2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

ECM Power Source Circuit

Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The ECM "MREL" output signal causes a current to flow to the coil, closing the contacts of the EFI relay and supplying power to terminal +B of the ECM.

WIRING DIAGRAM

A264726E01

INSPECTION PROCEDURE

NOTICE:
  1. Inspect the fuses of circuits related to this system before performing the following inspection procedure.
  2. After replacing the ECM, the new ECM needs registration (Click here) and initialization (Click here).


1. INSPECT NO. 1 INTEGRATION RELAY (NO. 1 INTEGRATION RELAY - BODY GROUND)

  1. A223349E02
    Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1C-1 - Body ground
    Always
    11 to 14 V

    *1
    Engine Room Relay Block
    *a
    Front view of wire harness connector
    (to No. 1 integration Relay)

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2. INSPECT NO. 1 INTEGRATION RELAY (EFI , IG2)
  1. Inspect the No. 1 integration relay (EFI) (Click here).

  1. Inspect the No. 1 integration relay (IG2) (Click here).



NG
REPLACE NO. 1 INTEGRATION RELAY
OK


3. INSPECT ECM (IGSW VOLTAGE)

  1. A177861E24
    Turn the ignition switch to ON.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    G58-24 (IGSW) - C93-1 (E1)
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (to ECM)

Result 
Result
Proceed to
OK
A
NG (w/ Entry and Start System)
B
NG (w/o Entry and Start System)
C


B
Go to step 5

C
Go to step 6
A


4. CHECK WIRE HARNESS (NO. 1 INTEGRATION RELAY - ECM)
  1. Check the wire harness between the ECM and No. 1 integration relay.

  1. Disconnect the ECM connector.

  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    G58-11 (MREL) - 1B-2
    Always
    Below 1 Ω
    G57-24 (+B) - 1B-4
    Always
    Below 1 Ω
    G57-17 (+B2) - 1B-4
    Always
    Below 1 Ω
    G58-24 (IGSW) - 1A-5
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    G58-11 (MREL) or 1B-2 - Body ground
    Always
    10 kΩ or higher
    G57-24 (+B) or 1B-4 - Body ground
    Always
    10 kΩ or higher
    G57-17 (+B2) or 1B-4 - Body ground
    Always
    10 kΩ or higher
    G58-24 (IGSW) or 1A-5 - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM (Click here)

5. CHECK WIRE HARNESS (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)
  1. Remove the power management control ECU.

  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    G50-8 (IG2D) - 1A-1
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    G50-8 (IG2D) or 1A-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the power management control ECU.

  1. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

CHECK ENTRY AND START SYSTEM (Click here)

6. CHECK WIRE HARNESS (IGNITION SWITCH ASSEMBLY - NO. 1 INTEGRATION RELAY)
  1. Disconnect the ignition switch assembly connector.

  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    G2-6 (IG2) - 1A-1
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    G2-6 (IG2) or 1A-1 - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ignition switch assembly connector.

  1. Reinstall the No. 1 integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


7. INSPECT IGNITION SWITCH ASSEMBLY
  1. Inspect the ignition switch assembly (Click here).



NG
REPAIR OR REPLACE IGNITION OR STARTER SWITCH ASSEMBLY
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH ASSEMBLY - BATTERY)


← Turbocharger Noise (from Aug 2014)ECM Power Source Circuit (from Aug 2014) →