INSTALLATION
Removal / installation · Vehicles built from Jan 2017
Versions by build date: Oct 2014 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
- HINT:
- A bolt without a torque specification is shown in the standard bolt chart (Click here).
| 1. INSTALL NO. 4 ROOF WIRE (NO. 2 ANTENNA CORD SUB-ASSEMBLY) (w/ Rear View Monitor System) |
Attach the guide and each clamp to install the No. 4 roof wire (No. 2 antenna cord sub-assembly).
Connect each connector.
Install the bolt.
| 2. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY (w/o Rear View Monitor System) |
Attach the guide and each clamp to install the No. 2 antenna cord sub-assembly.
Connect each connector.
Install the bolt.
| 3. INSTALL ROOF HEADLINING |
| 4. INSTALL INSTRUMENT PANEL ASSEMBLY |
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (w/ Airbag System) |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 6. CHECK SRS WARNING LIGHT (w/ Airbag System) |
