2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.


1. INSTALL CAMSHAFT

  1. G036616E02
    Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.
    Text in Illustration 
    *1
    Key

    HINT:
    Set the No. 1 cylinder to 90° BTDC/compression to prevent the top of the piston from hitting against the valve head.

  1. A060149E04
    Install the camshaft.

    1. Apply engine oil to the thrust portion of the camshaft.

    2. Place the camshaft on the cylinder head with the key groove facing upward.

      Text in Illustration 
      *1
      Key Groove
      *a
      Upward

    3. A060150E01
      Align the timing marks (1-dot marks) of the camshaft drive and driven main gears and set the No. 2 camshaft in place.

  1. Remove any old seal packing (FIPG material) from the camshaft bearing cap.

  1. A060283E05
    Apply seal packing to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.157 in.)

    Text in Illustration 
    *1
    Seal Packing
    *2
    Oil Passage

    NOTICE:
    1. Do not allow seal packing to contact the oil passage of the bearing cap.
    2. After applying seal packing, install the camshaft bearing caps within 3 minutes and tighten the bolts within 15 minutes.
    3. Do not start the engine for at least 2 hours after installation.

  1. A060146E01
    Install the 5 bearing caps to their proper locations.

  1. A060147E02
    Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.

  1. Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. A060145E01
    Install a new camshaft oil seal.

    1. Apply MP grease to the lip of a new oil seal.

    2. Using SST and a hammer, tap in the oil seal until its surface is flush with the surfaces of the camshaft bearing cap and cylinder head.

      SST
      09608-06041  


2. INSTALL NO. 2 TIMING BELT COVER

  1. A060279E02
    Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    After applying seal packing, install the No. 2 timing belt cover within 3 minutes and tighten the bolts and nut within 15 minutes.

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


3. INSTALL CAMSHAFT TIMING PULLEY
  1. Install the camshaft timing pulley.

  1. Install the bolt of the camshaft timing pulley while holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }


4. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY
  1. Using a 10 mm hexagon wrench, install a new washer and the No. 1 timing belt idler with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Check that the idler pulley moves smoothly.
    If the idler pulley does not move smoothly, check the installation condition of the idler and washer.


5. INSTALL TIMING BELT

  1. A070691E05
    Check that the timing marks are aligned as shown in the illustration.
    Text in Illustration 
    *1
    Timing Mark

    HINT:
    If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of crankshaft revolution.

    NOTICE:
    1. Make sure that the engine is cold.
    2. When turning the crankshaft, the valve heads will hit against the piston. Do not turn the crankshaft more than necessary.

  1. Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.

  1. A070548E01
    Place the tensioner upright. Then set a press on the top of the tensioner.

    NOTICE:
    1. Do not scratch or deform the rod end.
    2. Press in the tensioner rod.
    3. Protect the tip of the push rod with a cloth in order to prevent damage.

  1. Using the press, slowly push in the push rod using 981 to 9807 N (100 to 1000 kgf, 220 to 2205 lbf) of force.

    NOTICE:
    Do not apply a load of over 9807 N (1000 kgf, 2205 lbf) to the push rod.

  1. Align the holes of the push rod and housing. Then pass a 1.5 mm hexagon wrench through the holes to fix the push rod in place.

  1. Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts.

  1. A059983E01
    Remove the 1.5 mm hexagon wrench from the tensioner.

  1. A070549E05
    Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.
    Text in Illustration 
    *1
    Timing Mark


6. INSPECT AND ADJUST VALVE CLEARANCE
(Click here)

7. INSTALL NO. 1 TIMING BELT COVER
  1. Install the timing belt cover and 6 washers with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


8. INSTALL FAN SHROUD
  1. Install the fan pulley to the engine water pump assembly.

  1. Install the No. 2 water by-pass hose to the water inlet.

  1. Temporarily install the shroud together with the fan with fluid coupling to the engine water pump assembly with the 4 nuts. Tighten the nuts as much as possible by hand.

  1. A218370
    Attach the claws of the shroud to the radiator as shown in the illustration.

  1. Install the fan shroud to the radiator with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the fan and generator V belt (Click here).

  1. Install the fan with fluid coupling to the engine water pump assembly with the 4 nuts.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }

  1. Attach the No. 2 water by-pass hose to the clamp on the fan shroud.

  1. for Automatic Transmission:

    1. A224967E02
      Connect the 2 oil cooler hoses.
      Text in Illustration 
      *a
      RH Side
      *b
      2.0 to 7.0 mm
      *c
      View A

      HINT:
      1. Position the hose clamps as shown in the illustration.
      2. Position the clips so that the distance from the end of the hose is 2.0 to 7.0 mm (0.0787 to 0.275 in.).

    2. Attach the 2 oil cooler hoses to the clamp on the fan shroud.

  1. Connect the No. 2 water by-pass hose to the radiator reservoir.

  1. Connect the No. 1 water by-pass hose to the fan shroud and attach the 2 clamps.

  1. Install the radiator reservoir with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


9. INSTALL NO. 1 RADIATOR HOSE

A224966E01
  1. Install the radiator hose and attach the clamp.

    Text in Illustration 
    *1
    Protrusion
    *2
    Paint Mark
    *a
    Top
    *b
    LH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.


10. INSTALL INJECTOR ASSEMBLY

NOTICE:
Be sure to install the injector assembly, No. 1 nozzle holder clamp, washer and bolt in their original positions.

  1. A239583
    Install 4 new injection nozzle seats to the cylinder head sub-assembly.

  1. Apply a small amount of clean engine oil to 4 new O-rings.

  1. A231908E01
    Install one of the O-rings to each injector assembly as shown in the illustration.
    Text in Illustration 
    *1
    O-Ring

  1. Insert the 4 injector assemblies into the cylinder head sub-assembly.

    NOTICE:
    1. Insert the injector assembly until it touches the injection nozzle seat surface.
    2. After installing the injector assembly to the cylinder head sub-assembly, the O-ring may prevent the injector assembly from being fully seated. If so, pull out the injector assembly and reinstall it.
    3. Always reinstall an injector assembly to the same place it was removed from.

  1. For an injector assembly that has been replaced with a new injector assembly, register the injector compensation code (Click here).

  1. A100922E02
    Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
    Text in Illustration 
    *1
    Washer
    *a
    Downward

    HINT:
    Apply a small amount of engine oil to the threads and under the heads of the clamp bolts.


    NOTICE:
    G037744E05
    1. The fork portion of the No. 1 nozzle holder clamp must be set on the injector assembly.
    2. Before tightening the bolts, check that the No. 1 nozzle holder clamp is set properly.
    3. When installing the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a following step.
    4. When tightening the bolts, be careful so as not to tilt the bolt or clamp.
    5. Do not reuse the washer.
    6. If the nozzle leakage pipe assembly is accidentally tightened beyond the torque specification, it must be replaced.
      Text in Illustration 
      *1
      No. 1 Nozzle Holder Clamp

  1. Temporarily install the 4 injection pipe sub-assemblies with the union nuts.

    HINT:
    To position the injector assemblies, loosely tighten the union nut.

  1. A062123E01
    Check the nozzle leakage pipe assembly. Check that there are no scratches or dents on the 5 union seal surfaces.
    If scratches or dents are present, replace the nozzle leakage pipe assembly.

  1. A076602E02
    Set the nozzle leakage pipe assembly and 5 new gaskets in place.

  1. Apply a small amount of oil to the 4 injector hollow screws and union bolt.

  1. Temporarily install the nozzle leakage pipe assembly with the 4 injector hollow screws and union bolt.

  1. Tighten the 4 nozzle holder clamp bolts.

    Torque:
    22 N*m{ 220 kgf*cm , 16 ft.*lbf }

  1. A076779E05
    Tighten the 4 injector hollow screws in order from 1 to 4.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    Text in Illustration 
    *1
    Union Bolt

    NOTICE:
    If an injector hollow screw is accidentally tightened beyond the torque specification, it must be replaced.

  1. Tighten the union bolt.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.

  1. Remove the 4 injection pipe sub-assemblies.


11. INSPECT FOR FUEL LEAK

  1. A239627E01
    Check that there are no leaks from the nozzle leakage pipe assembly connection.

    1. Install a new gasket and the No. 2 nozzle leakage pipe to the cylinder head sub-assembly with SST (check valve).

      Part No.:
      23762-27010 (No. 2 nozzle leakage pipe)
      90904-30012 (Gasket)

      SST
      09280-00010  

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    2. Apply a small amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe assembly connection.

