2011-2013 Land Cruiser · Service Manual Vehicle Interior

HOW TO PROCEED WITH TROUBLESHOOTING

Troubleshooting · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

HINT:
  1. Use these procedures to troubleshoot the air conditioning system.
  2. *: Use the intelligent tester.


1.VEHICLE BROUGHT TO WORKSHOP
    NEXT

    2.INSPECT BATTERY VOLTAGE

      Standard voltage:
      11 to 14 V

      If the voltage is below 11 V, recharge or replace the battery before proceeding.
    NEXT

    3.CHECK COMMUNICATION FUNCTION OF CAN COMMUNICATION SYSTEM*
    1. Use the intelligent tester to check if the CAN communication system is functioning normally .

      1. for LHD: Click here.
      2. for RHD: Click here.
      Result 
      Result
      Proceed to
      CAN DTC is not output
      A
      CAN DTC is output (for LHD)
      B
      CAN DTC is output (for RHD)
      C


    B.

    C.
    A

    4.CHECK COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM*
    1. Use the intelligent tester to check if the LIN communication system is functioning normally (Click here).

      Result 
      Result
      Proceed to
      LIN DTC is not output
      A
      LIN DTC is output
      B


    B.
    A

    5.CHECK FOR DTC*
    1. Check for DTCs (Click here).

    2. Clear the DTCs (Click here).

    3. Based on the DTCs output above, try to force output of the air conditioning system DTC by simulating the conditions indicated by the DTC. Then recheck for DTCs.

      Result 
      Result
      Proceed to
      DTC is not output
      A
      DTC is output
      B


    B.
    A

    6.PROBLEM SYMPTOMS TABLE
    1. Refer to the Problem Symptoms Table (Click here).

      Result 
      Result
      Proceed to
      Fault is not listed in problem symptoms table
      A
      Fault is listed in problem symptoms table
      B


    B.
    A

    7.OVERALL ANALYSIS AND TROUBLESHOOTING*
    1. Terminals of ECU (Click here)

    2. Data List/Active Test (Click here)

    3. On-vehicle Inspection

    4. Inspection

    NEXT

    8.ADJUST, REPAIR OR REPLACE
      NEXT

      9.CONFIRMATION TEST
        NEXT

        ← HOW TO PROCEED WITH TROUBLESHOOTING (Sep 2011 – Dec 2011)CUSTOMIZE PARAMETERS (from Sep 2011) →