1.DRAIN DIFFERENTIAL OIL
2.REMOVE REAR PROPELLER SHAFT ASSEMBLY
3.REMOVE REAR DRIVE PINION NUT
Using SST and a hammer, loosen the staked part of the nut.
| *a | Turn |
| *b | Hold |
Using SST to hold the companion flange in place, remove the nut.
4.REMOVE REAR DRIVE PINION COMPANION FLANGE SUB-ASSEMBLY WITH DUST DEFLECTOR
Using SST, remove the companion flange with dust deflector.
Before using SST (center bolt), apply hypoid gear oil to its threads and tip.
5.REMOVE REAR DIFFERENTIAL CARRIER OIL SEAL
| *1 | Oil Seal |
| *2 | Oil Slinger |
Using SST, remove the oil seal.
6.REMOVE REAR DIFFERENTIAL DRIVE PINION OIL SLINGER
Remove the oil slinger from the drive pinion.
7.REMOVE REAR DRIVE PINION FRONT TAPERED ROLLER BEARING
Using SST, remove the roller bearing (inner).
Using SST, tap out the roller bearing (outer).
8.REMOVE REAR DIFFERENTIAL DRIVE PINION BEARING SPACER
Remove the bearing spacer from the drive pinion.
9.INSTALL REAR DIFFERENTIAL DRIVE PINION BEARING SPACER
Install a new bearing spacer.
Make sure the spacer is installed correctly.
10.INSTALL REAR DRIVE PINION FRONT TAPERED ROLLER BEARING
Using SST and a hammer, tap in the roller bearing (outer).
Install the roller bearing (inner).
11.INSTALL REAR DIFFERENTIAL DRIVE PINION OIL SLINGER
Install the oil slinger to the drive pinion.
12.INSTALL REAR DIFFERENTIAL CARRIER OIL SEAL
Apply MP grease to the lip of the oil seal.
| *a | Oil Seal Depth |
Using SST and a hammer, tap in a new oil seal.
0.5 +/-0.3mm (0.02 +/-0.0118in.)
13.INSTALL REAR DRIVE PINION COMPANION FLANGE SUB-ASSEMBLY WITH DUST DEFLECTOR
Using SST, install the companion flange with dust deflector.
Before using SST (center bolt), apply hypoid gear oil to its threads and tip.
Apply hypoid gear oil LSD to drive pinion thread and nut seat face.
| *a | Turn |
| *b | Hold |
Using SST to hold the companion flange in place, install a new nut.
or less
14.INSPECT DIFFERENTIAL DRIVE PINION PRELOAD
Using a torque wrench, measure the preload.
| Bearing | Specified Condition |
|---|---|
| New bearing | 1.5 to 2.1 N*m (16 to 21 kgf*cm, 14 to 18 in.*lbf) |
| Reused bearing | 0.7 to 1.0 N*m (8 to 10 kgf*cm, 7 to 8 in.*lbf) |
If the result is not as specified, adjust the preload (See page Drivetrain>AXLE AND DIFFERENTIAL>REAR DIFFERENTIAL CARRIER ASSEMBLY>REASSEMBLY).
15.INSPECT TOTAL PRELOAD
Using a torque wrench, measure the preload with the teeth of the drive pinion and ring gear in contact.
| Bearing | Specified Condition |
|---|---|
| New bearing | 0.4 to 0.5 N*m (4 to 6 kgf*cm, 4 to 5 in.*lbf) + drive pinion preload |
| Reused bearing | 0.4 to 0.5 N*m (4 to 6 kgf*cm, 4 to 5 in.*lbf) + drive pinion preload |
If the result is not as specified, adjust the preload.
16.STAKE DRIVE PINION NUT
Using a chisel and hammer, stake the nut.
17.INSTALL REAR PROPELLER SHAFT ASSEMBLY
18.ADD DIFFERENTIAL OIL