2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. PRECAUTION

NOTICE:
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).


2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Disconnect the cables from the negative (-) main battery and sub-battery terminals.


3. REMOVE INJECTOR DRIVER

  1. w/ DPF:

    1. A271227
      Disconnect the 7 injector driver connectors and detach the 2 wire harness clamps.

    2. A271228
      Remove the bolt and disconnect the ground wire from the No. 2 injector driver bracket.

    3. A271229
      Remove the 3 bolts and injector driver assembly.

  1. w/o DPF:

    1. A175105
      Disconnect the 4 injector driver connectors.

    2. A278340
      Detach the fuel hose clamp and wire harness clamp and remove the bolt and disconnect the ground wire from the No. 1 injector driver bracket.

    3. Remove the 3 bolts and injector driver assembly.

  1. A271230E01
    Remove the 2 bolts, No. 2 injector driver and No. 2 injector driver bracket from the No. 1 injector driver bracket.
    Text in Illustration 
    *A
    w/ DPF
    *B
    w/o DPF

  1. A271232
    w/ DPF:
    Remove the 4 screws, No. 1 injector driver bracket and No. 1 injector driver.

  1. A174982
    w/o DPF:
    Remove the 4 screws, No. 1 injector driver bracket, No. 1 injector driver and injector driver bracket.

  1. A271231
    w/ DPF:
    Remove the 4 screws, No. 2 injector driver bracket and No. 2 injector driver.

  1. A174983
    w/o DPF:
    Remove the 4 screws, No. 2 injector driver bracket, No. 2 injector driver and injector driver bracket.

← REMOVAL (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →