2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

Starter Signal Circuit

Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

While the engine is being cranked, current flows from terminal STAR of the power management control ECU to the park/neutral position switch and also flows to terminal STA of the ECM (STA Signal).

WIRING DIAGRAM

Refer to DTC P0617 (Click here).

INSPECTION PROCEDURE

NOTICE:
  1. Inspect the fuses of circuits related to this system before performing the following inspection procedure.
  2. After replacing the ECM, the new ECM needs registration (Click here) and initialization (Click here).
  3. After replacing the fuel supply pump assembly, the ECM needs initialization (Click here).
  4. After replacing an injector assembly, the ECM needs registration (Click here).

HINT:
This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to Problem Symptoms Table (Click here).


1. READ VALUE USING INTELLIGENT TESTER (STARTER SIGNAL)
  1. Connect the intelligent tester to the DLC3.

  1. Turn the engine switch on (IG).

  1. Turn the tester on.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Read the value.

    OK:
    Engine Switch Condition
    Starter Signal
    On (IG)
    OFF
    START
    ON



NG
Go to step 2
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

2. CHECK ST RELAY (POWER SOURCE)

  1. A227731E01
    Remove the ST relay from the engine room relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 5 - Body ground
    Engine cranking
    11 to 14 V

    Text in Illustration 
    *1
    Engine Room Relay Block
    *2
    ST Relay

    HINT:
    The engine does not crank because the relay is not installed.

    Result 
    Result
    Proceed to
    OK
    A
    NG (for Manual Transmission)
    B
    NG (for Automatic Transmission)
    C

  1. Reinstall the ST relay.



B
Go to step 5

C
Go to step 8
A


3. INSPECT ST RELAY
  1. Inspect the ST relay (Click here).



NG
REPLACE ST RELAY
OK


4. CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
  1. Remove the ST relay from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 1 - Body ground
    Always
    Below 1 Ω

  1. Reinstall the ST relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - BODY GROUND)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - CLUTCH PEDAL SWITCH ASSEMBLY OR PARK/NEUTRAL POSITION SWITCH ASSEMBLY)

5. CHECK HARNESS AND CONNECTOR (ST RELAY - CLUTCH PEDAL SWITCH ASSEMBLY)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the clutch pedal switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 - A41-1
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 - r1-1
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or A41-1 - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or r1-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the clutch pedal switch assembly connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - CLUTCH PEDAL SWITCH ASSEMBLY)
OK


6. CHECK HARNESS AND CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the clutch pedal switch assembly connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A41-2 - G50-3 (STAR)
    Always
    Below 1 Ω
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 - G50-3 (STAR)
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    for LHD 
    Tester Connection
    Condition
    Specified Condition
    A41-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher
    for RHD 
    Tester Connection
    Condition
    Specified Condition
    r1-2 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the clutch pedal switch assembly connector.

  1. Reconnect the power management control ECU connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (CLUTCH PEDAL SWITCH ASSEMBLY - POWER MANAGEMENT CONTROL ECU)
OK


7. INSPECT CLUTCH PEDAL SWITCH
  1. Inspect the clutch pedal switch assembly (Click here).



NG
REPLACE CLUTCH PEDAL SWITCH (Click here)
OK

GO TO ENTRY AND START SYSTEM (Click here)

8. CHECK HARNESS AND CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH)
  1. Remove the ST relay from the engine room relay block.

  1. Disconnect the park/neutral position switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 - C40-5
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    ST relay terminal 2 or C40-5 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the ST relay.

  1. Reconnect the park/neutral position switch connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - PARK/NEUTRAL POSITION SWITCH)
OK


9. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - POWER MANAGEMENT CONTROL ECU)
  1. Disconnect the park/neutral position switch connector.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    C40-4 - G50-3 (STAR)
    Always
    Below 1 Ω


    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    C40-4 or G50-3 (STAR) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the park/neutral position switch connector.

  1. Reconnect the power management control ECU connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - POWER MANAGEMENT CONTROL ECU)
OK


10. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
  1. Inspect the park/neutral position switch assembly (Click here).



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
OK

GO TO ENTRY AND START SYSTEM (Click here)


← VC Output Circuit (from Aug 2014)Starter Signal Circuit (from Aug 2014) →