Home › ENGINE ยท 2TR-FE › ENGINE MECHANICAL › TIMING CHAIN

TIMING CHAIN > INSTALLATION

for Preparation Click here



1. INSTALL NO.2 CHAIN SUB-ASSEMBLY


    A101978
  1. Install the crankshaft timing sprocket No.2 to the crankshaft.

  1. Check that the No.1 cylinder is at TDC and that the weights of the balance shaft No.1 and No.2 are at the bottom side.



    A101339E02
  1. Install the chain by matching its mark plate with the timing marks on the crankshaft timing sprocket and balance shaft timing sprocket.



    A101340E03
  1. Fit the other timing mark (yellow) of the crankshaft timing sprocket behind the timing mark (large) of the balance shaft drive gear.



    A101341E03
  1. Insert the balance shaft drive gear shaft through the balance shaft drive gear so that it fits into the thread hole, then align the small timing mark of the balance shaft drive gear with the timing mark of the balance shaft timing gear (large), install the bolt to the balance shaft drive gear and tighten it.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



    A101342E02
  1. Check that each timing mark is matched with the corresponding mark link.

    NOTICE:
    Check that the No.1 cylinder is at TDC and that the wights of the balance shaft No.1 and No.2 are at the bottom side.



2. INSTALL CHAIN TENSIONER ASSEMBLY NO.2


    A102128E01
  1. Install the chain tensioner assembly No.2 with the nut.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



    A101320E03
  1. Assemble the chain tensioner with the hexagon wrench (width 1.5 mm) installed.



3. INSTALL CHAIN VIBRATION DAMPER NO.3


    A101322J01
  1. Install the chain vibration damper No.3 with the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



4. INSTALL CHAIN VIBRATION DAMPER NO.2


    A101321E01
  1. Install the chain vibration damper No.2 with the bolt.

    Torque:
    27 N*m{ 270 kgf*cm , 20 ft.*lbf }

  1. Remove the hexagon wrench from the chain tensioner and release the plunger.



5. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET


    A101308
  1. Install the crankshaft timing gear to the crankshaft.



6. INSTALL CHAIN VIBRATION DAMPER NO.1
  1. Install the vibration damper with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



7. INSTALL CHAIN SUB-ASSEMBLY


    A102129E02
  1. As shown in the illustration, install the chain on the sprocket and gear with the painted marks aligned with the timing marks on the sprocket and gear.

    HINT:
    1. The camshaft mark plate is yellow.
    2. The crankshaft mark plate is orange.



    A102127
  1. Use a rope to tie the chain of the crankshaft timing sprocket. Tie the rope near the gear.

    NOTICE:
    After the chain tensioner has been installed, the rope must be removed.

    HINT:
    The rope is tied so that the chain will not jump a tooth.



8. INSTALL CHAIN TENSIONER SLIPPER
  1. Install the tensioner slipper with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



9. INSTALL CHAIN TENSIONER ASSEMBLY NO.1
  1. Install a new gasket and the chain tensioner No.1 with the bolt and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Remove the hexagon wrench after installing the timing chain guide.



10. INSTALL TIMING CHAIN GUIDE
  1. Install a new O-ring and the chain guide with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Remove the hexagon wrench from the chain tensioner and release the plunger.



11. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL


    A101360E01
  1. Place the timing chain cover on wooden blocks.

  1. Using SST, tap in a new oil seal until its surface is flush with the timing gear case edge.

    SST
    09223-50010  

    NOTICE:
    1. Keep the lip free from foreign matter.
    2. Do not tap the oil seal at an angle.



12. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY



13. INSTALL OIL PAN SUB-ASSEMBLY


    A102816E02
  1. Apply seal packing in a continuous bead as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    Seal width:
    2.0 to 3.0 mm (0.079 to 0.118 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. After applying seal packing, put on the oil pan sub-assembly within 3 minutes, and then tighten the bolts and nuts within 15 minutes.
    3. Do not start the engine for at least 4 hours after installing.

  1. Install a new O-Ring to the bottom of the chain cover plate.



    G038130E01
  1. Temporarily install the oil pan with the 16 bolts and 2 nuts.

    Bolt length:
    Bolt A:
    20 mm (0.79 in.)
    Bolt B:
    40 mm (1.57 in.)

  1. Uniformly tighten the 16 bolts and 2 nuts in the sequence shown in the illustration.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }



14. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }



15. INSTALL OIL PAN SUB-ASSEMBLY NO.2


    A101343E02
  1. Apply seal packing in a continuous bead as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    Seal width:
    3.0 to 4.0 mm (0.118 to 0.157 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. After applying seal packing, put on the oil pan sub-assembly within 3 minutes, and then tighten the bolts and nuts within 15 minutes.
    3. Do not start the engine for at least 2 hours after installing.



    A101291E01
  1. Temporarily install the oil pan with the 18 bolts and 2 nuts.

  1. Uniformly tighten the 18 bolts and 2 nuts in the sequence shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



16. INSTALL CRANKSHAFT PULLEY


    G037557E01
  1. Align the pulley set key with the key groove of the pulley, and slide on the pulley.

  1. Using SST, install the crankshaft pulley bolt.

    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    260 N*m{ 2,651 kgf*cm , 192 ft.*lbf }



17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Install the cylinder head cover gasket and cylinder head gasket No.2 to the cylinder head cover.

  1. Remove any old packing (FIPG) material.



    A099825E01
  1. Apply seal packing as shown in the illustration.

    Seal packing:
    Part No. 08826-00080 or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover sub-assembly within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 4 hours after installing.



    A102166E01
  1. Temporarily install the head cover with the 19 bolts and 2 nuts.

  1. Fully tighten the A bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Fully tighten the B bolts and nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Make sure that the A bolts are completely tighten to the specified torque.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the ventilation hose No.1.



18. INSTALL IGNITION COIL ASSEMBLY
  1. Install the ignition coils with the bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



19. INSTALL MANUAL TRANSMISSION UNIT ASSY (for Manual Transmission)
(Click here)


20. INSTALL AUTOMATIC TRANSMISSION ASSY (for Automatic Transmission)
(Click here)


21. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    A102171E01
  1. Temporarily install the belt tensioner with the 3 bolts.

    HINT:
    Make sure that the belt tensioner is in contact with the engine block.

  1. Install the tensioner by tightening the 3 bolts in the order shown in the illustration.

    Torque:
    Bolt 1:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }
    Bolt 2:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    Bolt 3:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



22. INSTALL IDLER PULLEY SUB-ASSEMBLY NO.1


    A102170
  1. Install the idler pulley sub-assembly No.1, collar and pulley plate with the bolt.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

    NOTICE:
    Check that the pulley plate and collar are assembled properly to the idler pulley No.1.



23. INSTALL COMPRESSOR MOUNTING BRACKET NO.1 (w/ Air Conditioning)


    A114820E01
  1. Temporarily install the mounting bracket with the 5 bolts.

    HINT:
    Make sure that the mounting bracket is in contact with the engine block at points A shown in the illustration.

  1. Install the mounting bracket by tightening the 5 bolts in the order shown in the illustration.

    Torque:
    Bolt B:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }
    Except bolt B:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }

    NOTICE:
    In order to prevent misalignment, which causes belt rattle, tightening of the bolts must be performed in the order shown.



24. INSTALL GENERATOR ASSEMBLY


    A088507
  1. Install the generator assembly with the 3 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the generator wire with the nut to terminal B.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the generator connector.



25. INSTALL WATER BY-PASS PIPE NO.1
  1. Install a new gasket and the water by-pass pipe with the 2 nuts and bolt.

    Torque:
    Nut:
    18 N*m{ 180 kgf*cm , 13 ft.*lbf }
    Bolt:
    8.0 N*m{ 80 kgf*cm , 71 in.*lbf }



26. INSTALL FAN PULLEY
  1. Install the fan spacer and fan pulley with the 4 nuts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



27. INSTALL INTAKE MANIFOLD


    A102806J01
  1. Install a new gasket and the intake manifold with the 5 bolts and 2 nuts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Connect the ventilation hose No.3.



28. INSTALL INJECTOR ASSEMBLY
  1. Apply a light coat of grease or gasoline to new O-rings and install them to the injector spacers.

    NOTICE:
    Make sure that the O-rings are installed between the parts correctly.

  1. Install the injection spacers.

  1. Apply a light coat of grease or gasoline to the place where the delivery pipe touches the O-ring.



    A087155
  1. To install the fuel injector into the fuel delivery pipe, push the fuel injector while twisting it right and left.

    NOTICE:
    1. Be careful not to twist the O-ring.
    2. After installing the fuel injector, check that it turns smoothly. If not, reinstall it with a new O-ring.



29. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY


    G036023
  1. Install the 4 spacers to the cylinder head.

  1. Install the delivery pipe spacers.



    A087154
  1. Temporarily install the 2 bolts and fuel delivery pipe together with the 4 injectors.

    NOTICE:
    1. Do not drop the fuel injector when installing the fuel delivery pipe.
    2. Make sure that the fuel injector turns smoothly.

  1. Fully tighten the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 10 ft.*lbf }

  1. Apply a light coat of grease or gasoline to the place where the delivery pipe touches the O-ring.

  1. Install the 2 bolts and pressure pulsation damper assembly.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

  1. Connect the 2 fuel hoses.



30. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY


    A102440E01
  1. Install a new gasket onto the intake manifold.

    HINT:
    Fit the gasket to the cutout of the intake manifold.



    A102438E02
  1. Install the throttle body assembly with the 2 bolts and 2 nuts. (A)

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the water by-pass hose. (B)

  1. Connect the water by-pass hose No.2. (C)

  1. Connect the throttle motor connector. (D)



31. CONNECT ENGINE WIRE


32. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning)


    A102804E01
  1. Temporarily install the bolt A to install the compressor.

  1. Install the compressor completely by tightening the 4 bolts in the order shown in the illustration.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    In order to prevent misalignment, which causes belt rattle, tightening of the bolts must be performed in the order shown.

  1. Connect the suction tube clamp with the bolt.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. Connect the compressor connector.



33. INSTALL OIL LEVEL GAUGE GUIDE


    A102132E01
  1. Install the gauge guide with the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



34. INSTALL OIL LEVEL GAUGE SUB-ASSEMBLY


35. INSTALL VANE PUMP ASSEMBLY


    A102130E01
  1. Install the vane pump with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the PS fluid pressure switch connector.



36. CONNECT FUEL HOSE NO.2
  1. Connect the fuel hose No.2 to the delivery pipe.



37. CONNECT FUEL HOSE
  1. Align the connector and pipe. Push on the connector until the retainer locks with a click sound. (Click here)

  1. Pull the connector to check that the connector is securely connected. (Click here)



    A087756E01
  1. Install the connector and lock it with the fuel hose connector cover. (Click here)



38. INSTALL INTAKE AIR CONNECTOR
  1. Temporarily install the intake air connector to the throttle body assembly.



    A102437E02
  1. Connect the ventilation hose No.2 and the vacuum hose. (A)

  1. Install the intake air connector with the 2 bolts. (B)

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the 2 hose clamp bolts. (C)

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Tighten the 2 hose clamp bolts. (D)



39. CONNECT UNION TO CONNECTOR TUBE HOSE
  1. Connect the union to connector tube hose to the intake manifold.



40. CONNECT FUEL VAPOR FEED HOSE ASSEMBLY


    A103325
  1. Connect the fuel vapor feed hose to the VSV.



41. CONNECT RADIATOR HOSE OUTLET
  1. Connect the radiator outlet hose to the clamp.



42. CONNECT RADIATOR HOSE INLET
  1. Connect the radiator inlet hose to the clamp.



43. INSTALL FAN AND GENERATOR V BELT


G035171E02
  1. Install the drive belt to the pulleys except the drive belt tensioner pulley.

  1. Use the hexagon-shaped part indicated by the arrow in the illustration to move the tensioner pulley downward and then install the drive belt to the tensioner pulley.

    NOTICE:
    1. The backside of the drive belt should face the tensioner pulley.
    2. Check that the drive belt is properly set to each pulley.



    G036496E02
  1. After a new belt has been installed, check that the tensioner indicator mark is within range A shown in the illustration.



44. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Install the engine service hole sub cover with the 5 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



45. INSTALL FRONT DOOR SCUFF PLATE RH


46. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)
  1. Perform the same procedure as above on the opposite side.



47. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)
  1. Perform the same procedure as above on the opposite side.



48. CONNECT BATTERY NEGATIVE TERMINAL


49. ADD ENGINE OIL


50. ADD ENGINE COOLANT
  1. Firmly tighten the drain plugs and fill the reservoir tank with coolant to the top of the inlet.

  1. Remove the 2-way that is located near the throttle body.

  1. When air is bled and the coolant drains out, firmly install the 2-way.

  1. Add coolant up to the B line mark in the reservoir tank and install the radiator cap.

    Coolant capacity:

    Condition
    Capacity
    w/ rear heater
    15.0 liters (15.8 US qts, 13.2 lmp. qts)
    w/o rear heater
    13.0 liters (13.7 US qts, 11.4 lmp. qts)

  1. Warm up the engine.

  1. After the engine cools down, check that the coolant level is between the LOW and FULL level marks.



51. INSPECT FOR FUEL LEAKS
  1. When using the intelligent tester

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to the on position and intelligent tester main switch ON.

      NOTICE:
      Do not start the engine.

    3. Select the Active Test mode on the intelligent tester.

      HINT:
      Please refer to the intelligent tester operator's manual for further details.



  1. When not using the intelligent tester.



      A103380E01
    1. Disconnect the fuel pump connector.

    2. Using a service wire, connect terminals FP and +B of the relay block.

      NOTICE:
      Pay attention to the terminal connecting position to avoid a malfunction.

    3. Turn the ignition switch to the ON position, and check that the fuel pump operates.

      NOTICE:
      Do not start the engine.

  1. Check that there are no fuel leaks anywhere on the fuel system after doing maintenance.

  1. Check that the pulsation damper screw rises up when the fuel pump operates.
    If operation is not as specified, check the following parts:

    1. Fusible link
    2. Fuel pump
    3. Wiring connections
    4. ECM
    5. Fuses

  1. Turn the ignition switch off.

  1. Disconnect the intelligent tester from the DLC3.



52. INSPECT ENGINE OIL LEAKS


53. CHECK FOR ENGINE COOLANT LEAKS

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester to the radiator.

  1. Warm up the engine.

  1. Using a radiator cap tester, increase the pressure inside the radiator to 137 kPa (1.4 kgf/cm2, 19.9 psi), and check that the pressure does not drop.

    HINT:
    If the pressure drops, check the hoses, radiator or water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.



54. INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH)


55. INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH)


56. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)


57. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)


58. CHECK IDLE SPEED AND IGNITION TIMING
(Click here)


59. CHECK FUNCTION OF THROTTLE BODY


  1. Check the throttle control motor operating sounds.

    1. Turn the ignition switch to the ON position.



    2. A113033
    3. When pressing the accelerator pedal, listen to the running sounds of the motor. Make sure no friction noise comes from the motor.
      If friction noise exists, replace the throttle body.



    A082779E02
  1. Check the throttle position sensor.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the ignition switch to the ON position.

    3. Turn the intelligent tester main switch on.

    4. Enter the following menus: Power train / Engine / Data List / Throttle Sensor Position and Throttle Position Sensor Position #2.

    5. Depress the accelerator pedal. When the throttle valve is fully opened, check that the value of the "Throttle Sensor Position" is within the specification.

      Standard throttle valve opening percentage:
      60% or more

      NOTICE:
      When checking the standard throttle valve opening percentage, the shift lever should be in the N position.

      HINT:
      If the percentage is less than 60%, replace the throttle body.



60. PERFORM INITIALIZATION
(Click here)