Home › Brake › PARKING BRAKE › ELECTRIC PARKING BRAKE SYSTEM
RM37H0E _54 Brake _096946 PARKING BRAKE _0455727 ELECTRIC PARKING BRAKE SYSTEM C

PARKING BRAKE  ELECTRIC PARKING BRAKE SYSTEM  C13B516  Electric Parking Brake Actuator Supply Voltage Circuit Voltage Below Threshold  


DESCRIPTION

DTC No. Detection Item DTC Detection Condition Trouble Area Memory DTC Output from Priority Note
C13B516 Electric Parking Brake Actuator Supply Voltage Circuit Voltage Below Threshold
·

Diagnosis Condition:

Ignition switch ON or electric parking brake switch assembly pulled to lock side with ignition switch off.

·

Malfunction Status:

Voltage at terminal +BS is less than 6 V*

·

Detection Time:

Approximately 0.5 seconds


HINT:

*: When the auxiliary battery voltage is 12 V.


·

Wire harness and connector

·

No. 2 skid control ECU (brake actuator assembly)


DTC stored Brake/EPB A An electric parking brake system malfunction is displayed on the multi-information display.

DTC Detection Conditions:
Vehicle Condition
Pattern 1 Pattern 2
Diagnosis Condition Ignition switch ON ○ -
Electric parking brake switch assembly pulled to lock side with ignition switch off - ○
Malfunction Status Voltage at terminal +BS is less than 6 V*
HINT:

*: When the auxiliary battery voltage is 12 V.


○ ○
Detection Time Approximately 0.5 seconds Approximately 0.5 seconds
Number of Trips 1 trip 1 trip

HINT:

DTC will be output when conditions for either of the patterns in the table above are met.


WIRING DIAGRAM

C419806E31
1.813,1.583 3.042,1.781 1.229,0.198 10 false ABS NO. 2 4.188,1.427 4.625,1.667 0.438,0.24 10 false +BS 3.885,1.313 4.323,1.552 0.438,0.24 10 false 14 4.167,2.167 4.667,2.417 0.5,0.25 10 false A6 4.167,2.333 5.99,2.927 1.823,0.594 10 false No. 2 Skid Control ECU (Brake Actuator Assembly)

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

To ensure that the electric parking brake does not operate, wait for 3 minutes or more with the ignition switch off, the driver door closed, and the brake pedal not depressed, then disconnect each connector, fuse and relay.

·

After replacing the No. 2 skid control ECU (brake actuator assembly), perform "Calibration".

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>UTILITY

·

After replacing the No. 2 skid control ECU (brake actuator assembly), perform "EPB Initialize" and "Acquire Tension Sensor Zero Point".

Click hereBrake>PARKING BRAKE>ELECTRIC PARKING BRAKE SYSTEM>UTILITY



PROCEDURE

1.CHECK HARNESS AND CONNECTOR (+BS TERMINAL VOLTAGE)

Pre-procedure1

a.

Turn the ignition switch off.


b.

Disconnect the A6 No. 2 skid control ECU (brake actuator assembly) connector.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A6)Location & Routing

Click Connector(A6)Engine Compartment>Front Compartment Main Wire / No. 3 Front Compartment Wire / No. 4 Front Compartment Wire>Brake Actuator Assembly

A6-14 (+BS) - Body ground Always 11 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR