2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

P0617 Starter Relay Circuit High

Diagnostic trouble codes · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

While the engine is being cranked, positive battery voltage is applied to terminal STA of the ECM.
If the ECM detects the starter control (STA) signal while the vehicle is being driven, it determines that there is a malfunction in the STA circuit. The ECM then illuminates the MIL and stores the DTC.
This monitor runs when the vehicle has been driven at 20 km/h (12.5 mph) or more for more than 20 seconds.
P0617 
DTC Detection Drive Pattern
DTC Detection Condition
Trouble Area
Drive the vehicle for 25 seconds or more at a speed of 20 km/h (12.5 mph) or more and an engine speed of 1000 rpm or more
Conditions (a), (b) and (c) are met for 20 seconds (1 trip detection logic):
(a) Vehicle speed is more than 20 km/h (12.5 mph).
(b) Engine speed is more than 1000 rpm.
(c) STA signal is on.
  1. Starter relay circuit
  2. Ignition switch assembly
  3. Clutch pedal switch assembly*1
  4. Park/neutral position switch assembly*2
*1: for Manual Transmission
*2: for Automatic Transmission
Related Data List 
DTC No.
Data List
P0617
Starter Signal

WIRING DIAGRAM

A311402E01
A269767E02

INSPECTION PROCEDURE

NOTICE:
After replacing the ECM, the new ECM needs registration (Click here) and initialization (Click here).

HINT:
  1. The following troubleshooting process is based on the premise that the engine can crank normally. If the engine does not crank, proceed to Problem Symptoms Table (Click here).
  2. If this DTC is output, inspect the starter.


1. CHECK IF VEHICLE IS EQUIPPED WITH ENTRY AND START SYSTEM
  1. Check if the vehicle is equipped with the entry and start system.

    Result 
    Result
    Proceed to
    w/ Entry and Start System
    A
    w/o Entry and Start System
    B



B
Go to step 11
A


2. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the tester on.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Read the value displayed on the tester when the ignition switch is turned to ON.

    OK:
    Switch Condition
    Starter Signal
    Ignition switch ON
    OFF

Result 
Result
Proceed to
NG (for Manual Transmission)
A
NG (for Automatic Transmission)
B
OK
C


B
Go to step 7

C
Go to step 26
A


3. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the clutch pedal switch assembly connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A41-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the clutch pedal switch assembly connector.

  1. Reconnect the power management control ECU connector.



NG
Go to step 25
OK


4. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - ST RELAY)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the clutch pedal switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or A41-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the clutch pedal switch assembly connector.



NG
Go to step 25
OK


5. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - ECM)
  1. Disconnect the ECM connector.

  1. Disconnect the clutch pedal switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    G57-6 (STA) or A41-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    G57-6 (STA) or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reconnect the clutch pedal switch assembly connector.



NG
Go to step 25
OK


6. INSPECT CLUTCH PEDAL SWITCH ASSEMBLY
  1. Inspect the clutch pedal switch assembly (Click here).



OK
Go to step 21

NG
Go to step 22
7. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the park/neutral position switch connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C40-4 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reconnect the power management control ECU connector.



NG
Go to step 25
OK


8. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or C40-5 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the park/neutral position switch connector.



NG
Go to step 25
OK


9. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM)
  1. Disconnect the ECM connector.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C40-5 or G57-6 (STA) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reconnect the park/neutral position switch connector.



NG
Go to step 25
OK


10. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the park/neutral position switch assembly (Click here).



OK
Go to step 21

NG
Go to step 23
11. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the tester on.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Read the value displayed on the tester when the ignition switch is turned to ON.

    OK:
    Switch Condition
    Starter Signal
    Ignition switch ON
    OFF



OK
Go to step 26

NG
Go to step 12
12. INSPECT IGNITION SWITCH
  1. Inspect the ignition switch assembly (Click here).

Result 
Result
Proceed to
OK (for Manual Transmission)
A
OK (for Automatic Transmission)
B
NG
C


B
Go to step 17

C
Go to step 24
A


13. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - IGNITION SWITCH)
  1. Disconnect the clutch pedal switch assembly connector.

  1. Disconnect the ignition switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A41-2 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the clutch pedal switch assembly connector.

  1. Reconnect the ignition switch assembly connector.



NG
Go to step 25
OK


14. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - ST RELAY)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the clutch pedal switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or A41-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the clutch pedal switch assembly connector.



NG
Go to step 25
OK


15. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - ECM)
  1. Disconnect the ECM connector.

  1. Disconnect the clutch pedal switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    G57-6 (STA) or A41-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    G57-6 (STA) or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reconnect the clutch pedal switch assembly connector.



NG
Go to step 25
OK


16. INSPECT CLUTCH PEDAL SWITCH ASSEMBLY
  1. Inspect the clutch pedal switch assembly (Click here).



OK
Go to step 21

NG
Go to step 22
17. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - IGNITION SWITCH)
  1. Disconnect the park/neutral position switch connector.

  1. Disconnect the ignition switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C40-4 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reconnect the ignition switch assembly connector.



NG
Go to step 25
OK


18. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or C40-5 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the park/neutral position switch connector.



NG
Go to step 25
OK


19. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM)
  1. Disconnect the ECM connector.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C40-5 or G57-6 (STA) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reconnect the park/neutral position switch connector.



NG
Go to step 25
OK


20. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the park/neutral position switch assembly (Click here).



NG
Go to step 23
OK


21. REPLACE ECM
  1. Replace the ECM (Click here).



NEXT
Go to step 26
22. REPLACE CLUTCH PEDAL SWITCH ASSEMBLY
  1. Replace the clutch pedal switch assembly (Click here).



NEXT
Go to step 26
23. REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Replace the park/neutral position switch assembly (Click here).



NEXT
Go to step 26
24. REPLACE IGNITION SWITCH
  1. Replace the ignition switch assembly (Click here).



NEXT
Go to step 26
25. REPAIR OR REPLACE HARNESS OR CONNECTOR
  1. Repair or replace the harness or connector.


NEXT


26. CONFIRM WHETHER DTC OUTPUT RECURS
  1. Connect the intelligent tester to the DLC3.

  1. Clear the DTCs (Click here).

  1. Turn the ignition switch off.

  1. Turn the ignition switch to ON.

  1. Drive the vehicle for 25 seconds or more at a speed of 20 km/h (12.5 mph) or more and an engine speed of 1000 rpm or more.

  1. Confirm that the DTC is not output again.


NEXT

END


← P0606 ECM / PCM Processor (+ P060A, P060B, P1607) (from Aug 2014)P0617 Starter Relay Circuit High (from Aug 2014) →