Home › Engine / Hybrid System › 1VD-FTV (INTAKE / EXHAUST) › EXHAUST MANIFOLD W/ TURBOCHARGER › 2014.08–2015.08
RM2660E _51 Engine / Hybrid System _052790 1VD-FTV INTAKE / EXHAUST _0255173 EXHAUST MANIFOLD W/ TURBOCHARGER A

1VD-FTV INTAKE / EXHAUST  EXHAUST MANIFOLD W/ TURBOCHARGER  INSTALLATION  


CAUTION / NOTICE / HINT

NOTICE:

w/ DPF:

When fuel lines are disconnected, air may enter the fuel lines, leading to engine starting trouble. Therefore, perform forced regeneration and bleed the air from the fuel lines (See page Engine / Hybrid System>1VD-FTV (EMISSION CONTROL)>EMISSION CONTROL SYSTEM>ON-VEHICLE INSPECTION).


PROCEDURE

Hide 15408G 1.INSTALL NO. 2 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 2)

a.
U162965E02
1.823,0.333 1.948,0.479 0.125,0.146 10 false 1 2.521,1.719 2.646,1.865 0.125,0.146 10 false 2

Temporarily install a new gasket and the No. 2 inlet turbo oil pipe with the union bolt and bolt.


b.

Tighten the union bolt and bolt in the order shown in the illustration.

Torque:
for union bolt : 29 N*m (296 kgf*cm, 21 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 15482 2.INSTALL NO. 2 TURBO OIL PIPE (for Bank 2)

a.

Install a new gasket and the No. 2 turbo oil pipe with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

HINT:

The gasket claws should face the pipe.



Hide 17286 3.INSTALL NO. 2 INLET COMPRESSOR ELBOW (for Bank 2)

a.

Install a new gasket and the No. 2 inlet compressor elbow with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

HINT:

Install the No. 2 inlet compressor elbow with the "L" mark facing toward the outside of the vehicle.



Hide 17208 4.INSTALL NO. 2 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD LH (for Bank 2)

a.

Install a new gasket to the No. 2 turbocharger.


b.

Install the exhaust manifold LH to the No. 2 turbocharger with 3 new nuts.

Torque:
69 N*m (704 kgf*cm, 51 ft.*lbf)

HINT:

The gasket claw should face toward the outside of the vehicle.



c.

w/ DPF:

i.

Install 2 new gaskets to the No. 2 exhaust manifold pipe.

HINT:

The gasket claws should face the No. 2 exhaust manifold pipe.



ii.
A264032

Temporarily install the No. 2 exhaust manifold pipe with the 4 bolts.

HINT:

Install the No. 2 exhaust manifold pipe so that it is oriented as shown in the illustration.



iii.

Tighten the 4 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)



d.

Install a new gasket to the cylinder head LH.


e.

Install the No. 2 turbocharger with exhaust manifold LH and 10 collars to the cylinder head LH with 10 new nuts.

Torque:
36 N*m (367 kgf*cm, 27 ft.*lbf)

A264035E03
0.198,0.073 0.385,0.229 0.188,0.156 10 false *A 3.969,0.073 4.156,0.229 0.188,0.156 10 false *B

Text in Illustration
*A w/ DPF *B w/o DPF

HINT:

Install the collars with the colored side facing the nuts.



f.
A177391

Install a new gasket and the No. 2 inlet turbo oil pipe to the No. 1 oil pan with the union bolt.

Torque:
29 N*m (296 kgf*cm, 21 ft.*lbf)


g.

Connect the 2 connectors to the turbocharger.


Hide 12202 5.INSTALL NO. 2 VENTILATION TUBE SUB-ASSEMBLY (for Bank 2)

a.

Temporarily install a new gasket and the No. 2 ventilation tube with the union bolt and bolt.

U163481E02
0.521,0.073 0.708,0.229 0.188,0.156 10 false *A 3.708,0.073 3.896,0.229 0.188,0.156 10 false *B 1.458,1.854 1.583,2 0.125,0.146 10 false 1 1.281,1.063 1.406,1.208 0.125,0.146 10 false 2 4.823,1.854 4.948,2 0.125,0.146 10 false 1 4.708,1.104 4.833,1.25 0.125,0.146 10 false 2

Text in Illustration
*A w/ DPF *B w/o DPF


b.

