2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Oct 2014 – Mar 2016

Versions by build date: Oct 2014 – Mar 2016 from Apr 2016


1. INSTALL OIL COOLER ASSEMBLY

  1. A113533
    Install 2 new gaskets and oil cooler to the oil cooler cover.

  1. Tighten the 4 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }


2. INSTALL OIL COOLER COVER SUB-ASSEMBLY (w/o EGR Valve)

  1. A113808
    Install a new gasket and oil cooler cover with the 2 nuts and 13 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A113535
    Install the oil drain hoses.

  1. Connect the oil pressure switch connector.


3. INSTALL OIL COOLER COVER SUB-ASSEMBLY (w/ EGR Valve)

  1. A102296
    Install a new gasket and oil cooler cover with the 13 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A113534
    Install the vacuum transmitting pipe No.2 with the 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Install the oil drain hoses.

  1. Connect the oil pressure switch connector.


4. INSTALL INJECTION OR SUPPLY PUMP ASSEMBLY

  1. A070715
    Confirm that the supply pump gear in the timing gear case moves back and forth smoothly.

  1. Install a new O-ring and the pulley key to the supply pump.

  1. Aligning the projecting edge of the supply pump head to the key-slot of the supply pump gear, install the pump to the timing gear case.

  1. While holding the supply pump by hand, push the supply pump gear rearward to engage the pump gear and drive shaft.

  1. Temporarily install the supply pump with the 2 nuts.

  1. A077989
    Using SST, hold the crankshaft.
    SST
    09213-58013  
    09330-00021  

  1. Install the supply pump gear set nut.

    HINT:
    Set a new O-ring before tightening the supply pump gear set nut.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }

  1. A076978
    Temporarily install the supply pump stay with the 2 bolts on the engine block side.

  1. Tighten the 2 nuts for the injection pump.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

  1. A070710
    Install the camshaft timing pulley flange No.2 and pump drive shaft pulley with the 4 bolts.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }


5. CHECK PUMP DRIVE SHAFT THRUST CLEARANCE

  1. A071144
    Push the pump drive shaft pulley back and forth to check a thrust clearance of the injection pump drive shaft.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    NOTICE:
    Make sure that the crankshaft pulley's notch is at 30 degree in the counterclockwise direction form the TDC position.

    HINT:
    If there is not thrust clearance, disassemble and reassemble the injection pump and pump drive shaft pulley.


6. INSTALL COMMON RAIL ASSEMBLY

  1. A102476E01
    Install the common rail assembly with the 2 bolts.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }

  1. Connect the fuel hose to the fuel pressure limiter.

  1. Connect the fuel pressure sensor connector.


7. INSTALL OIL FILTER SUB-ASSEMBLY
(Click here)

8. INSTALL INTAKE MANIFOLD

  1. A103060
    Install a new gasket and the intake manifold with the 4 bolts and 2 nuts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

  1. Install the manifold stay with the bolt and nut.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the ground cable with the bolt.


9. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY NO.2

  1. A103527
    Temporarily install the nozzle leakage pipe assembly No.2 with the 2 bolts.

  1. A103528
    Install the check valve nozzle leakage pipe assembly No.2 and a new gasket.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A103533
    Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A103529
    Install the 3 fuel hoses on the nozzle leakage pipe assembly No.2.


10. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket, or timing gear case with a new one, replace the fuel inlet pipe.
  2. Be careful not to adhere dusts, dirt or any other materials onto the joint area of the fuel inlet pipe.

  1. Temporarily install the fuel inlet pipe.

  1. Using SST, tighten the injection pipe on the common rail side.

    SST
    09023-12701  

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with SST

  1. Using SST, tighten the injection pipe on the supply pump side.

    SST
    09023-12701  

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with SST


11. INSTALL INJECTION PIPE SUB-ASSEMBLY
SST
09023-12701  

NOTICE:
  1. When replacing the fuel injector, common rail, or cylinder head with a new one, replace injection pipes No. 1, No. 2, No. 3, and No. 4.
  2. Keep clean the joint of the injection pipe.

  1. Install the injection pipes.

    1. A103532
      Temporarily install the 4 injection pipes.

    2. A103526
      Install the injection pipe clamp No.3 in 2 nuts.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    3. A103532E01
      Fasten the union sequentially, from the injection pipe common rail to the injector, using SST.
      SST
      09023-12701  

      Torque:
      Use union nut wrench and torque wrench:
      32 N*m{ 326 kgf*cm , 24 ft.*lbf }


12. INSTALL OIL LEVEL GAUGE GUIDE
  1. Install a new O-ring to the oil level gauge guide.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil level gauge guide with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the oil level gauge.


13. INSTALL INTAKE AIR CONNECTOR (w/o EGR Valve)

  1. A106848E01
    Temporarily install 2 new gaskets and intake air connector No.2 to the intake air connector.

  1. A106846
    Temporarily tighten the intake air connector assembly with the bolt and 2 nuts.

  1. Tighten the manifold stay with the bolt.

  1. Tighten the intake air connector with the bolt and 2 nuts.

  1. Install the vacuum hose to the intake air connector.


14. TEMPORARILY TIGHTEN ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR Valve)

  1. Temporarily tighten the EGR valve assembly with the sensor.

    1. A115761E01
      Install 2 new gaskets and the EGR valve to the intake air connector as shown in the illustration.

    2. A102287
      Temporarily tighten the intake air connector with EGR valve assembly to the intake manifold with the bolt and the 2 nuts.

    3. Install the vacuum hose to the intake air connector.

    4. Temporarily tighten the manifold stay with the bolt.

    5. A103043
      Connect the EGR valve position sensor connector.

    6. Connect the intake air temperature sensor connector.

  1. Install the vacuum regulating valve.

    1. A103046
      Install the vacuum regulating valve with the 2 bolts.

      Torque:
      20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    2. Connect the 2 vacuum hoses and the regulating valve connector.


15. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)

  1. A106845
    Install the 2 gaskets to the cylinder head and EGR pipe sub-assembly as shown in the illustration.

  1. A106844
    Install the EGR pipe sub-assembly with the 2 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Tighten the intake air connector with the bolt and the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the manifold stay.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


16. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)

  1. A106845
    Install the 2 gaskets to the cylinder head and EGR pipe sub-assembly as shown in the illustration.

  1. A106844
    Install the EGR pipe sub-assembly with the 2 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Tighten the intake air connector with the bolt and the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the manifold stay.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


17. INSTALL DIESEL THROTTLE BODY ASSEMBLY

NOTICE:
After removing and installing, or replacing the throttle body, be sure to perform the operation check.

  1. Install a new gasket to intake air connector.

  1. A102902
    Install the throttle body with the 2 bolts and the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. A102282
    Connect the 2 throttle body connectors.


18. INSTALL AIR HOSE NO.4

  1. A102281
    Install the air hose No.4 with the 2 clamps.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


19. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)

  1. A106845
    Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

  1. A106844
    Install the EGR pipe with the 2 bolts and the 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A106043
    Connect the fuel pressure sensor connector.


20. CONNECT OIL RETURN HOSE (w/ Intercooler)

  1. A106042
    Connect the oil return hose with the clip.


21. INSTALL TIMING BELT

  1. A070691E01
    Check that the timing marks are aligned as shown in the illustration.

  1. Install the timing belt to pump drive shaft pulley, camshaft timing pulley and timing belt idler No.1 in sequence.

  1. A070548
    Set the tensioner to the press upright.

    NOTICE:
    1. Do not allow the rod end to scratch and deform.
    2. Press the tensioner rod in upward.
    3. Protect a tip of the push rod with a rag in order to prevent damage.

  1. Using a press, slowly apply 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force to the push rod.

    NOTICE:
    Do not apply loads 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) or more on the push rod.

  1. Align the holes of push rod and housing, pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

  1. Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts and install the tensioner

  1. Remove the 1.5 mm hexagon wrench from the tensioner.

  1. A070549E01
    Turn the crankshaft in the clockwise direction twice, check that the timing marks are aligned as shown in the illustration.


22. INSTALL TIMING BELT COVER NO.1

  1. A102815
    Install the timing belt No.1 cover with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the wire harness clamp.


23. INSTALL FAN & GENERATOR V BELT
  1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

    NOTICE:
    Make sure that the fan and generator V belt is set properly on each pulley.

  1. Check that the indicator mark of the V-ribbed belt tensioner (Click here).


24. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

  1. A102278
    Install the vane pump oil reservoir assembly with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


25. ADD ENGINE COOLANT
  1. Firmly tighten the drain plugs.

  1. Fill the radiator reservoir assembly with engine coolant to the top of the inlet.

    Standard Capacity:
    Item
    Specified Condition
    w/o Heater
    13.2 liters (13.9 US qts, 11.6 Imp. qts)
    w/ Front Heater
    14.2 liters (15.0 US qts, 12.5 Imp. qts)
    w/ Front and Rear Heaters
    16.2 liters (17.1 US qts, 14.3 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only Toyota Super Long Life Coolant or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. Loosen the bleeder plug of the outlet housing.

  1. When air is bled and the engine coolant drains out, firmly tighten the bleeder plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A142533
    Add engine coolant up to the B line mark in the radiator reservoir assembly and install the radiator reservoir cap sub-assembly.

  1. Warm up the engine until the thermostat opens.

    1. While the thermostat is open, circulate the engine coolant for several minutes.

      HINT:
      The thermostat open timing can be confirmed by pressing the No. 3 radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. A142532
    After the engine cools down, check that the engine coolant level is between the LOW and FULL level marks.


26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

27. INSTALL BATTERY SERVICE HOLE COVER

28. BLEED FUEL LINE

  1. A114068E01
    Using the hand pump, bleed air from the fuel system until pumping becomes difficult.


29. CHECK FOR ENGINE OIL LEAKS

30. INSTALL ENGINE SERVICE HOLE COVER NO.2
  1. Install the engine service hole cover No.2 with the 3 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A113039
    Return the carpet.


31. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Install the engine service hole sub cover with the 5 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


32. INSTALL FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)
(Click here)

33. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)
(Click here)

34. INSTALL FRONT DOOR SCUFF PLATE RH

35. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


36. PERFORM INITIALIZATION
(Click here)
← REMOVAL (from Oct 2014)INSTALLATION (from Apr 2016) →