When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
After removing the injection pipes, clean them with a brush and compressed air.
1.INSTALL TIMING GEAR CASE ASSEMBLY
2.INSTALL OIL STRAINER SUB-ASSEMBLY
3.INSTALL OIL PAN SUB-ASSEMBLY
4.INSTALL INJECTION GEAR
5.INSTALL CRANKSHAFT TIMING GEAR
6.INSTALL NO. 1 IDLE GEAR SHAFT
7.INSTALL NO. 1 IDLE GEAR
8.INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
9.INSTALL TIMING GEAR COVER
10.INSTALL CRANKSHAFT PULLEY
11.INSTALL PUMP DRIVE SHAFT PULLEY
Install a new O-ring to the fuel supply pump.
Temporarily install the fuel supply pump with the nut.
Using SST, hold the crankshaft pulley and tighten the nut.
Install the No. 2 camshaft timing pulley flange and pump drive shaft pulley with the 4 bolts.
Using a dial indicator, check the thrust clearance of the pump drive shaft while moving the pump drive shaft pulley back and forth.
0.15 to 0.55 mm (0.00591 to 0.0217 in.)
If the clearance is not within the specified range, remove and reinstall the fuel supply pump and pump drive shaft pulley. Then repeat the step above.
12.INSTALL CRANKSHAFT POSITION SENSOR
13.INSTALL CAMSHAFT POSITION SENSOR
14.INSTALL VANE PUMP ASSEMBLY
15.INSTALL VACUUM PUMP ASSEMBLY
16.INSTALL ENGINE WATER PUMP ASSEMBLY
17.INSTALL NO. 2 TIMING BELT COVER
18.INSTALL CAMSHAFT TIMING PULLEY
19.INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
20.INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY
21.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
22.INSTALL NO. 3 NOZZLE LEAKAGE PIPE
23.INSTALL NO. 2 FUEL PIPE
24.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
25.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY WITH NO. 2 EGR VALVE AND COOLER
26.INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System)
27.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
28.INSTALL GENERATOR BRACKET
29.INSTALL GENERATOR ASSEMBLY
30.INSTALL NO. 2 IDLE PULLEY ASSEMBLY
31.INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY
32.INSTALL TIMING BELT
33.INSTALL NO. 1 TIMING BELT COVER
34.INSTALL ENGINE ASSEMBLY
36.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
37.BLEED AIR FROM FUEL SYSTEM
38.ADD ENGINE COOLANT
39.BLEED AIR FROM POWER STEERING SYSTEM
40.INSPECT FOR POWER STEERING FLUID LEVEL
41.PERFORM REGISTRATION
Perform registration of the injector compensation codes (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).
Perform pilot quantity learning (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).
42.INSPECT FOR OIL LEAK
43.INSPECT FOR COOLANT LEAK
44.INSPECT FOR EXHAUST GAS LEAK
45.INSPECT FOR FUEL LEAK
46.INSPECT ENGINE OIL LEVEL