2013-2015 Land Cruiser Prado · Service Manual Brake

VSC Buzzer Circuit

Circuit diagnosis · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

The skid control ECU (master cylinder solenoid) is connected to the combination meter assembly via CAN communication.
The combination meter assembly has a built-in buzzer.

WIRING DIAGRAM

C230884E10

INSPECTION PROCEDURE

NOTICE:
When replacing the skid control ECU (master cylinder solenoid), perform calibration (Click here).


1. CHECK CAN COMMUNICATION LINE
  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the intelligent tester on.

  1. Select CAN Bus Check from the System Selection Menu screen and follow the prompts on the screen to inspect the CAN bus (for LHD: Click here, for RHD: Click here).

    OK:
    CAN Bus Check indicates no malfunctions in CAN communication.

    Result 
    Result
    Proceed to
    OK
    A
    NG (for LHD)
    B
    NG (for RHD)
    C



B
GO TO CAN COMMUNICATION SYSTEM (HOW TO PROCEED WITH TROUBLESHOOTING) (Click here)

C
GO TO CAN COMMUNICATION SYSTEM (HOW TO PROCEED WITH TROUBLESHOOTING) (Click here)
A


2. PERFORM ACTIVE TEST USING INTELLIGENT TESTER (BUZZER)
  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the intelligent tester on.

  1. Enter the following menus: Chassis / ABS/VSC/TRC / Active Test.

    ABS/VSC/TRC 
    Tester Display
    Test Part
    Control Range
    Diagnostic Note
    Buzzer
    Buzzer
    Buzzer ON/OFF
    The buzzer can be heard.

  1. When performing the Buzzer Active Test, check Buzzer in the Data List (Click here).

    ABS/VSC/TRC 
    Tester Display
    Measurement Item/Range
    Normal Condition
    Diagnostic Note
    Buzzer
    Buzzer/ ON or OFF
    ON: Buzzer on
    OFF: Buzzer off
    The combination meter has a built-in buzzer.
    Result 
    Result
    Proceed to
    Data List Display
    Data List Display when Performing Active Test ON/OFF Operation
    ON
    Changes between ON and OFF
    A
    Does not change between ON and OFF
    B
    OFF
    Changes between ON and OFF
    A
    Does not change between ON and OFF
    B



B
Go to step 3
A

GO TO METER / GAUGE SYSTEM (HOW TO PROCEED WITH TROUBLESHOOTING) (Click here)

3. INSPECT COMBINATION METER ASSEMBLY
  1. Inspect the combination meter assembly (Click here).

    Result 
    Result
    Proceed to
    NG
    A
    OK (for LHD)
    B
    OK (for RHD)
    C



B
REPLACE MASTER CYLINDER SOLENOID (Click here)

C
REPLACE MASTER CYLINDER SOLENOID (Click here)
A

REPLACE COMBINATION METER ASSEMBLY (Click here)


← VSC Buzzer Circuit (Aug 2013 – Jul 2014)TC and CG Terminal Circuit (Aug 2013 – Jul 2014) →