Home › Engine / Hybrid System › 1GR-FE ENGINE CONTROL › SFI SYSTEM › from 2012.10
RM1840EF _51 Engine / Hybrid System _009572 1GR-FE ENGINE CONTROL _0052127 SFI SYSTEM J

1GR-FE ENGINE CONTROL  SFI SYSTEM  Fuel Pump Control Circuit  


DESCRIPTION

WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses for circuits related to this system before performing the following inspection procedure.


PROCEDURE

1.PERFORM ACTIVE TEST USING INTELLIGENT TESTER (OPERATE C/OPN RELAY)
a.

Connect an intelligent tester to the DLC3.


b.

Turn the ignition switch to ON and turn the tester on.


c.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump/Speed.

Powertrain > Engine > Active Test
Tester Display
Control the Fuel Pump / Speed
50004 61 5

d.

Check whether the fuel pump operation sound occurs when performing the Active Test on the tester.

OK:

Fuel pump operating sound occurs.



Result:
Proceed to
OK
NG



OK

2.INSPECT RELAY (F-PMP/FFV)

NG

5.INSPECT NO.1 INTEGRATION RELAY (C/OPN RELAY)
2.INSPECT RELAY (F-PMP/FFV)

Result:
Proceed to
OK
NG



OK

3.INSPECT FUEL PUMP RESISTER (RESISTANCE)

NG

REPLACE RELAY (F-PMP/FFV)

3.INSPECT FUEL PUMP RESISTER (RESISTANCE)
a.

Inspect the fuel pump resistor.

Click hereEngine / Hybrid System>1GR-FE FUEL>FUEL PUMP RESISTOR>INSPECTION


Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (FUEL PUMP RESISTOR - F-PMP/FFV RELAY, FUEL PUMP)

NG

4.CHECK HARNESS AND CONNECTOR (FUEL PUMP RESISTOR - F-PMP/FFV RELAY, FUEL PUMP)
a.

Disconnect the fuel pump resistor connector.


b.

Remove the F-PMP/FFV relay from the engine room relay block and junction block assembly.


c.

Disconnect the fuel pump connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
F-PMP/FFV relay terminal 5 - A76-1 Always Below 1 Ω
A76-2 - L4-4 Always Below 1 Ω
F-PMP/FFV relay terminal 5 or A76-1 - Body ground Always 10 kΩ or higher
A76-2 or L4-4 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.INSPECT NO.1 INTEGRATION RELAY (C/OPN RELAY)

Result:
Proceed to
OK
NG



OK

6.CHECK HARNESS AND CONNECTOR (NO.1 INTEGRATION RELAY - ECM)

NG

REPLACE NO.1 INTEGRATION RELAY

6.CHECK HARNESS AND CONNECTOR (NO.1 INTEGRATION RELAY - ECM)
a.

Remove the No.1 integration relay from the engine room relay block and junction block assembly.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1J-7 - G155-10 (FC) Always Below 1 Ω
1J-7 or G155-10 (FC) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

7.INSPECT RELAY (F-PMP/FFV)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.INSPECT RELAY (F-PMP/FFV)

Result:
Proceed to
OK
NG



OK

8.INSPECT FUEL PUMP

NG

REPLACE RELAY (F-PMP/FFV)

8.INSPECT FUEL PUMP
a.

Result:
Proceed to
OK
NG



OK

9.CHECK HARNESS AND CONNECTOR (FUEL PUMP - F-PMP/FFV RELAY, BODY GROUND)

NG

9.CHECK HARNESS AND CONNECTOR (FUEL PUMP - F-PMP/FFV RELAY, BODY GROUND)
a.

Disconnect the fuel pump connector.


b.

Remove the F-PMP/FFV relay from the engine room relay block and junction block assembly.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
L4-4 - F-PMP/FFV relay terminal 4 Always Below 1 Ω
L4-5 - Body ground Always Below 1 Ω
L4-4 or F-PMP/FFV relay terminal 4 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

10.CHECK HARNESS AND CONNECTOR (NO.1 INTEGRATION RELAY - F-PMP/FFV RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.CHECK HARNESS AND CONNECTOR (NO.1 INTEGRATION RELAY - F-PMP/FFV RELAY)
a.

Remove the No.1 integration relay from the engine room relay block and junction block assembly.


b.

Remove the F-PMP/FFV relay from the engine room relay block and junction block assembly.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1J-8 - F-PMP/FFV relay terminal 3 Always Below 1 Ω
1J-8 or F-PMP/FFV relay terminal 3 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

11.INSPECT ECM POWER SOURCE CIRCUIT

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

11.INSPECT ECM POWER SOURCE CIRCUIT

Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR