Home › Power Source / Network › 1GD-FTV (BATTERY / CHARGING) › GENERATOR › from 2020.05
RM35X0E _57 Power Source / Network _078663 1GD-FTV BATTERY / CHARGING _0386629 GENERATOR A

1GD-FTV BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator bracket to the generator assembly with the bolt.

Torque:
32 N*m (326 kgf*cm, 24 ft.*lbf)


b.

Install the generator assembly with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


c.

Attach the wire harness clamp and connect the wire harness to the generator bracket.


d.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


e.

Install the terminal cap.


f.

Connect the generator connector to the generator assembly.


Hide 16361A 2.INSTALL FAN AND GENERATOR V BELT

Hide 17303T 3.INSTALL AIR PIPE SUB-ASSEMBLY (for Air Cooled Type Intercooler)

Hide 12601B 4.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ Cover)

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 6. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART