26100G
1.INSTALL DIESEL THROTTLE BODY ASSEMBLY
w/o Urea SCR System:
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
Connect the connector.
| *a | Claw |
Install 2 new gaskets and the diesel throttle body assembly and intake air connector with the 4 bolts.
The claws of the 2 gaskets must face the diesel throttle body assembly side shown in the illustration.
Connect the connector to the intake air temperature sensor.
w/ Urea SCR System:
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
Attach the clamp, and then connect the emission control valve wire to the wire harness clamp bracket.
Connect the connector.
| *a | Claw |
Install 2 new gaskets and the diesel throttle body assembly and air intake connector with the 4 bolts.
The claws of the 2 gaskets must face the diesel throttle body assembly side shown in the illustration.
Install the wire harness clamp bracket to the air intake connector with the bolt.
Connect the connector and clamp to the intake air temperature sensor and wire harness clamp bracket.
77246C
2.INSTALL FUEL MAIN TUBE SUPPORT
Install the bolt and fuel main tube support to the diesel throttle body assembly.
Attach the 2 clamps and connect the No. 1 fuel hose and breather hose to the fuel main tube support.
17030
3.INSTALL AIR HOSE ASSEMBLY (w/ Urea SCR System)
17342F
4.INSTALL NO. 2 INTERCOOLER AIR HOSE (w/o Urea SCR System)
| *a | Retainer |
| *b | Protrusion |
| *c | Stopper |
Connect the No.2 intercooler air hose to the intake air connector and intercooler assembly lock the 2 retainers as shown in the illustration.
Securely insert the retainer so that the 4 locks are engaged. Then, pull and check that the locks are engaged and that the hose cannot be pulled out.
Install so that the protrusion on the air intake connector and the stoppers are aligned.
Attach the clamp.
Connect the oil return hose and slide the 2 clips to secure the hose.
5.ADD ENGINE COOLANT
6.INSPECT FOR ENGINE COOLANT LEAK
12601B
7.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
While pushing the No. 1 engine cover sub-assembly towards the rear, attach the 2 rear pins.
| *A | w/o Urea SCR System | *B | w/ Urea SCR System |
Attach the 2 front clips to install the No. 1 engine cover sub-assembly.
8. PERFORM INITIALIZATION
w/o Urea SCR System:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM>INITIALIZATION
w/ Urea SCR System:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>INITIALIZATION