Home › Power Source / Network › 1KD-FTV (BATTERY / CHARGING) › GENERATOR › 2015.06–2020.08
RM27T0E _57 Power Source / Network _053726 1KD-FTV BATTERY / CHARGING _0261023 GENERATOR A

1KD-FTV BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR

a.
A222880E02
2.594,0.281 2.729,0.438 0.135,0.156 10 true A 2.719,1.885 2.854,2.031 0.135,0.146 10 true B

Install the generator with the 2 bolts.

Torque:
for bolt A : 62 N*m (632 kgf*cm, 46 ft.*lbf)
for bolt B : 21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Install the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


c.

Install the terminal cap.


d.

Connect the generator connector.


Hide 17801 4.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

Hide 16361A 7.INSTALL FAN AND GENERATOR V BELT

a.

Install the fan and generator V belt (See Page Engine / Hybrid System>1KD-FTV (ENGINE MECHANICAL)>DRIVE BELT>INSTALLATION).


Hide 8.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).