2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

Starter Signal Circuit

Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

While the engine is being cranked, current flows from terminal ST1 of the ignition switch (w/o entry and start system) or terminal STAR of the power management control ECU (w/ entry and start system) to the park/neutral position switch (for automatic transmission) or clutch start switch (for manual transmission) and also flows to terminal STA of the ECM (STA Signal).

WIRING DIAGRAM

Refer to DTC P0617 (Click here).

INSPECTION PROCEDURE

NOTICE:
Inspect the fuses of circuits related to this system before performing the following inspection procedure.

HINT:
This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table (Click here).


1. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the tester on.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Read the value.

    OK:
    Ignition Switch Position
    Starter Signal
    ON
    OFF
    START
    ON



NG
Go to step 2
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)

2. CHECK STARTER RELAY (ST) (POWER SOURCE)

  1. A227736E01
    Remove the starter relay (ST) from the engine room relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 5 - Body ground
    Engine cranking
    11 to 14 V

    HINT:
    The engine does not crank because the relay is not installed.

    Result 
    Result
    Proceed to
    OK
    A
    NG (w/ Entry and start system)
    for Manual transmission
    B
    for Automatic transmission
    C
    NG (w/o Entry and start system)
    for Manual transmission
    D
    for Automatic transmission
    E
    Text in Illustration 
    *1
    Engine Room Relay Block
    *2
    Starter relay (ST)

  1. Reinstall the starter relay (ST).



B
Go to step 5

C
Go to step 8

D
Go to step 11

E
Go to step 14
A


3. INSPECT STARTER RELAY (ST)
  1. Inspect the starter relay (ST) (Click here).



NG
REPLACE STARTER RELAY (ST)
OK


4. CHECK HARNESS AND CONNECTOR (STARTER RELAY (ST) - BODY GROUND)
  1. Remove the ST relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 2 - Body ground
    Always
    Below 1 Ω

  1. Reinstall the starter relay (ST).



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - BODY GROUND)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - CLUTCH PEDAL SWITCH OR PARK/NEUTRAL POSITION SWITCH)

5. CHECK HARNESS AND CONNECTOR (STARTER RELAY (ST) - CLUTCH START SWITCH)
  1. Remove the starter relay (ST) from the engine room relay block.

  1. Disconnect the clutch start switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 1 - A40-1
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 1 - r1-1
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or A40-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the starter relay (ST).

  1. Reconnect the clutch start switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - CLUTCH START SWITCH)
OK


6. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the clutch start switch connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A40-2 - G50-3 (STAR)
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 - G50-3 (STAR)
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A40-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the clutch start switch connector.

  1. Reconnect the power management control ECU connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (CLUTCH START SWITCH - POWER MANAGEMENT CONTROL ECU)
OK


7. INSPECT CLUTCH START SWITCH ASSEMBLY
  1. Inspect the clutch start switch assembly (Click here).



NG
REPLACE CLUTCH START SWITCH ASSEMBLY (Click here)
OK

GO TO ENTRY AND START SYSTEM (Click here)

8. CHECK HARNESS AND CONNECTOR (STARTER RELAY (ST) - PARK/NEUTRAL POSITION SWITCH)
  1. Remove the starter relay (ST) from the engine room relay block.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 - C40-5
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or C40-5 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the starter relay (ST).

  1. Reconnect the park/neutral position switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - PARK/NEUTRAL POSITION SWITCH)
OK


9. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the park/neutral position switch connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    C40-4 - G50-3 (STAR)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    C40-4 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reconnect the power management control ECU connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - POWER MANAGEMENT CONTROL ECU)
OK


10. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the park/neutral position switch assembly (Click here).



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
OK

GO TO ENTRY AND START SYSTEM (Click here)

11. CHECK HARNESS AND CONNECTOR (STARTER RELAY (ST) - CLUTCH START SWITCH)
  1. Remove the starter relay (ST) from the engine room relay block.

  1. Disconnect the clutch start switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 1 - A40-1
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 1 - r1-1
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or A40-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the starter relay (ST).

  1. Reconnect the clutch start switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - CLUTCH START SWITCH)
OK


12. CHECK HARNESS AND CONNECTOR (CLUTCH START SWITCH - IGNITION SWITCH)
  1. Disconnect the clutch start switch connector.

  1. Disconnect the ignition switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A40-2 - G2-1 (ST1)
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 - G2-1 (ST1)
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A40-2 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the clutch start switch connector.

  1. Reconnect the ignition switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (CLUTCH START SWITCH - IGNITION SWITCH)
OK


13. INSPECT CLUTCH START SWITCH ASSEMBLY
  1. Inspect the clutch start switch assembly (Click here).



NG
REPLACE CLUTCH START SWITCH ASSEMBLY (Click here)
OK

REPLACE IGNITION SWITCH ASSEMBLY (Click here)

14. CHECK HARNESS AND CONNECTOR (STARTER RELAY (ST) - PARK/NEUTRAL POSITION SWITCH)
  1. Remove the starter relay (ST) from the engine room relay block.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 - C40-5
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    Starter relay (ST) terminal 1 or C40-5 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the starter relay (ST).

  1. Reconnect the park/neutral position switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - PARK/NEUTRAL POSITION SWITCH)
OK


15. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - IGNITION SWITCH)
  1. Disconnect the park/neutral position switch connector.

  1. Disconnect the ignition switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    C40-4 - G2-1 (ST1)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    C40-4 or G2-1 (ST1) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reconnect the ignition switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - IGNITION SWITCH)
OK


16. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the park/neutral position switch assembly (Click here).



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
OK

REPLACE IGNITION SWITCH ASSEMBLY (Click here)


← Fuel Injector Circuit (from Aug 2014)Starter Signal Circuit (from Aug 2014) →