Tighten the union bolt and bolt in the order shown in the illustration.

Torque:
for union bolt : 29 N*m (296 kgf*cm, 21 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)

NOTICE:

Clean and remove any oil in the area labeled 1 in the illustration.



c.

Connect the hose.


Hide 17297 6.INSTALL NO. 2 TURBOCHARGER STAY (for Bank 2)

a.

Install the No. 2 turbocharger stay with the 2 bolts.

Torque:
49 N*m (495 kgf*cm, 36 ft.*lbf)


Hide 15492 7.INSTALL NO. 2 OUTLET TURBO OIL HOSE (for Bank 2)

HINT:
A267257E03
1.344,1.323 1.469,1.323 1.469,1.323 1.719,1.51 true 2.24,1.813 2.135,1.813 2.135,1.813 1.813,1.635 true 1.156,1.24 1.354,1.396 0.198,0.156 10 true *1 2.271,1.729 2.573,1.958 0.302,0.229 10 true *1

Align the white paint marks on the oil hose and pipe, and connect the hose.


Text in Illustration
*1 Painted Mark

Hide 16028 8.INSTALL NO. 2 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)

a.
U163525E02
2.438,1.167 2.563,1.313 0.125,0.146 10 false 1 1.427,0.938 1.552,1.083 0.125,0.146 10 false 2

Temporarily install a new gasket and the No. 2 turbo water pipe with the union bolt and bolt.


b.

Tighten the union bolt and bolt in the order shown in the illustration.

Torque:
for union bolt : 35 N*m (357 kgf*cm, 26 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Connect the water hose to the pipe.


Hide 16355 9.INSTALL FRONT WATER BY-PASS JOINT (for Bank 2)

a.

Install a new gasket and the front water by-pass joint.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)


Hide 16029 10.INSTALL NO. 3 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 2)

a.
U163094E02
0.354,0.49 0.479,0.635 0.125,0.146 10 false 1 0.281,1.813 0.406,1.958 0.125,0.146 10 false 2 1.573,0.156 1.698,0.302 0.125,0.146 10 false 3

Temporarily install a new gasket and the No. 3 turbo water pipe with the union bolt and 2 bolts.


b.

Tighten the union bolt and 2 bolts in the order shown in the illustration.

Torque:
for union bolt : 35 N*m (357 kgf*cm, 26 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17168 11.INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 2)

a.

Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


Hide 16287 12.INSTALL NO. 2 TURBO WATER HOSE (for Bank 2)

Hide 13.INSTALL BREATHER PLUG LH (for Bank 2)

a.

Install the breather plug LH.


b.

w/o DPF:

Attach the clamp.


c.

Connect the hose.


Hide 12263 14.INSTALL NO. 3 VENTILATION HOSE (for Bank 2)

Hide 15407 15.INSTALL NO. 1 INLET TURBO OIL PIPE SUB-ASSEMBLY (for Bank 1)

a.
U162966E02
2.042,0.198 2.167,0.344 0.125,0.146 10 false 1 1.365,1.25 1.49,1.396 0.125,0.146 10 false 2

Temporarily install a new gasket and the No. 1 inlet turbo oil pipe with the union bolt and bolt.


b.

Tighten the union bolt and bolt in the order shown in the illustration.

Torque:
for union bolt : 29 N*m (296 kgf*cm, 21 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 15481 16.INSTALL NO. 1 TURBO OIL PIPE (for Bank 1)

a.

Install a new gasket and the No. 1 turbo oil pipe with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17274 17.INSTALL NO. 1 INLET COMPRESSOR ELBOW (for Bank 1)

a.

Install a new gasket and the No. 1 inlet compressor elbow with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

HINT:

Install the No. 1 inlet compressor elbow with the "R" mark facing toward the outside of the vehicle.



Hide 17201 18.INSTALL NO. 1 TURBOCHARGER SUB-ASSEMBLY WITH EXHAUST MANIFOLD RH (for Bank 1)

a.

Install a new gasket to the No. 1 turbocharger.


b.

Install the exhaust manifold RH to the No. 1 turbocharger with 2 new nuts and the bolt.

Torque:
69 N*m (704 kgf*cm, 51 ft.*lbf)


c.

w/ DPF:

i.

Install 2 new gaskets to the No. 1 exhaust manifold pipe.

HINT:

The gasket claws should face the No. 1 exhaust manifold pipe.



ii.
A264026

Temporarily install the No. 1 exhaust manifold pipe with the 4 bolts.

HINT:

Install the No. 1 exhaust manifold pipe so that it is oriented as shown in the illustration.



iii.

Tighten the 4 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)



d.

Install a new gasket to the cylinder head RH.


e.

Install the No. 1 turbocharger with exhaust manifold RH to the cylinder head RH with the 10 collars and 10 new nuts.

Torque:
36 N*m (367 kgf*cm, 27 ft.*lbf)

A264036E01
0.081,0.042 0.266,0.197 0.185,0.155 10 *A 3.853,0.042 4.038,0.197 0.185,0.155 10 *B

Text in Illustration
*A w/ DPF *B w/o DPF

HINT:

Install the collars with the colored side facing the nuts.



f.
A177405

Install a new gasket and the No. 1 inlet turbo oil pipe to the cylinder block with the union bolt.

Torque:
When "dry" : 29 N*m (296 kgf*cm, 21 ft.*lbf)
When "wet" : 23 N*m (235 kgf*cm, 17 ft.*lbf)

NOTICE:
·

The parts are "dry" when there is absolutely no engine oil on the union bolt and cylinder block bolt hole.

·

The parts are "wet" when there is engine oil on the union bolt and cylinder block bolt hole.




Hide 12201 19.INSTALL NO. 1 VENTILATION TUBE SUB-ASSEMBLY (for Bank 1)

a.
U163480E02
2.135,2.25 2.26,2.396 0.125,0.146 10 false 1 2.229,1.25 2.354,1.396 0.125,0.146 10 false 2

Temporarily install a new gasket and the No. 1 ventilation tube with the union bolt and bolt.


b.

Tighten the union bolt and bolt in the order shown in the illustration.

Torque:
for union bolt : 29 N*m (296 kgf*cm, 21 ft.*lbf)
for bolt : 10 N*m (102 kgf*cm, 7 in.*lbf)

NOTICE:

Clean and remove any oil in the area labeled 1 in the illustration.



c.

Connect the hose.


Hide 17293 20.INSTALL NO. 1 TURBOCHARGER STAY (for Bank 1)

a.

Temporarily install the No. 1 turbocharger stay with the 2 bolts.


b.

Tighten the 2 bolts.

Torque:
49 N*m (495 kgf*cm, 36 ft.*lbf)


Hide 16027 21.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY (for Bank 1)

a.
A177401E03
2.594,0.167 2.427,0.167 2.427,0.167 2.083,0.604 true 2.427,0.167 2.073,1.01 true 2.625,0.083 2.854,0.281 0.229,0.198 10 true *1

Install a new gasket and the No. 1 turbo water pipe with 2 new nuts and the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

Text in Illustration
*1 New Nut


b.

Connect the water hose.


Hide 15474A 22.CONNECT NO. 1 OUTLET TURBO OIL HOSE (for Bank 1)

Hide 17167 23.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (for Bank 1)

a.

Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


Hide 16285 24.INSTALL NO. 2 TURBO WATER HOSE (for Bank 1)

Hide 25.INSTALL BREATHER PLUG RH (for Bank 1)

a.

Install the breather plug RH and attach the clamp.


b.

Connect the hose.


Hide 12262 26.INSTALL NO. 2 VENTILATION HOSE (for Bank 1)

Hide 17875 27.INSTALL NO. 1 INTAKE AIR CONNECTOR PIPE (for Bank 1)

a.

Install the No. 1 intake air connector pipe with the bolt. Then tighten the hose clamp.

Torque:
for bolt : 21 N*m (214 kgf*cm, 15 ft.*lbf)
for hose clamp : 6.0 N*m (61 kgf*cm, 53 in.*lbf)


b.

Connect the 4 connectors and attach the 5 wire harness clamps.


Hide 11452 28.INSTALL NO. 1 ENGINE OIL LEVEL DIPSTICK GUIDE (for Bank 1)

a.

Apply a light coat of engine oil to a new O-ring and install it to the No. 1 engine oil level dipstick guide.


b.

Install the No. 1 engine oil level dipstick guide with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 33.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


a.

Connect the cables to negative (-) main battery and sub-battery terminals.