INSTALLATION
Removal / installation · Vehicles built from Sep 2011
- HINT:
- Use the same procedures for LHD and RHD vehicle.
- The procedure listed below are for LHD vehicle.
- Use the same procedures for LHD and RHD vehicle.
| 1. INSTALL HEADLIGHT CLEANER SWITCH ASSEMBLY |
Attach the 2 claws to install the switch.

| 2. INSTALL NO. 1 SWITCH HOLE BASE |
![]() ![]() |
Connect the connectors.
Attach the 4 claws to install the No. 1 switch hole base.
| 3. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL |
Connect the connectors.
for Automatic Air Conditioning System:

Attach the 2 claws to install the room temperature sensor.
Attach the 2 claws to connect the 2 control cables.

w/ Driver Side Knee Airbag:
Attach the 16 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.


w/o Driver Side Knee Airbag:
Attach the 9 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.


Attach the 2 claws to close the hole cover.

| 4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |
![]() ![]() |
Connect the connectors.
Attach the 3 claws to install the No. 1 instrument panel under cover.
Install the 2 screws.
| 5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
Attach the 2 claws to install the No. 2 instrument cluster finish panel garnish.


Text in Illustration *A
w/ Entry and Start System
*B
w/o Entry and Start System
| 6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
![]() ![]() |
Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.
| 7. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH |
w/o Console Box Lid:
Install the lower instrument panel pad sub-assembly LH (Click here).
w/ Cool Box:
Install the lower instrument panel pad sub-assembly LH (Click here).
w/o Cool Box:
Install the lower instrument panel pad sub-assembly LH (Click here).
| 8. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION |
w/o Console Box Lid:
Install the No. 2 instrument panel finish panel cushion (Click here).
w/ Cool Box:
Install the No. 2 instrument panel finish panel cushion (Click here).
w/o Cool Box:
Install the No. 2 instrument panel finish panel cushion (Click here).



