS LEAK

Hide 53711C 14.INSTALL FRONT FENDER APRON RH

a.

Install the front fender apron RH with the 7 bolts.

Torque:

7.0 N*m (71 kgf*cm, 62 in.*lbf)



Hide 51446C 15.INSTALL ENGINE UNDER COVER BRACKET LH

Hide 51445D 16.INSTALL ENGINE UNDER COVER BRACKET RH

Hide 51441D 17.INSTALL NO. 1 ENGINE UNDER COVER