Home › Engine / Hybrid System › 1GR-FE (ENGINE MECHANICAL) › ENGINE UNIT
RM27T0E _51 Engine / Hybrid System _053662 1GR-FE ENGINE MECHANICAL _0260494 ENGINE UNIT A

1GR-FE ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


PROCEDURE

Hide 13453 1.INSTALL FLYWHEEL RING GEAR (for Manual Transmission)

a.
A177670E03
2.115,1.125 2.531,0.865 2.531,0.865 2.677,0.865 true 1.354,0.323 0.792,0.688 0.792,0.688 0.573,0.688 true 1.406,0.458 0.927,1.156 0.927,1.156 0.677,1.156 true 2.708,0.781 2.885,0.948 0.177,0.167 10 false *3 0.458,1.083 0.646,1.271 0.188,0.188 10 false *2 0.344,0.479 0.542,0.646 0.198,0.167 10 false *1

Using a torch, heat the ring gear evenly to approximately 200°C (392°F).

Text in Illustration
*1 Chamfer
*2 Ring Gear
*3 Flywheel

NOTICE:

Be careful not to overheat the ring gear.



b.

Using a brass bar, tap the ring gear onto the flywheel with its chamfered gear teeth facing the block.

NOTICE:

After installing, allow the ring gear to cool before handling.



Hide 12311 2.INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH

a.

Install the front No. 1 engine mounting bracket RH with the 4 bolts.

Torque:
48 N*m (489 kgf*cm, 35 ft.*lbf)


Hide 12315 3.INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH

a.

Install the front No. 1 engine mounting bracket LH with the 3 bolts.

Torque:
48 N*m (489 kgf*cm, 35 ft.*lbf)


Hide 11452 4.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

Hide 16620 5.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

Hide 16604 6.INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

Hide 16603 7.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

Hide 16206 8.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY (w/ Oil Cooler)

Hide 23250 10.INSTALL FUEL INJECTOR ASSEMBLY

Hide 23807 11.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 12.INSTALL FUEL PIPE SUB-ASSEMBLY

a.

Install the No. 1 fuel pipe and No. 2 fuel pipe with the 2 bolts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


b.

Hide 11181A 13.INSTALL REAR CYLINDER HEAD COVER

Hide 19500 14.INSTALL IGNITION COIL ASSEMBLY

a.

Install the 6 ignition coils with the 6 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25702 15.INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

a.

Install the No. 2 emission control valve set with the 3 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 25701 16.INSTALL EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

a.

Install the emission control valve set with the 3 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 17.INSTALL HEATER WATER HOSE ASSEMBLY

a.

w/o Warmer:

Install the heater water hose assembly and connect the 2 hoses.


b.

w/ Warmer:

Install the heater water hose assembly and connect the 3 hoses.


Hide 18.INSTALL ENGINE WIRE