2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

ECM Power Source Circuit

Circuit diagnosis · Vehicles built from Aug 2013

DESCRIPTION

When the ignition switch is turned to ON, battery voltage is applied to terminal IGSW of the ECM. The output signal from the MREL terminal of the ECM causes current to flow to the coil, closing the contacts of the integration relay (EFI relay) and supplying power to terminal +B of the ECM.

WIRING DIAGRAM

A311897E01

INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.


1. CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    C64-5 (E1) - Body ground
    Always
    Below 1 Ω

  1. Reconnect the ECM connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND)
OK


2. INSPECT ECM (IGSW VOLTAGE)
A177861E27
  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    G60-22 (IGSW) - Body ground
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Component with harness connected
    (ECM)



NG
Go to step 8
OK


3. INSPECT INTEGRATION RELAY (EFI RELAY)
  1. Inspect the integration relay (EFI relay) (Click here).



NG
REPLACE INTEGRATION RELAY (EFI RELAY)
OK


4. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [EFI RELAY] - ECM)
  1. Remove the integration relay (EFI relay) from the engine room relay block.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1B-4 - G59-23 (+B)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1B-4 or G59-23 (+B) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [EFI RELAY] - ECM)
OK


5. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [EFI RELAY] - BATTERY)
  1. Remove the integration relay (EFI relay) from the engine room relay block.

  1. Disconnect the cable from the negative (-) battery terminal.

  1. Disconnect the cable from the positive (+) battery terminal.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1C-1 - Positive battery terminal
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1C-1 or Positive battery terminal - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the integration relay.

  1. Reconnect the cable to the positive (+) battery terminal.

  1. Reconnect the cable to the negative (-) battery terminal.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [EFI RELAY] - BATTERY)
OK


6. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [EFI RELAY] - BODY GROUND)
  1. Remove the integration relay (EFI relay) from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1B-3 - Body ground
    Always
    Below 1 Ω

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [EFI RELAY] - BODY GROUND)
OK


7. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [EFI RELAY] - ECM)
  1. Disconnect the ECM connector.

  1. Remove the integration relay (EFI relay) from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1B-2 - G60-12 (MREL)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1B-2 or G60-12 (MREL) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [EFI RELAY] - ECM)
OK

REPLACE ECM (Click here)

8. INSPECT INTEGRATION RELAY (IG2 RELAY)
  1. Inspect the integration relay (IG2 relay) (Click here).



NG
REPLACE INTEGRATION RELAY (IG2 RELAY)
OK


9. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - ECM)
  1. Disconnect the ECM connector.

  1. Remove the integration relay (IG2 relay) from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1A-5 - G60-22 (IGSW)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1A-5 or G60-22 (IGSW) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ECM connector.

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - ECM)
OK


10. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - BATTERY)
  1. Remove the integration relay (IG2 relay) from the engine room relay block.

  1. Disconnect the cable from the negative (-) battery terminal.

  1. Disconnect the cable from the positive (+) battery terminal.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1C-1 - Positive battery terminal
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1C-1 or Positive battery terminal - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the integration relay.

  1. Reconnect the cable to the positive (+) battery terminal.

  1. Reconnect the cable to the negative (-) battery terminal.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - BATTERY)
OK


11. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - BODY GROUND)
  1. Remove the integration relay (IG2 relay) from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1A-3 - Body ground
    Always
    Below 1 Ω

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - BODY GROUND)
OK


12. CHECK IF VEHICLE IS EQUIPPED WITH ENTRY AND START SYSTEM
  1. Confirm the entry and start system.

    Result 
    Result
    Proceed to
    w/ Entry and Start System
    A
    w/o Entry and Start System
    B



B
Go to step 14
A


13. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)
  1. Remove the No. 1 integration relay from the engine room relay block.

  1. Disconnect the power management control ECU connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    G50-8 (IG2D) - 1A-1
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    G50-8 (IG2D) or 1A-1 - Body ground
    Always
    10 kΩ or higher

  1. Reinstall the No. 1 integration relay.

  1. Reconnect the power management control ECU connector.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)
OK

CHECK ENTRY AND START SYSTEM (Click here)

14. CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - IGNITION SWITCH)
  1. Disconnect the ignition switch connector.

  1. Remove the integration relay (IG2 relay) from the engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    1A-1 - G2-6 (IG2)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    1A-1 or G2-6 (IG2) - Body ground
    Always
    10 kΩ or higher

  1. Reconnect the ignition switch connector.

  1. Reinstall the integration relay.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY [IG2 RELAY] - IGNITION SWITCH)
OK


15. INSPECT IGNITION SWITCH ASSEMBLY
  1. Inspect the ignition switch assembly (Click here).



NG
REPLACE IGNITION SWITCH ASSEMBLY (Click here)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY)


← P2A00 A/F Sensor Circuit Slow Response (Bank 1 Sensor 1) (from Aug 2014)VC Output Circuit (Aug 2013 – Jul 2014) →