    3. A239628E01
      Install SST (turbocharger pressure gauge) to the fuel return side of the nozzle leakage pipe assembly, maintain 100 kPa (1.0 kgf/cm2, 15 psi) of pressure for 60 seconds and check that no bubbles form.
      SST
      09992-00242  

    4. After checking for fuel leaks, wipe off the soapy water from the nozzle leakage pipe assembly connection.

    5. Remove SST, the No. 2 nozzle leakage pipe and gasket.

      NOTICE:
      Never reinstall the disassembled union bolt to the engine.


12. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A289512E01
    Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover sub-assembly in the directions shown in the illustration.
    Text in Illustration 
    *1
    No. 3 Cylinder Head Cover Gasket
    *2
    Cylinder Head Cover Sub-assembly

    NOTICE:
    1. Do not install the No. 3 cylinder head cover gaskets at an angle.
    2. Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.

  1. Remove any old seal packing (FIPG material) from the cylinder head sub-assembly.

  1. A060179E06
    Apply seal packing to the areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100155
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover sub-assembly within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the cylinder head cover sub-assembly.

  1. Install a new cylinder head cover gasket to the cylinder head cover sub-assembly.

  1. A223193E01
    Temporarily install the cylinder head cover sub-assembly with the 10 bolts and 2 nuts in the order shown in the illustration. Then, tighten the 10 bolts and 2 nuts in the order shown in the illustration in 2 progressive steps.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install 4 new nozzle holder seals.


13. INSTALL VENTILATION PIPE
  1. Connect the 2 ventilation hoses and install the ventilation pipe to the cylinder head sub-assembly with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Type A
    Connect the No. 3 turbo water hose and No. 4 turbo water hose to the ventilation pipe.


14. INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A244984E01
    Install the No. 2 cylinder head cover sub-assembly with the 4 bolts.

    Torque:
    for bolt A:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }
    for bolt B:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


15. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

  1. A329756E01
    Temporarily install the No. 2 nozzle leakage pipe assembly with the 2 bolts.
    Text in Illustration 
    V100136
    Union Bolt

  1. Temporarily install a new gasket and the union bolt.

  1. Tighten the 2 bolts and union bolt.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }
    for union bolt:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


16. INSTALL NO. 3 NOZZLE LEAKAGE PIPE

  1. A239519E01
    Apply a light coat of fuel to the O-ring of the fuel check valve.
    Text in Illustration 
    *1
    O-Ring

  1. A239625E01
    Temporarily install the No. 3 nozzle leakage pipe with the 2 bolts.
    Text in Illustration 
    *1
    Gasket
    V100136
    Fuel Check Valve

  1. Temporarily install a new gasket and fuel check valve.

  1. Tighten the 2 bolts and fuel check valve.

    Torque:
    for bolt:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }
    for fuel check valve:
    32 N*m{ 321 kgf*cm , 23 ft.*lbf }

    NOTICE:
    Make sure the gasket of fuel check valve A contacts the No. 3 nozzle leakage pipe as shown in the illustration when tightening the fuel check valve.

  1. Connect the 2 fuel hoses.


17. INSTALL NO. 2 FUEL PIPE

  1. A239520E01
    Apply a light coat of fuel to the O-ring of the fuel check valve.
    Text in Illustration 
    *1
    O-Ring

  1. A329757E01
    Temporarily install the No. 2 fuel pipe with a new gasket and the union bolt.
    Text in Illustration 
    *1
    Gasket
    V100135
    Union Bolt
    V100136
    Fuel Check Valve
    V100137
    Bolt

  1. Temporarily install a new gasket and the fuel check valve.

  1. Temporarily install the bolt.

  1. Using a 6 mm hexagon wrench, tighten the union bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    NOTICE:
    Make sure the gasket of union bolt A contacts the No. 2 fuel pipe as shown in the illustration when tightening the union bolt.

  1. Tighten the fuel check valve.

    Torque:
    32 N*m{ 321 kgf*cm , 23 ft.*lbf }

  1. Tighten the bolt.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }


18. INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing an injector assembly, it is necessary to replace the 4 injection pipe sub-assemblies with new ones.
  2. Keep the joints of the injection pipe sub-assembly clean.

  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install the 2 No. 2 injection pipe clamps with the bolt and nut.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. A329093E01
    Using a 17 mm union nut wrench, tighten the No. 4 injection pipe sub-assembly union nut on the common rail assembly side.

