Home › Power Source / Network › 2TR-FE (BATTERY / CHARGING) › GENERATOR › from 2020.08
RM27T0E _57 Power Source / Network _053725 2TR-FE BATTERY / CHARGING _0261021 GENERATOR A

2TR-FE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator assembly with the 3 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


b.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


c.

Install the terminal cap.


d.

Connect the connector to the generator assembly.


Hide 16361A 2.INSTALL FAN AND GENERATOR V BELT

Hide 17705 3.INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE

Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 5. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART