Home › Engine / Hybrid System › 1GD-FTV (STARTING) › STARTER (for 2.7 kW Type) › 2015.06–2020.08
RM27T0E _51 Engine / Hybrid System _053695 1GD-FTV STARTING _0260743 STARTER(for 2.7 kW Type) A

1GD-FTV STARTING  STARTER(for 2.7 kW Type)  REMOVAL  


PROCEDURE

Hide 1.DISCONNECT PRECAUTION

NOTICE:

After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).


Hide 2.DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See pageGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


Hide 53737A 3.REMOVE FRONT NO. 1 FENDER APRON TO FRAME SEAL LH

a.

Remove the 5 clips and front No. 1 fender apron to frame seal LH.


Hide 37140 4.REMOVE FRONT PROPELLER SHAFT ASSEMBLY

Hide 28100 6.REMOVE STARTER ASSEMBLY

a.

w/ Urea SCR System:

i.

Remove the starter assembly.



b.

w/o Urea SCR System:

i.
A351933

Open the terminal cap.


ii.

Remove the nut and disconnect the starter wire.


iii.

Disconnect the starter connector.


iv.
A343736

for Automatic Transmission:

Remove the bolt, 2 nuts and starter assembly.


v.
A357295

for Manual Transmission:

w/o Urea SCR System:

Remove the 4 bolts, 3 nuts, clip, and then disconnect the clutch release cylinder assembly.


vi.
A357294

for Manual Transmission:

Remove the bolt, nut and starter assembly.