    Torque:
    Specified tightening torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    Text in Illustration 
    *a
    Torque Wrench Fulcrum Length

    HINT:
    1. Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (Click here).
    2. When using a union nut wrench (fulcrum length of 30 mm (1.1811 in.)) + torque wrench (fulcrum length of 300 mm (11.8110 in.)): 32 N*m (324 kgf*cm, 23 ft.*lbf)

  1. A329093E01
    Using a 17 mm union nut wrench, tighten the injection pipe sub-assembly union nuts on the injector assembly side.

    Torque:
    Specified tightening torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    Text in Illustration 
    *a
    Torque Wrench Fulcrum Length

    HINT:
    1. Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (Click here).
    2. When using a union nut wrench (fulcrum length of 30 mm (1.1811 in.)) + torque wrench (fulcrum length of 300 mm (11.8110 in.)): 32 N*m (324 kgf*cm, 23 ft.*lbf)


19. INSTALL NO. 1 FUEL PIPE
  1. Temporarily install the No. 1 fuel pipe with the 4 bolts.

  1. Temporarily install a new gasket with the union bolt.

  1. Tighten the union bolt and 4 bolts in the order shown in the illustration.

    Torque:
    for union bolt:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }
    for bolt:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Connect the No. 2 fuel pipe (Click here).

    A239663E02

    Text in Illustration 
    *1
    No. 2 Fuel Pipe
    -
    -
    V100136
    Union Bolt
    -
    -


20. INSTALL INTAKE AIR CONNECTOR

  1. A222611E01
    Set a new gasket on the intake manifold.
    Text in Illustration 
    *1
    Claw

    NOTICE:
    Make sure the claw of the gasket faces the intake manifold as shown in the illustration.

  1. Install the intake air connector with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


21. INSTALL GAS FILTER BRACKET
  1. Install the gas filter bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the clamp and connect the wire harness.


22. INSTALL NO. 1 GAS FILTER
  1. Install the No. 1gas filter to the gas filter bracket.

  1. Connect the vacuum hose.


23. INSTALL THROTTLE BODY BRACKET

  1. A244614E01
    Temporarily install the throttle body bracket with the 3 bolts.

  1. Tighten the 3 bolts of the throttle body bracket in the order shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


24. INSTALL EMISSION CONTROL VALVE BRACKET
  1. Install the emission control valve bracket with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


25. INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR
  1. Install the manifold absolute pressure sensor with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the vacuum hose and manifold absolute pressure sensor connector.


26. CONNECT WIRE HARNESS
  1. Attach the 5 clamps and connect the wire harness to the cowl top panel.

  1. for LHD:
    Connect the wire harness with the bolt.

    Torque:
    22 N*m{ 219 kgf*cm , 16 ft.*lbf }

  1. Connect the wire harness with the bolt.

    Torque:
    13 N*m{ 131 kgf*cm , 9 ft.*lbf }


27. INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY
  1. Install a new gasket and the electric EGR control valve to the intake air connector.

  1. Connect the electric EGR control valve connector.


28. TEMPORARILY INSTALL EGR COOLER WITH NO. 2 EGR VALVE ASSEMBLY
  1. Install a new gasket to the stud bolts of the intake air connector.

  1. Install a new gasket to the stud bolts of the cylinder head.

  1. Install the EGR valve adapter to the electric EGR control valve and intake air connector with the 2 nuts and bolt labeled A.

  1. Temporarily install the EGR cooler to the intake manifold with the 2 bolts labeled B in the illustration.

  1. Temporarily install the EGR cooler to the cylinder head with the 2 nuts labeled C in the illustration.

    A239656E02

    Text in Illustration 
    *1
    New Gasket
    *2
    EGR Valve Adapter
    *3
    EGR Cooler
    *4
    Electric EGR Control Valve
    *5
    Intake Air Connector
    -
    -


29. TIGHTEN EGR COOLER WITH NO. 2 EGR VALVE ASSEMBLY
  1. Tighten the 2 bolts labeled A in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 nuts labeled B in the illustration.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Install the air connector stay with the 3 bolts labeled C in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 nuts and bolt labeled D in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Install the No. 1 fuel pipe to the air connector stay with the bolt labeled E.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }


    A239657E01
    Text in Illustration 
    *1
    Air Connector Stay
    *2
    No. 1 Fuel Pipe

  1. Connect the fuel pressure sensor connector to the common rail.

  1. Connect the 4 injector connectors and attach the 3 wire harness clamps.


30. INSTALL NO. 4 ENGINE COVER BRACKET
  1. Install the No. 4 engine cover bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


31. INSTALL ENGINE COVER BRACKET INSULATOR

  1. A239398E01
    Install the 2 engine cover bracket insulators with the 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    Text in Illustration 
    *1
    Claw

    HINT:
    Make sure that the claws of the engine cover bracket insulators contact the engine cover brackets.


32. INSTALL NO. 3 ENGINE COVER BRACKET
  1. Install the No. 3 engine cover bracket with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


33. INSTALL WIRING HARNESS CLAMP BRACKET
  1. Install the wiring harness clamp bracket.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 2 wire harness clamps and connect the glow plug connector to the wiring harness clamp bracket.

  1. Connect the glow plug connector.


34. INSTALL NO. 1 VACUUM TRANSMITTING PIPE
  1. Install the No. 1 vacuum transmitting pipe with the bolt.

    Torque:
    18 N*m{ 178 kgf*cm , 13 ft.*lbf }

  1. Connect the vacuum hose to the intake manifold.


35. INSTALL WATER BY-PASS HOSE

HINT:
  1. When connecting the hoses, make sure the paint marks and clips are as shown in the illustration.
  2. The direction of each hose clamp is indicated in the illustration.

  1. Connect the No. 5 water by-pass hose labeled A in the illustration.

  1. Connect the No. 6 water by-pass hose labeled B in the illustration.

  1. Connect the No. 8 water by-pass hose labeled C in the illustration.

  1. Connect the No. 3 water by-pass hose labeled D in the illustration.

  1. Connect the No. 4 water by-pass hose labeled E in the illustration.

  1. Connect the No. 7 water by-pass hose labeled F in the illustration.

  1. Attach the 4 water by-pass hose clamps.

    A239675E01

    Text in Illustration 
    *1
    Paint Mark
    -
    -
    *a
    Upper Side
    *b
    LH Side


36. CONNECT HEATER WATER PIPE SUB-ASSEMBLY
  1. Install the heater water pipe with the bolt.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }

  1. Attach the water by-pass hose clamp.


37. INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
  2. Keep the joints of the injection pipe clean.

  1. Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.

  1. Install the 2 No. 2 injection pipe clamps with the 2 bolts.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Install the No. 3 injection pipe clamp with the 2 nuts.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).


38. INSTALL FUEL INLET PIPE SUB-ASSEMBLY
  1. Temporarily install the fuel inlet pipe with the union nuts.

    NOTICE:
    1. When replacing the fuel supply pump, it is necessary to replace the fuel inlet pipe with a new one.
    2. Keep the fuel inlet pipe free of foreign matter.

  1. Install the No. 2 injection pipe clamp with the bolt.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Using a 17 mm union nut wrench, tighten the fuel inlet pipe union nut on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a 17 mm union nut wrench, tighten the fuel inlet pipe union nut on the fuel supply pump side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).


39. INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE

  1. A244966E02
    Install the manifold stay with vacuum switching valve with the 2 bolts and connect the No. 4 vacuum transmitting hose and No. 1 vacuum transmitting hose.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

    Text in Illustration 
    *1
    White Mark
    *2
    Blue Mark

    NOTICE:
    Make sure the vacuum transmitting hose color matches the connection area color.

  1. A245681E02
    Connect the 2 No. 2 vacuum transmitting hoses shown in the illustration.
    Text in Illustration 
    *1
    Yellow Mark
    *2
    No. 2 EGR Valve

    HINT:
    1. Make sure that the vacuum transmitting hose with the yellow mark is connected to the side of the No. 2 EGR valve that has a yellow mark as shown in the illustration.
    2. Push on the vacuum transmitting hose until it reaches the bent part of the pipe.

  1. Connect the No. 1 vacuum transmitting hose.

  1. Connect the 3 vacuum switching valve connectors.


40. CONNECT VANE PUMP OIL RESERVOIR ASSEMBLY

  1. A239651E01
    Temporarily install the vane pump oil reservoir with the 3 bolts.

  1. Tighten the 3 bolts of the vane pump oil reservoir in the order shown in the illustration.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


41. INSTALL INJECTOR DRIVER
  1. Install the injector driver assembly with the 2 bolts.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }

  1. Connect the 4 connectors.


42. INSTALL DIESEL THROTTLE BODY ASSEMBLY
  1. Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle control motor connector.


