Home › Vehicle Exterior › LIGHTING (EXT) › LIGHTING SYSTEM (w/ Headlight ECU) › 2021.04–2022.11
RM38G0E _59 Vehicle Exterior _100649 LIGHTING (EXT) _0468731 LIGHTING SYSTEM(w/ Headlight ECU) C

LIGHTING (EXT)  LIGHTING SYSTEM(w/ Headlight ECU)  B242F14  ECUB Circuit Short to Ground or Open  


DESCRIPTION

The headlight ECU sub-assembly operates using the power source voltage input from the IGR terminal and ECUB terminal.

The power source voltage of the ECUB terminal is supplied when the main body ECU (multiplex network body ECU) turns the ECUB power supply relay (semiconductor power integration ECU) to ON.

The headlight ECU sub-assembly compares the power source voltage supply condition of the IGR terminal and ECUB terminal and monitors the result.

Headlight Control
DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from Priority
B242F14 ECUB Circuit Short to Ground or Open
Detection condition:

The ignition switch is ON.


Malfunction status:

No power source voltage supplied to ECUB terminal while power source voltage being supplied to IGR terminal


Malfunction duration:

10 seconds or more


·

Headlight ECU sub-assembly LH

·

Harness or connector

·

Power distribution box assembly

·

Main body ECU (multiplex network body ECU)

·

Semiconductor power integration ECU


Headlight Control A

Headlight Control (Sub)
DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from Priority
B242F14 ECUB Circuit Short to Ground or Open
Detection condition:

The ignition switch is ON.


Malfunction status:

No power source voltage supplied to ECUB terminal while power source voltage being supplied to IGR terminal


Malfunction duration:

10 seconds or more


·

Headlight ECU sub-assembly RH

·

Harness or connector

·

Power distribution box assembly

·

Main body ECU (multiplex network body ECU)

·

Semiconductor power integration ECU


Headlight Control (Sub) A

WIRING DIAGRAM

E463579E04
0.229,4.365 1.24,5.5 1.01,1.135 10 false Main Body ECU (Multiplex Network Body ECU) 0.833,2.979 2.833,3.354 2,0.375 10 false HRY2 0.865,0.719 2.865,1.094 2,0.375 10 false HRLY 1.458,0.625 2.167,0.885 0.708,0.26 10 false 8 2.51,2.917 3.219,3.177 0.708,0.26 10 false 10 2.531,0.615 3.24,0.875 0.708,0.26 10 false 6 3.01,0.688 3.719,0.948 0.708,0.26 10 false 15 3.323,0.667 4.031,0.927 0.708,0.26 10 false -S 3.052,2.969 3.76,3.229 0.708,0.26 10 false 14 1.406,2.917 2.115,3.177 0.708,0.26 10 false 9 6.135,0.75 6.844,1.01 0.708,0.26 10 false ECUB 6.125,3.031 6.833,3.292 0.708,0.26 10 false ECUB 5.781,3.615 6.927,3.99 1.146,0.375 10 false B7 5.875,2.927 6.583,3.188 0.708,0.26 10 false 13 5.885,0.635 6.594,0.896 0.708,0.26 10 false 13 5.5,0.635 6.208,0.896 0.708,0.26 10 false 1 5.521,2.906 6.229,3.167 0.708,0.26 10 false 2 5.271,0.615 5.979,0.875 0.708,0.26 10 false L 4.531,0.375 5.24,0.635 0.708,0.26 10 false +B 4.781,0.781 5.49,1.042 0.708,0.26 10 false IPD 4.76,3.052 5.469,3.313 0.708,0.26 10 false IPD 3.906,1.958 4.615,2.219 0.708,0.26 10 false CPU 3.5,4.365 5.354,4.615 1.854,0.25 10 false B57 3.521,4.531 5.25,5.438 1.729,0.906 10 false No. 1 Semiconductor Power Integration ECU 1.406,3.104 3.406,3.479 2,0.375 10 false MB 1.375,3.615 2.49,4.146 1.115,0.531 10 false Power Distribution Box Assembly 5.792,1.323 6.938,1.698 1.146,0.375 10 false B4 5.802,1.5 7.052,1.896 1.25,0.396 10 false Headlight ECU Sub-assembly LH 5.771,3.802 7.021,4.177 1.25,0.375 10 false Headlight ECU Sub-assembly RH 5.271,2.906 5.979,3.167 0.708,0.26 10 false L 3.323,2.979 4.031,3.24 0.708,0.26 10 false -S 2.49,0.844 3.198,1.104 0.708,0.26 10 false 5E 2.479,3.115 3.188,3.375 0.708,0.26 10 false 5E 1.417,0.833 3.417,1.208 2,0.375 10 false MB

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

Before replacing the main body ECU (multiplex network body ECU), refer to Service Bulletin.

·

If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH.

Click hereVehicle Exterior>LIGHTING (EXT)>LIGHTING SYSTEM (w/ Headlight ECU)>REGISTRATION

·

When replacing the headlight ECU sub-assembly LH, always replace it with a new one. If a headlight ECU sub-assembly LH which was installed to another vehicle is used, the information stored in it will not match the information from the vehicle and a DTC may be stored.



PROCEDURE

1.CLEAR DTC
a.

Clear the DTCs.

Body Electrical > Headlight Control > Clear DTCs
50002 462

Result:
Proceed to
NEXT



NEXT

2.CHECK FOR DTC
2.CHECK FOR DTC

Pre-procedure1

a.

Turn ignition switch to ON.


b.

Wait 10 seconds or more.


Procedure1

c.

Check for DTCs.

Body Electrical > Headlight Control > Trouble Codes
50001 462
Result:
Result Proceed to
B242F14 is not output A
B242F14 is output B



Post-procedure1

d.

None



A

3.CLEAR DTC

B

15.READ VALUE USING GTS
3.CLEAR DTC
a.

Clear the DTCs.

Body Electrical > Headlight Control (Sub) > Clear DTCs
50002 463

Result:
Proceed to
NEXT



NEXT

4.CHECK FOR DTC
4.CHECK FOR DTC

Pre-procedure1

a.

Turn ignition switch to ON.


b.

Wait 10 seconds or more.


Procedure1

c.

Check for DTCs.

Body Electrical > Headlight Control (Sub) > Trouble Codes
50001 463
Result:
Result Proceed to
B242F14 is not output A
B242F14 is output B



Post-procedure1

d.

None



A

B

5.READ VALUE USING GTS
5.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Range Normal Condition Diagnostic Note
Headlight ECU/LDM RH Power Supply Fuse Shut Off Status Headlight ECU sub-assembly RH fuse condition OFF or ON OFF: Fuse not shut off
ON: Fuse shut off
-
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM RH Power Supply Fuse Shut Off Status
50003 473 383
OK:

The Data List value displays "OFF".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

6.READ VALUE USING GTS

NG

13.READ VALUE USING GTS
6.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Range Normal Condition Diagnostic Note
Headlight ECU/LDM RH Power Supply Signal Headlight ECU sub-assembly RH power supply signal OFF or ON OFF: Headlight ECU sub-assembly RH is not input
ON: Headlight ECU sub-assembly RH is input
-
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM RH Power Supply Signal
50003 473 380
OK:

The Data List value displays "ON".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

7.READ VALUE USING GTS

NG

10.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
7.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Range Normal Condition Diagnostic Note
Headlight ECU/LDM RH Power Supply Output Headlight ECU sub-assembly RH power supply output OFF or ON OFF: Headlight ECU sub-assembly RH has no power supply
ON: Headlight ECU sub-assembly RH has power supply
-
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM RH Power Supply Output
50003 473 381
OK:

The Data List value displays "ON".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

8.INSPECT HEADLIGHT ECU SUB-ASSEMBLY RH (ECUB TERMINAL VOLTAGE)

NG

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

8.INSPECT HEADLIGHT ECU SUB-ASSEMBLY RH (ECUB TERMINAL VOLTAGE)

Pre-procedure1

a.

