Home › Engine / Hybrid System › 2TR-FE INTAKE / EXHAUST › INTAKE MANIFOLD › from 2013.08
RM1880E _51 Engine / Hybrid System _013213 2TR-FE INTAKE / EXHAUST _0068488 INTAKE MANIFOLD A

2TR-FE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 1.INSTALL INTAKE MANIFOLD

a.

Install the purge line hose to the intake manifold.


b.

Install the 2 wire harness clamp brackets to the intake manifold with the 2 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


c.

Install a new gasket to the intake manifold.


d.
A252739
1.917,0.146 2.073,0.302 0.156,0.156 10 true 1 2.469,0.281 2.729,0.458 0.26,0.177 10 true 2 3.094,0.146 3.323,0.406 0.229,0.26 10 true 4 1.135,0.333 1.333,0.5 0.198,0.167 10 true 3 0.198,0.24 0.323,0.417 0.125,0.177 10 true 5 1.208,1.917 1.344,2.073 0.135,0.156 10 true 7 2.156,1.958 2.271,2.115 0.115,0.156 10 true 6
V100135

Bolt
V100136

Nut


Install the intake manifold with the 5 bolts and 2 nuts, and tighten the bolts and nuts in the sequence shown in the illustration.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


e.

for Automatic Transmission:

Install the oil filler tube bracket with the bolt.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


f.

Connect the No. 3 PCV hose and vacuum hose to the intake manifold.


g.

Attach the No. 2 water by-pass hose.


h.

for RHD:

Connect the engine wire with the bolt.

Torque:
26 N*m (264 kgf*cm, 19 ft.*lbf)


i.

Attach the No. 1 fuel hose to the intake manifold.


j.

Attach the 3 wire harness clamps to the 2 wire harness clamp brackets.


Hide 3.INSTALL FRONT UPPER FENDER APRON SEAL

a.

Install the front upper fender apron seal with the 6 clips.


Hide 4.INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

Hide 5.INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY (for Automatic Transmission)

Hide 6.INSTALL STARTER ASSEMBLY

Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).