43. INSTALL NO. 1 INTAKE PIPE
  1. Connect the No. 1 intake pipe with the No. 1 air hose and install the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Connect the 2 connectors to the intake air temperature sensor and throttle position sensor.

  1. Attach the 2 wire harness clamps.


44. CONNECT INTERCOOLER AIR HOSE

  1. A239591E01
    Connect the intercooler air hose and tighten the hose clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    Text in Illustration 
    *a
    Front Side of Vehicle
    *b
    RH Side

    HINT:
    Install the hose clamp so that it is facing the direction shown in the illustration.


45. CONNECT NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
  1. Connect the No. 4 vacuum transmitting pipe with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


46. INSTALL FRONT FENDER APRON SEAL LH
  1. Install the front fender apron seal LH with the 5 clips.


47. INSTALL FRONT WHEEL LH

Torque:
for Aluminum Wheel:
103 N*m{ 1050 kgf*cm , 76 ft.*lbf }
for Steel Wheel:
112 N*m{ 11378 kgf*cm , 82 ft.*lbf }


48. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
(Click here)

49. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


50. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the B line of the reservoir tank.

    Standard Capacity:
    Item
    Specified Condition
    for Automatic Transmission
    w/ Rear Heater
    14.9 liters (15.7 US qts, 13.1 Imp. qts)
    w/o Rear Heater
    13.1 liters (13.8 US qts, 11.5 Imp. qts)
    for Manual Transmission
    w/ Rear Heater
    15.0 liters (15.8 US qts, 13.2 Imp. qts)
    w/o Rear Heater
    13.2 liters (13.9 US qts, 11.6 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    2. Please contact your TOYOTA dealer for further details.
    3. for Cold Area Specification Vehicles:
      Please contact any authorized TOYOTA dealer or repairer or another duly qualified and equipped professional for further details.

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the No. 1 and No. 2 inlet and No. 1 and No. 2 outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.

  1. Using a wrench, install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

    2. Maintain the engine speed at a speed between 2500 and 3000 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      2. Be careful as the radiator hoses are hot.
      3. Keep your hands away from the radiator fan.

    4. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:
      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. After the coolant cools down, check that the coolant level is at the FULL line.
    If the coolant level is below the FULL line, add TOYOTA SLLC to the FULL line.


51. BLEED AIR FROM FUEL SYSTEM

  1. A223284
    Using the hand pump mounted on the fuel filter cap, bleed air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. The maximum hand pump pumping speed is 2 strokes per second.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use and the engine cannot be started.

  1. Check if the engine starts.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the engine switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the engine switch on (IG) and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1

  1. A194065E05
    Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
    Text in Illustration 
    *a
    Reference
    (Active Test Operation)

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3

  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the 5th time.

    A192848E04

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.


52. INSPECT FOR COOLANT LEAK

NOTICE:
Before each inspection, turn the A/C switch off.

CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.


53. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the areas that were worked on.


54. INSPECT FOR FUEL LEAK
  1. Perform the Active Test.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Powertrain / Engine and ECT / Active Test.

    5. Perform the Active Test.

      Intelligent Tester Display
      Test Part
      Control Range
      Diagnostic Note
      Test the Fuel Leak
      Pressurize common rail interior and check for fuel leaks
      Stop/Start
      1. The fuel pressure inside the common rail increases to the specified value and the engine speed increases to 2000 rpm when the Active Test is performed.
      2. The above conditions are maintained while the Active Test is being performed.


55. INSPECT ENGINE OIL LEVEL
  1. Warm up the engine, stop the engine and wait 5 minutes. The engine oil level should be between the dipstick low level mark and full level mark.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.


56. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


57. INSTALL FRONT BUMPER LOWER COVER
  1. Install the front bumper lower cover with the clip and 5 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


58. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. Install the upper radiator support seal with the 13 clips.


59. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A239588E01
    Attach the 2 No. 1 engine cover hooks to the No. 3 engine cover bracket.
    Text in Illustration 
    *1
    No. 1 Engine Cover Hook
    *2
    No. 3 Engine Cover Bracket

  1. Install the 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

← INSTALLATION (Aug 2013 – Jul 2014)COMPONENTS (from Aug 2013) →