2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 from Nov 2010


1. REMOVE V-BANK COVER

A126474
  1. Remove the 2 nuts, then remove the V-bank cover.


2. REMOVE NO.1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Remove the 4 bolts, then remove the No. 1 engine under cover.


3. REMOVE RADIATOR SUPPORT SEAL UPPER

  1. A129880
    Disengage the 7 clips, then remove the radiator support seal.


4. REMOVE FAN SHROUD

  1. A129881
    Disconnect the hose from the radiator.

  1. A129882
    Loosen the 4 nuts from the fan pulley.

  1. Remove the fan and generator V belt.
    (Click here)

  1. Remove the 4 nuts and the fluid coupling assembly with fan.

  1. Remove the bolt from the reserve tank.

  1. A129884E01
    Remove the 2 bolts from the fan shroud.

  1. Remove the fluid coupling assembly with fan and fan shroud.

  1. Remove the fan pulley.


5. REMOVE FAN

A112113
  1. Remove the 4 nuts and the fan from the fluid coupling.

← COMPONENTS (from Aug 2009)REMOVAL (Aug 2009 – Oct 2010) →