Disconnect the B7 headlight ECU sub-assembly LH connector.


Procedure1

b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition

Click Location & Routing(B7)Location & Routing

Click Connector(B7)Engine Compartment>Engine Room Main Wire / Lamp Wire / No. 2 Engine Room Wire / No. 2 Lamp Wire / No. 3 Engine Room Wire / No. 6 Engine Room Wire / Washer Wiring Assembly>Headlight ECU Sub-Assembly RH

B7-13 (ECUB) - Body ground Ignition switch ON 9.5 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY RH

NG

9.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)
9.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1


Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU

Pre-procedure1

a.

Disconnect the 5E power distribution box assembly connector.


Procedure1

b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
5E-10 - Body ground Always 6 to 14V


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

11.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

NG

12.INSPECT POWER DISTRIBUTION BOX ASSEMBLY
11.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1

c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(B57)Location & Routing

Click Connector(B57)Engine Compartment>Engine Room Main Wire / Lamp Wire / No. 2 Engine Room Wire / No. 2 Lamp Wire / No. 3 Engine Room Wire / No. 6 Engine Room Wire / Washer Wiring Assembly>Semiconductor Power Integration ECU

B57-14 (-S) - 5E-10 Always Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

12.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

Pre-procedure1

a.

Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

HINT:

for LHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL

for RHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL



Procedure1

b.

Measure the resistance according to the value(s) in the table below.

E444782C13
1.615,0.229 1.99,0.479 0.375,0.25 4.656,0.427 5.031,0.677 0.375,0.25 4.156,1.302 4.417,0.969 true 0.229,0.198 0.542,0.396 0.313,0.198 10 false *a 1.719,0.26 2.031,0.458 0.313,0.198 10 false 5E 4.74,0.469 5.052,0.667 0.313,0.198 10 false MB 3.969,1.333 4.5,1.563 0.531,0.229 10 false HRY2
*a Component without harness connected
(Power Distribution Box Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
5E-10 - MB-9 (HRY2) Always Below 1 Ω


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

NG

13.READ VALUE USING GTS

Pre-procedure1

a.

Disconnect the B7 headlight ECU sub-assembly RH connector.


b.

Wait for 15 seconds after turning the ignition switch off.


Procedure1

c.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Normal Condition Diagnostic Note
Headlight ECU/LDM RH Power Supply Fuse Shut Off Status Headlight ECU sub-assembly RH fuse condition OFF or ON OFF: Fuse not shut off
ON: Fuse shut off
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM RH Power Supply Fuse Shut Off Status
50003 473 383
OK:

The Data List value displays "OFF".



Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY RH

NG

14.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)
14.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1


Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

15.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Normal Condition Diagnostic Note
Headlight ECU/LDM LH Power Supply Fuse Shut Off Status Headlight ECU sub-assembly LH fuse condition OFF or ON OFF: Fuse not shut off
ON: Fuse shut off
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM LH Power Supply Fuse Shut Off Status
50003 473 388
OK:

The Data List value displays "OFF".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

16.READ VALUE USING GTS

NG

23.READ VALUE USING GTS
16.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Normal Condition Diagnostic Note
Headlight ECU/LDM LH Power Supply Signal Headlight ECU sub-assembly LH power supply signal OFF or ON OFF: Headlight ECU sub-assembly LH is not input
ON: Headlight ECU sub-assembly LH is input
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM LH Power Supply Signal
50003 473 385
OK:

The Data List value displays "ON".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

17.READ VALUE USING GTS

NG

20.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
17.READ VALUE USING GTS

Pre-procedure1

a.

None


Procedure1

b.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Normal Condition Diagnostic Note
Headlight ECU/LDM LH Power Supply Output Headlight ECU sub-assembly LH power supply output OFF or ON OFF: Headlight ECU sub-assembly LH has no power supply
ON: Headlight ECU sub-assembly LH has power supply
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM LH Power Supply Output
50003 473 386
OK:

The Data List value displays "ON".



Result:
Proceed to
OK
NG


Post-procedure1

c.

None



OK

18.INSPECT HEADLIGHT ECU SUB-ASSEMBLY LH (ECUB TERMINAL VOLTAGE)

NG

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

18.INSPECT HEADLIGHT ECU SUB-ASSEMBLY LH (ECUB TERMINAL VOLTAGE)

Pre-procedure1

a.

Disconnect the B4 headlight ECU sub-assembly LH connector.


Procedure1

b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition

Click Location & Routing(B4)Location & Routing

Click Connector(B4)Engine Compartment>Engine Room Main Wire / Lamp Wire / No. 2 Engine Room Wire / No. 2 Lamp Wire / No. 3 Engine Room Wire / No. 6 Engine Room Wire / Washer Wiring Assembly>Headlight ECU Sub-Assembly LH

B4-13 (ECUB) - Body ground Ignition switch ON 9.5 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY LH

NG

19.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)
19.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1


Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

20.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU

Pre-procedure1

a.

Disconnect the 5E power distribution box assembly connector.


Procedure1

b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
5E-6 - Body ground Always 6 to 14V


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

21.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

NG

22.INSPECT POWER DISTRIBUTION BOX ASSEMBLY
21.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1

c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(B57)Location & Routing

Click Connector(B57)Engine Compartment>Engine Room Main Wire / Lamp Wire / No. 2 Engine Room Wire / No. 2 Lamp Wire / No. 3 Engine Room Wire / No. 6 Engine Room Wire / Washer Wiring Assembly>Semiconductor Power Integration ECU

B57-15 (-S) - 5E-6 Always Below 1 Ω



Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

22.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

Pre-procedure1

a.

Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

HINT:

for LHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL

for RHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL



Procedure1

b.

Measure the resistance according to the value(s) in the table below.

E444782C12
1.615,0.229 1.99,0.479 0.375,0.25 4.656,0.427 5.031,0.677 0.375,0.25 4.104,1.281 4.365,0.948 true 0.229,0.198 0.542,0.396 0.313,0.198 10 false *a 1.719,0.26 2.031,0.458 0.313,0.198 10 false 5E 4.74,0.469 5.052,0.667 0.313,0.198 10 false MB 3.969,1.313 4.5,1.542 0.531,0.229 10 false HRLY
*a Component without harness connected
(Power Distribution Box Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
5E-6 - MB-8 (HRLY) Always Below 1 Ω


Result:
Proceed to
OK
NG



Post-procedure1

c.

None



OK

NG

23.READ VALUE USING GTS

Pre-procedure1

a.

Disconnect the B4 headlight ECU sub-assembly LH connector.


b.

Wait for 15 seconds after turning the ignition switch off.


Procedure1

c.

Read the Data List according to the display on the GTS.

Body Electrical > Power Integration No.1 > Data List
Tester Display Measurement Item Normal Condition Diagnostic Note
Headlight ECU/LDM LH Power Supply Fuse Shut Off Status Headlight ECU sub-assembly LH fuse condition OFF or ON OFF: Fuse not shut off
ON: Fuse shut off
Body Electrical > Power Integration No.1 > Data List
Tester Display
Headlight ECU/LDM LH Power Supply Fuse Shut Off Status
50003 473 388
OK:

The Data List value displays "OFF".



Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY LH

NG

24.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)
24.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)

Pre-procedure1

a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the B57 semiconductor power integration ECU connector.


Procedure1


Result:
Proceed to
OK
NG


Post-procedure1

d.

None



OK

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR