Home › Engine / Hybrid System › 1UR-FE (ENGINE CONTROL) › SFI SYSTEM › from 2016.08
RM2660E _51 Engine / Hybrid System _052772 1UR-FE ENGINE CONTROL _0254983 SFI SYSTEM J

1UR-FE ENGINE CONTROL  SFI SYSTEM  Fuel Pump Control Circuit  


DESCRIPTION

The fuel pump circuit consists of the ECM, fuel pump and fuel pump ECU (which operates the fuel pump). Based on the engine output, the ECM determines the fuel pump speed. The speed is then converted to a duty signal and sent to the fuel pump ECU. Based on the signal sent from the ECM, the fuel pump ECU adjusts the fuel pump operation speed.

WIRING DIAGRAM

A392729E01
0.802,5.542 1.344,5.833 0.542,0.292 10 false Battery 0.604,4 1.146,4.292 0.542,0.292 10 false P/I-B 3.01,3.031 4.656,3.292 1.646,0.26 10 false No. 2 Integration Relay 3.813,2.604 4.656,2.844 0.844,0.24 10 false FUEL PMP 1.917,2.417 2.76,2.656 0.844,0.24 10 false FUEL PMP 2.771,1.688 3.427,2.125 0.656,0.438 10 false EFI MAIN NO. 1 1.948,1.5 2.646,1.99 0.698,0.49 10 false EFI MAIN NO. 1 5.99,0.854 6.531,1.146 0.542,0.292 10 false MREL 5.979,1.344 6.521,1.635 0.542,0.292 10 false +B 5.99,1.781 6.531,2.073 0.542,0.292 10 false +B2 6.229,6.469 6.771,6.76 0.542,0.292 10 false ECM 6,6.271 6.917,6.521 0.917,0.25 10 false A52*1, A38*2 4.698,5.854 5.542,6.094 0.844,0.24 10 false *1: for RHD 4.688,6.177 5.531,6.417 0.844,0.24 10 false *2: for LHD 3.115,6.469 3.958,6.708 0.844,0.24 10 false Fuel Pump 3.125,6.302 3.969,6.542 0.844,0.24 10 false N1 3.146,5.625 3.354,5.854 0.208,0.229 10 false B2 3.635,5.635 3.844,5.865 0.208,0.229 10 false E2 3.042,4.906 3.25,5.135 0.208,0.229 10 false FP 3.729,4.896 4.073,5.125 0.344,0.229 10 false FP- 5.99,4.25 6.333,4.479 0.344,0.229 10 false FPC 3.688,4.385 4.031,4.615 0.344,0.229 10 false FPC 2.958,4.417 3.302,4.646 0.344,0.229 10 false E 3.802,3.979 4.146,4.208 0.344,0.229 10 false +B 5.688,4.26 5.917,4.49 0.229,0.229 10 false 52 4.125,4.25 4.354,4.479 0.229,0.229 10 false 5 3.917,5.115 4.146,5.344 0.229,0.229 10 false 2 3.917,5.406 4.146,5.635 0.229,0.229 10 false 5 2.99,5.385 3.219,5.615 0.229,0.229 10 false 4 2.99,5.115 3.219,5.344 0.229,0.229 10 false 1 2.76,4.25 2.99,4.479 0.229,0.229 10 false 3 4.115,3.833 4.344,4.063 0.229,0.229 10 false 6 5.802,1.635 6.031,1.865 0.229,0.229 10 false 2 5.802,1.208 6.031,1.438 0.229,0.229 10 false 3 5.729,0.729 5.958,0.958 0.229,0.229 10 false 34 0.813,0.656 1.042,0.885 0.229,0.229 10 false 4 0.802,2.063 1.031,2.292 0.229,0.229 10 false 1 4.875,2.073 5.104,2.302 0.229,0.229 10 false 6 4.885,1.573 5.115,1.802 0.229,0.229 10 false 7 4.844,1.135 5.073,1.365 0.229,0.229 10 false 11 4.885,0.625 5.115,0.854 0.229,0.229 10 false 8 0.771,2.26 1,2.49 0.229,0.229 10 false 1X 0.76,0.833 0.99,1.063 0.229,0.229 10 false 1S 4.833,0.833 5.063,1.063 0.229,0.229 10 false 1S 4.833,1.323 5.063,1.552 0.229,0.229 10 false 1S 4.833,1.781 5.063,2.01 0.229,0.229 10 false 1R 4.833,2.26 5.063,2.49 0.229,0.229 10 false 1R 4.115,4.677 4.458,4.906 0.344,0.229 10 false N14 4.115,4.865 5.24,5.094 1.125,0.229 10 false Fuel Pump ECU

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses for circuits related to this system before performing the following inspection procedure.


PROCEDURE

1.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP / SPEED)
a.

Connect the GTS to the DLC3.


b.

Turn the engine switch on (IG).


c.

Turn the GTS on.


d.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.


e.

Check whether operating sounds can be heard while operating the fuel pump using the GTS.

OK:

Operating sounds can be heard from fuel pump.




OK

2.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP DUTY)

NG

6.CHECK TERMINAL VOLTAGE (POWER SOURCE OF FUEL PUMP ECU)
2.PERFORM ACTIVE TEST USING GTS (CONTROL THE FUEL PUMP DUTY)
A243665E01
2.862,1.37 2.973,1.519 0.111,0.149 10 1 0.647,1.391 0.755,1.544 0.107,0.152 10 2 1.931,1.67 2.821,1.462 false 1.539,1.671 0.796,1.478 false 0.178,0.144 2.543,0.541 2.365,0.397 10 Component with harness connected: (Fuel Pump)

a.

Remove the fuel tank assembly (See page Engine / Hybrid System>1UR-FE (FUEL)>FUEL TANK>REMOVAL).


b.

Remove the fuel pump from the fuel tank assembly.


c.

Clean the fuel pump to completely remove any remaining fuel.


d.

Connect the fuel pump connector.

CAUTION:

Confirm that no fuel remains inside or on the outside of the fuel pump.



e.

Connect the GTS to the DLC3.


f.

Turn the engine switch on (IG).


g.

Turn the GTS on.


h.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump Duty.


i.

Operate the fuel pump using the Active Test function and measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Tester Operation Specified Condition
1 - 2 FPC Duty: 25% 3.2 to 4.05 V
FPC Duty: 80% 8.8 to 12.5 V



j.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.


k.

Operate the fuel pump using the Active Test function and measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Tester Operation Specified Condition
1 - 2 ON (FPC Duty: 90%) 9.0 to 14.0 V



HINT:
·

Be sure to measure the voltage with all of the connectors connected.

·

Before performing this inspection, check that the battery voltage is between 11 and 14 V (not depleted).




OK

3.INSPECT FUEL PUMP

NG

7.INSPECT FUEL PUMP
3.INSPECT FUEL PUMP
a.


OK

END

NG

4.REPLACE FUEL PUMP
4.REPLACE FUEL PUMP
a.

Replace the fuel pump (See page Engine / Hybrid System>1UR-FE (FUEL)>FUEL PUMP>REMOVAL).



NEXT

5.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
5.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
a.

Check the fuel pump operation.

OK:

Malfunction has been repaired successfully.




OK

END

NG

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

6.CHECK TERMINAL VOLTAGE (POWER SOURCE OF FUEL PUMP ECU)
U163418C01
2.198,1.448 2.5,1.906 true 1.563,1.438 1.313,1.896 true 2.5,1.927 2.885,2.146 0.385,0.219 10 false +B 0.271,1.229 0.604,1.406 0.333,0.177 10 false N14 0.094,0.104 0.521,0.406 0.427,0.302 10 false *a 1.24,1.938 1.625,2.156 0.385,0.219 10 false E
*1 Front view of wire harness connector
(to Fuel Pump ECU)


a.

Disconnect the fuel pump ECU connector.


b.

Turn the engine switch on (IG).


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
N14-6 (+B) - N14-3 (E) Engine switch on (IG) 11 to 14 V




OK

7.INSPECT FUEL PUMP

NG

11.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - BODY GROUND)
7.INSPECT FUEL PUMP
a.


OK

8.CHECK HARNESS AND CONNECTOR (FUEL PUMP - FUEL PUMP ECU)

NG

8.CHECK HARNESS AND CONNECTOR (FUEL PUMP - FUEL PUMP ECU)
a.

Disconnect the fuel pump connector.


b.

Disconnect the fuel pump ECU connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
N1-4 (B2) - N14-1 (FP) Always Below 1 Ω
N1-5 (E2) - N14-2 (FP-) Always Below 1 Ω
N1-4 (B2) or N14-1 (FP) - Body ground Always 10 kΩ or higher
N1-5 (E2) or N14-2 (FP-) - Body ground Always 10 kΩ or higher




OK

9.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

9.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - ECM)
a.

Disconnect the fuel pump ECU connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (for RHD):
Tester Connection Condition Specified Condition
N14-5 (FPC) - A52-52 (FPC) Always Below 1 Ω
N14-5 (FPC) or A52-52 (FPC) - Body ground Always 10 kΩ or higher


Standard Resistance (for LHD):
Tester Connection Condition Specified Condition
N14-5 (FPC) - A38-52 (FPC) Always Below 1 Ω
N14-5 (FPC) or A38-52 (FPC) - Body ground Always 10 kΩ or higher




OK

10.INSPECT ECM (FPC TERMINAL)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.INSPECT ECM (FPC TERMINAL)
a.
U163418C02
2.031,1.448 2.333,1.906 true 2.281,1.938 2.719,2.146 0.438,0.208 10 false FPC 0.25,1.229 0.583,1.406 0.333,0.177 10 false N14 0.125,0.094 0.802,0.438 0.677,0.344 10 false *a
*1 Front view of wire harness connector
(to Fuel Pump ECU)


Disconnect the fuel pump ECU connector.


b.

Connect the GTS to the DLC3.


c.

Turn the engine switch on (IG).


d.

Turn the GTS on.


e.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.


f.

Operate the fuel pump ECU using the Active Test function and measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection GTS Operation Specified Condition
N14-5 (FPC) - Body ground Before Active Test → During Active Test Before Active Test: Resistance is stable → During Active Test: Resistance fluctuates*


HINT:

*: Using the Active Test, duty control of the transistors in the ECM will be performed. Due to the duty control, resistance of the FPC terminal will be unstable during the Active Test. If the resistance is stable before the Active Test and fluctuates while performing the Active Test, it can be determined that the transistor is operating. If the transistor does not operate during the Active Test, the ECM may be malfunctioning.




OK

REPLACE FUEL PUMP ECU

NG

11.CHECK HARNESS AND CONNECTOR (FUEL PUMP ECU - BODY GROUND)
a.

Disconnect the fuel pump ECU connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
N14-3 (E) - Body ground Always Below 1 Ω




OK

12.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - FUEL PUMP ECU)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

12.CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - FUEL PUMP ECU)
a.

Disconnect the fuel pump ECU connector.


b.

Disconnect the No. 2 integration relay connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1R-6 - N14-6 (+B) Always Below 1 Ω
1R-6 or N14-6 (+B) - Body ground Always 10 kΩ or higher




OK

13.INSPECT NO. 2 INTEGRATION RELAY (FUEL PMP)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

13.INSPECT NO. 2 INTEGRATION RELAY (FUEL PMP)
a.

Inspect the No. 2 integration relay (FUEL PMP) (See page Engine / Hybrid System>1UR-FE (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

NG

REPLACE NO. 2 INTEGRATION RELAY