2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL FLYWHEEL HOUSING SIDE COVER

2. INSTALL STARTER ASSEMBLY
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the terminal cap.

  1. Connect the starter connector.

  1. Connect the ground wire with the bolt.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }


3. INSTALL STARTER COVER
  1. Install the starter cover with the 3 bolts.

    Torque:
    12 N*m{ 117 kgf*cm , 8 ft.*lbf }


4. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
(Click here)

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →