Home › Engine / Hybrid System › 1GR-FE (INTAKE / EXHAUST) › INTAKE MANIFOLD › from 2015.08
RM2660E _51 Engine / Hybrid System _052791 1GR-FE INTAKE / EXHAUST _0255180 INTAKE MANIFOLD A

1GR-FE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 1.INSTALL STUD BOLT

NOTICE:

If a stud bolt is deformed or its threads are damaged, replace it.


a.

Using the E8 "TORX" socket wrench, install the 2 stud bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 17111 2.INSTALL INTAKE MANIFOLD

a.
A221467

Set a new gasket on each cylinder head.

NOTICE:
·

Align the port holes of the gasket and cylinder head.

·

Be careful of the installation direction.




b.

Set the intake manifold on the cylinder heads.


c.

Install and uniformly tighten the 6 bolts and 4 nuts in several passes.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

HINT:

Tighten the inner installation bolts of the intake manifold before tightening the outer bolts.



Hide 23807 3.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 17129 4.INSTALL INTAKE AIR SURGE TANK

a.

Install a new gasket to the intake air surge tank.


b.
U163628E02
0.698,1.917 0.802,2.073 0.104,0.156 10 false 1 1.781,1.927 1.885,2.083 0.104,0.156 10 false 2 0.927,0.948 1.031,1.104 0.104,0.156 10 false 3 1.458,0.948 1.563,1.104 0.104,0.156 10 false 4 0.125,1.281 0.229,1.438 0.104,0.156 10 false 5 2.323,1.26 2.427,1.417 0.104,0.156 10 false 6

Install the intake air surge tank with the 4 bolts and 2 nuts in the order shown in the illustration.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)

Text in Illustration
V100135

Bolt
V100136

Nut


c.

Install the throttle body bracket with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Install the No. 1 surge tank stay with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


e.

Attach the wire harness clamp.


f.

Install the bracket with the bolt and attach the 2 wire harness clamps.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


g.

Install the No. 2 surge tank stay with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


h.

for Manual Transmission:

Connect the clutch flexible hose bracket with the nut.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


i.
A272597E02
2.406,0.177 2.594,0.344 0.188,0.167 10 false *a 2.74,0.458 2.927,0.625 0.188,0.167 10 false *b 1.917,0.635 2.177,0.792 0.26,0.156 10 false 45°

Connect the No. 1 PCV hose.

Text in Illustration
*a Front
*b RH

HINT:

Connect the No. 1 PCV hose so that the direction of the hose clamp is as indicated in the illustration.



j.

Connect the No. 1 vacuum switching valve connector.


k.

Connect the purge line hose.


l.

Connect the throttle body connector.


m.

Connect the No. 4 water by-pass hose.


n.

Connect the No. 5 water by-pass hose.


Hide 17361 5.INSTALL AIR TUBE (w/ Secondary Air Injection System)

a.
A270148E02
1.042,0.792 0.833,0.271 0.833,0.271 0.708,0.271 true 0.542,0.188 0.698,0.344 0.156,0.156 10 false *1 2.656,0.167 2.833,0.313 0.177,0.146 10 false *a 2.021,0.708 2.198,0.854 0.177,0.146 10 false *b 1.938,0.479 2.177,0.635 0.24,0.156 10 false 60°

for Bank 1 Side:

Align the paint mark with the projection and connect the air tube assembly to the emission control valve set.

Text in Illustration
*1 Paint Mark
*a Top
*b RH Side

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



b.
A270149E02
0.729,0.771 0.938,0.25 0.938,0.25 1.021,0.25 true 1.052,0.167 1.208,0.313 0.156,0.146 10 false *1 2.969,0.729 3.125,0.875 0.156,0.146 10 false *b 2.313,0.208 2.469,0.354 0.156,0.146 10 false *a 3.021,0.927 3.25,1.073 0.229,0.146 10 false 60°

for Bank 2 Side:

Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.

Text in Illustration
*1 Paint Mark
*a Top
*b LH Side

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



c.

Install the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Connect the No. 3 air hose.


Hide 17881 6.INSTALL NO. 1 AIR CLEANER HOSE

a.
A456628C01
0.302,2.26 0.427,2.26 0.427,2.26 0.552,2.667 false 0.708,2.698 1.063,2.354 1.063,2.354 1.177,2.354 true 0.135,2.177 0.448,2.333 0.313,0.156 10 false *a 1.208,2.26 1.521,2.417 0.313,0.156 10 false *b 2.76,2.135 3.073,2.292 0.313,0.156 10 false *c 3.198,2.625 3.406,2.833 0.208,0.208 10 false *d 1.542,2.51 1.854,2.667 0.313,0.156 10 false (A) 2.125,2.615 2.438,2.771 0.313,0.156 10 false 90°
*a Protrusion
*b Groove
*c Top
*d Front


Install the No. 1 air cleaner hose with the 2 hose clamps.

(A):

15 mm or less



b.

Install the bolt.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


c.

Connect the vacuum hose and No. 2 PCV hose.


Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


Hide 11259 11.INSTALL V-BANK COVER

a.
A271365E02
2.813,0.813 3.031,0.719 3.031,0.719 3.135,0.719 true 0.906,0.792 0.99,0.677 0.99,0.677 1.094,0.677 false 3.146,0.635 3.302,0.781 0.156,0.146 10 false *1 1.094,0.583 1.25,0.729 0.156,0.146 10 false *2

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration
*1 Pin
*2 Hook


Hide 51405A 12.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

Hide 53806 13.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

Hide 53805 14.INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH