2014 Hilux · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Aug 2012 – Jul 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL FLOOR SHIFT ASSEMBLY

G037855E01
  1. Install the floor shift with the 4 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. G037854E01
    Connect the clamp and 2 connectors.

  1. Move the shift lever to L.

  1. Connect the transmission control cable.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


4. ADJUST SHIFT LEVER POSITION
  1. Adjust the shift lever position (Click here).


5. INSPECT SHIFT LEVER POSITION
  1. Inspect the shift lever position (Click here).


6. INSTALL CONSOLE BOX ASSEMBLY
  1. Install the console box assembly (Click here).

← INSTALLATION (Jun 2011 – Jul 2012)INSTALLATION (from Aug 2013) →