Home › Engine / Hybrid System › 1NZ-FXE STARTING › POWER SWITCH › 2011.12–2015.11
RM2170E _51 Engine / Hybrid System _057011 1NZ-FXE STARTING _0277984 POWER SWITCH A

1NZ-FXE STARTING  POWER SWITCH  INSTALLATION  


PROCEDURE

Hide 1.INSTALL POWER SWITCH (for RHD)

a.

Connect the power switch connector.


b.

Engage the 2 claws to install the power switch.


Hide 2.INSTALL UPPER INSTRUMENT PANEL ASSEMBLY (for RHD)

Hide 3.INSTALL POWER SWITCH (for LHD)

a.

Connect the power switch connector.


b.

Engage the 2 claws to install the power switch.


Hide 55405B 4.INSTALL CLUSTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (for LHD)

Hide 5.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL (for LHD)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).