Home › Engine / Hybrid System › N04C-VL (ENGINE CONTROL) › ECD SYSTEM
RM2850E _51 Engine / Hybrid System _073159 N04C-VL ENGINE CONTROL _0357053 ECD SYSTEM J

N04C-VL ENGINE CONTROL  ECD SYSTEM  ECM Power Source Circuit  


DESCRIPTION

When the ignition switch is turned to ON, the battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes a current to flow to the coil of the No. 2 integration relay (EFI), closing the contacts and supplying power to terminals +B of the ECM.

WIRING DIAGRAM

A402328E02
0.802,0.313 1.177,0.49 0.375,0.177 10 false AM1 1.552,0.313 1.854,0.49 0.302,0.177 10 false IG1 0.354,0.844 0.729,1.021 0.375,0.177 10 false AM1 0.365,1.479 0.948,1.646 0.583,0.167 10 false J/B ALT 0.354,2.052 0.698,2.25 0.344,0.198 10 false ALT 0.354,2.979 0.958,3.177 0.604,0.198 10 false FL MAIN 0.49,2.677 1.365,2.875 0.875,0.198 10 false R/B NO. 2-B 1.615,2.677 1.906,2.875 0.292,0.198 10 false P/I 1,3.656 1.552,3.865 0.552,0.208 10 false Battery 2.844,3.563 4.417,3.75 1.573,0.188 10 false No. 2 Integration Relay 2.823,2.688 3.49,2.885 0.667,0.198 10 false EFI-MAIN 3.781,3.24 4.156,3.417 0.375,0.177 10 false EFI 2.292,2.521 2.667,2.698 0.375,0.177 10 false 2E 2.292,2.948 2.667,3.125 0.375,0.177 10 false 2D 2.823,1 3.49,1.198 0.667,0.198 10 false IG2 NO. 1 4.573,2.948 4.844,3.125 0.271,0.177 10 false 2D 4.573,2.521 4.844,2.698 0.271,0.177 10 false 2D 4.573,0.844 4.844,1.021 0.271,0.177 10 false 2C 4.573,0.427 4.844,0.604 0.271,0.177 10 false 2C 2.292,0.427 2.563,0.604 0.271,0.177 10 false 2C 5.75,0.844 6.042,1.021 0.292,0.177 10 false A56 5.76,2.531 6.052,2.708 0.292,0.177 10 false A57 5.75,2.948 6.042,3.125 0.292,0.177 10 false A56 5.708,3.479 6.063,3.667 0.354,0.188 10 false B102 6.469,3.885 6.844,4.063 0.375,0.177 10 false ECM 6.177,3.49 6.458,3.667 0.281,0.177 10 false E1 6.177,2.958 6.646,3.135 0.469,0.177 10 false MREL 6.177,2.521 6.646,2.698 0.469,0.177 10 false +B 6.188,0.74 6.656,0.917 0.469,0.177 10 false IGSW 5.01,1.01 5.729,1.198 0.719,0.188 10 false IGN NO. 2 3.823,1.188 4.115,1.365 0.292,0.177 10 false IG2 1.896,0.313 2.052,0.51 0.156,0.198 10 false 5 0.604,0.313 0.729,0.521 0.125,0.208 10 false 6 0.875,0.813 1.25,0.99 0.375,0.177 10 false J63 0.865,0.979 1.875,1.156 1.01,0.177 10 false Ignition Switch 2.323,0.219 2.448,0.427 0.125,0.208 10 false 6 4.615,0.219 4.74,0.427 0.125,0.208 10 false 7 4.604,0.656 4.729,0.865 0.125,0.208 10 false 8 5.792,0.635 6,0.823 0.208,0.188 10 false 24 2.313,2.302 2.438,2.51 0.125,0.208 10 false 1 2.313,2.76 2.438,2.969 0.125,0.208 10 false 3 4.604,2.75 4.729,2.958 0.125,0.208 10 false 2 4.594,2.323 4.719,2.531 0.125,0.208 10 false 4 5.792,2.313 6.01,2.51 0.219,0.198 10 false 24 5.802,2.76 6.073,2.948 0.271,0.188 10 false 25 5.833,3.292 5.958,3.5 0.125,0.208 10 false 1 5,2.688 5.677,2.875 0.677,0.188 10 false EFI NO. 2

CAUTION / NOTICE / HINT

NOTICE:
·

After replacing the ECM, the new ECM needs registration (Click hereEngine / Hybrid System>N04C-VL (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION) and initialization (Click hereEngine / Hybrid System>N04C-VL (ENGINE CONTROL)>ECD SYSTEM>INITIALIZATION).

·

Inspect the fuses for circuits related to this system before performing the following inspection procedure.



PROCEDURE

1.CHECK NO. 2 INTEGRATION RELAY (POWER SOURCE)
a.
A201293E09
0.385,0.833 0.844,1.104 0.458,0.271 0.531,0.896 0.865,1.063 0.333,0.167 10 false 2E 0.083,0.083 0.292,0.26 0.208,0.177 10 false *a

Remove the No. 2 integration relay from the No. 2 relay block and junction block assembly.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
2E-1 - Body ground Always 11 to 14 V


Text in Illustration
*a Front view of wire harness connector
(to No. 2 Integration Relay)


Result:
Proceed to
OK
NG



OK

2.INSPECT NO. 2 INTEGRATION RELAY (EFI RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 2 INTEGRATION RELAY - BATTERY)

2.INSPECT NO. 2 INTEGRATION RELAY (EFI RELAY)
a.

Inspect the No. 2 integration relay (EFI relay) (Click hereEngine / Hybrid System>N04C-VL (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).


Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM, BODY GROUND)

NG

REPLACE NO.2 INTEGRATION RELAY

3.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - ECM, BODY GROUND)
a.

Remove the No. 2 integration relay from the No. 2 relay block and junction block assembly.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
A56-25 (MREL) - 2D-2 Always Below 1 Ω
A57-24 (+B) - 2D-4 Always Below 1 Ω
2D-3 - Body ground Always Below 1 Ω
A56-25 (MREL) or 2D-2 - Body ground Always 10 kΩ or higher
A57-24 (+B) or 2D-4 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

4.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
a.

Disconnect the ECM connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
B102-1 (E1) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

5.INSPECT ECM (IGSW VOLTAGE)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.INSPECT ECM (IGSW VOLTAGE)
a.
A260250E40
0.563,0.135 1.052,0.427 0.49,0.292 0.688,1 1.063,1.708 true 0.677,0.198 1.156,0.354 0.479,0.156 10 false A56 0.063,0.073 0.25,0.281 0.188,0.208 10 false *a 0.917,1.75 1.875,1.969 0.958,0.219 10 false 24 (IGSW)

Disconnect the ECM connectors.


b.

Turn the ignition switch to ON.


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
A56-24 (IGSW) - Body ground Ignition switch ON 11 to 14 V


Text in Illustration
*a Front view of wire harness connector
(to ECM)


Result:
Proceed to
OK
NG



OK

NG

6.INSPECT NO. 2 INTEGRATION RELAY
6.INSPECT NO. 2 INTEGRATION RELAY
a.

Inspect the No. 2 integration relay (IG2 relay) (Click hereEngine / Hybrid System>N04C-VL (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).


Result:
Proceed to
OK
NG



OK

7.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - IGNITION SWITCH, ECM, BODY GROUND)

NG

REPLACE NO.2 INTEGRATION RELAY

7.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - IGNITION SWITCH, ECM, BODY GROUND)
a.

Disconnect the ECM connector.


b.

Disconnect the ignition switch connector.


c.

Remove the No. 2 integration relay from the No. 2 relay block and junction block assembly.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
2C-6 - J63-5 (IG1) Always Below 1 Ω
2C-8 - A56-24 (IGSW) Always Below 1 Ω
2C-7 - Body ground Always Below 1 Ω
2C-6 or J63-5 (IG1) - Body ground Always 10 kΩ or higher
2C-8 or A56-24 (IGSW) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

8.INSPECT IGNITION SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.INSPECT IGNITION SWITCH ASSEMBLY
a.

Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND)

NG

REPLACE IGNITION OR STARTER SWITCH ASSEMBLY (IGNITION SWITCH - BATTERY)