89661
1.INSTALL ECM
Install the ECM with the 2 bolts.
Install the 2 wire harness clamps.
Connect the 2 ECM connectors.
Connect the 2 ECM connectors and lower the 2 levers.
When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
Make sure that the 2 levers are securely locked.
Install the 2 wire harness clamps.
Install the No. 2 engine room wire with the bolt.
Slide the side cover down and engage the 2 claws to install it.
Slide the engine room wire harness down and engage the 2 claws to install it.
Connect the 3 wire harness connectors.
Install the No. 1 relay block cover.
G92A0A
2.INSTALL INVERTER RESERVE TANK ASSEMBLY
Install the inverter reserve tank assembly with the 2 bolts.
G9200
3.INSTALL INVERTER WITH CONVERTER ASSEMBLY
4.CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
64995
5.INSTALL DECK FLOOR BOX RH
64993
6.INSTALL REAR DECK FLOOR BOX
58412A
7.INSTALL NO. 2 DECK BOARD
58411A
8.INSTALL NO. 1 DECK BOARD
58410B
9.INSTALL DECK BOARD ASSEMBLY
10.PERFORM INITIALIZATION
Perform Initialization when replacing the ECM (See page Engine / Hybrid System>2ZR-FXE (ENGINE CONTROL)>THROTTLE BODY>INSTALLATION).
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).