When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The ECM "MREL" output signal causes a current to flow to the coil, closing the contacts of the EFI relay and supplying power to terminal +B of the ECM.
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION) and initialization (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>INITIALIZATION).
Remove the No. 1 integration relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1C-1 - Body ground | Always | 11 to 14 V |
| *1 | Engine Room Relay Block |
| *a | Front view of wire harness connector
(to No. 1 integration Relay) |
Reinstall the integration relay.
OK
NG
Inspect the No. 1 integration relay (EFI) (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).
Inspect the No. 1 integration relay (IG2) (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).
OK
NG
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| G58-24 (IGSW) - C93-1 (E1) | Ignition switch ON | 11 to 14 V |
| *a | Component with harness connected
(to ECM) |
| Result | Proceed to |
|---|---|
| OK | A |
| NG (w/ Entry and Start System) | B |
| NG (w/o Entry and Start System) | C |
A
B
C
Check the wire harness between the ECM and No. 1 integration relay.
Disconnect the ECM connector.
Remove the No. 1 integration relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G58-11 (MREL) - 1B-2 | Always | Below 1 Ω |
| G57-24 (+B) - 1B-4 | Always | Below 1 Ω |
| G57-17 (+B2) - 1B-4 | Always | Below 1 Ω |
| G58-24 (IGSW) - 1A-5 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G58-11 (MREL) or 1B-2 - Body ground | Always | 10 kΩ or higher |
| G57-24 (+B) or 1B-4 - Body ground | Always | 10 kΩ or higher |
| G57-17 (+B2) or 1B-4 - Body ground | Always | 10 kΩ or higher |
| G58-24 (IGSW) or 1A-5 - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
OK
NG
Remove the power management control ECU.
Remove the No. 1 integration relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G50-8 (IG2D) - 1A-1 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G50-8 (IG2D) or 1A-1 - Body ground | Always | 10 kΩ or higher |
Reinstall the power management control ECU.
Reinstall the No. 1 integration relay.
OK
NG
Disconnect the ignition switch assembly connector.
Remove the No. 1 integration relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G2-6 (IG2) - 1A-1 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G2-6 (IG2) or 1A-1 - Body ground | Always | 10 kΩ or higher |
Reconnect the ignition switch assembly connector.
Reinstall the No. 1 integration relay.
OK
NG
Inspect the ignition switch assembly (See page Engine / Hybrid System>1KD-FTV (STARTING)>IGNITION SWITCH>INSPECTION).
OK
NG