1.INSPECT TORQUE CONVERTER ASSEMBLY
2.INSTALL TORQUE CONVERTER ASSEMBLY
Attach the splines of the input shaft and turbine runner.
Attach the splines of the stator shaft and stator while turning the torque converter assembly.
If the stator shaft splines are difficult to engage with the stator splines, move the torque converter back approximately 10 mm (0.393 in.) and engage the splines while rotating the torque converter assembly.
Turn the torque converter to engage the key of the oil pump drive gear with the slot on the torque converter assembly.
| *1 | Engine Surface |
| *2 | Drive Plate Surface |
Using a vernier caliper and straightedge, measure dimension A between the transmission contact surface of the engine and the torque converter contact surface of the drive plate.
Make sure to deduct the thickness of the straightedge.
Using a vernier caliper and straightedge, measure dimension B shown in the illustration and check that dimension B is more than dimension A, which was measured in the previous step.
B = A + 1.00 mm (0.0394 in.) or more
Make sure to deduct the thickness of the straightedge.
If the transaxle is installed to the engine with the torque converter not sufficiently inserted, the torque converter may be damaged.
3.INSTALL TRANSFER ASSEMBLY
4.INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
| *1 | Torque Converter Centerpiece |
| *2 | Crankshaft |
Apply clutch spline grease to the surface of the crankshaft that contacts the torque converter centerpiece.
Toyota Genuine Clutch Spline Grease or equivalent
Approximately 1.0 g (0.0353 oz)
Install the transmission to the engine with the 5 bolts.
Confirm that the 2 knock pins are installed to the surface of the engine cylinder block that contacts the transmission before installing the transmission.
5.INSTALL DRIVE PLATE AND TORQUE CONVERTER SETTING BOLT
Turn the crankshaft to gain access to the installation locations of the 6 torque converter clutch setting bolts and install each bolt through the hole of the flywheel while holding the crankshaft pulley bolt with a wrench.
Install the black colored bolt first, and then the silver colored 5 bolts.
6.INSTALL STIFFENER PLATE
Install the No. 2 end plate.
Install the No. 4 cylinder block insulator.
Install the stiffener plate LH to the engine and transmission with the 4 bolts.
Install the stiffener plate RH (with oil cooler tube clamp) to the engine and transmission with the 4 bolts.
7.INSTALL STARTER ASSEMBLY
8.CONNECT WIRE HARNESS
Connect the 8 connectors and attach the 7 clamps.
Connect the wire harness to the automatic transmission housing with the bolt.
Connect the ground cable with the nut.
9.INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR
Install the engine mounting insulator to the transmission with the 4 bolts.
10.INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Connect the ends of the frame crossmember to the vehicle with the 4 bolts and 4 nuts.
Install the No. 3 frame crossmember to the engine mounting insulator with the 4 set bolts.
11.INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET
Install the control cable bracket with the 2 bolts.
12.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Move the shift lever to N.
Turn the control shaft lever clockwise until it stops, and then turn it counterclockwise 2 notches to set it to the N position.
Connect the transmission control cable to the transmission control cable bracket with a new clip, and then connect the cable end to the control shaft lever with the nut.
13.CONNECT OIL COOLER TUBE
Connect the end of the inlet oil cooler tube to the automatic transmission by hand.
Connect the end of the outlet oil cooler tube to the automatic transmission by hand.
Install the 3 clamps with the 3 bolts.
Using a union nut wrench, tighten the inlet and outlet tubes.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
14.INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
15.INSTALL FRONT PROPELLER SHAFT ASSEMBLY
16.INSTALL FRONT EXHAUST PIPE ASSEMBLY
17.INSTALL TRANSFER HIGH AND LOW SHIFT LEVER ASSEMBLY
| *1 | Select Return Spring |
While pushing the select return spring to the left with the end of the transfer high and low shift lever, insert the end of the shift lever into the shift fork.
| *1 | Shift Lever Cap |
While holding down the shift lever cap, install the snap ring to install the transfer high and low shift lever.
Return the transfer front drive shift boot to its original position.
18.INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot with the 4 screws.
19.INSTALL CONSOLE BOX ASSEMBLY
20.ADJUST SHIFT LEVER POSITION
21.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
22.ADD TRANSFER OIL
23.ADD AUTOMATIC TRANSMISSION FLUID
24.INSPECT SHIFT LEVER POSITION
25.INSPECT FOR EXHAUST GAS LEAK
26.INSTALL NO. 2 ENGINE UNDER COVER
27.INSTALL NO. 1 ENGINE UNDER COVER