Home › Vehicle Interior › METER / GAUGE / DISPLAY › METER / GAUGE SYSTEM
RM3210E _58 Vehicle Interior _047509 METER / GAUGE / DISPLAY _0236932 METER / GAUGE SYSTEM J

METER / GAUGE / DISPLAY  METER / GAUGE SYSTEM  Odo/Trip Switch Malfunction  


DESCRIPTION

The combination meter assembly (meter circuit plate) detects ODO/TRIP switch signals via a direct line.

WIRING DIAGRAM

E279675E07
5.115,1.917 6.948,2.542 1.833,0.625 10 false Combination Meter Assembly (Meter Circuit Plate) 0.385,1.927 1.781,2.375 1.396,0.448 10 false Trip Switch (Steering Pad Switch Assembly) 2.802,1.927 4.594,2.229 1.792,0.302 10 false Spiral Cable Sub-assembly 5.115,1.76 5.406,2.094 0.292,0.333 10 false F6 4.135,0.667 4.594,0.896 0.458,0.229 10 false F21 4.135,1.333 4.49,1.594 0.354,0.26 10 false F21 2.865,0.677 3.042,0.823 0.177,0.146 10 false z3 2.854,1.333 3.125,1.573 0.271,0.24 10 false z3 2.875,0.49 3.01,0.646 0.135,0.156 10 false 2 2.885,1.156 3.073,1.323 0.188,0.167 10 false 8 4.188,0.469 4.458,0.656 0.271,0.188 10 false 10 4.219,1.156 4.406,1.323 0.188,0.167 10 false 3 5.635,0.677 6.26,0.948 0.625,0.271 10 false MSM+ 5.448,0.583 5.635,0.75 0.188,0.167 10 false 1 3.729,0.573 4.031,0.74 0.302,0.167 10 false +DP 3.719,1.229 4.083,1.406 0.365,0.177 10 false EAU

PROCEDURE

1.INSPECT TRIP SWITCH (STEERING PAD SWITCH ASSEMBLY)
a.

Remove the trip switch (steering pad switch assembly).

Click hereSteering>STEERING COLUMN>STEERING PAD SWITCH>REMOVAL


b.

Inspect the trip switch (steering pad switch assembly).

Click hereSteering>STEERING COLUMN>STEERING PAD SWITCH>INSPECTION


Result:
Proceed to
OK
NG



OK

2.INSPECT SPIRAL CABLE SUB-ASSEMBLY

NG

REPLACE TRIP SWITCH (STEERING PAD SWITCH ASSEMBLY)

2.INSPECT SPIRAL CABLE SUB-ASSEMBLY
a.

Remove the spiral cable sub-assembly.

Click hereVehicle Interior>SUPPLEMENTAL RESTRAINT SYSTEMS>SPIRAL CABLE>REMOVAL


b.

Inspect the spiral cable sub-assembly.

Click hereVehicle Interior>SUPPLEMENTAL RESTRAINT SYSTEMS>SPIRAL CABLE>INSPECTION


Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY (METER CIRCUIT PLATE) - SPIRAL CABLE SUB-ASSEMBLY)

NG

REPLACE SPIRAL CABLE SUB-ASSEMBLY

3.CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY (METER CIRCUIT PLATE) - SPIRAL CABLE SUB-ASSEMBLY)
a.

Disconnect the F6 combination meter assembly (meter circuit plate) connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
F6-1 (MSM+) - F21-10 (+DP) Always Below 1 Ω
F6-1 (MSM+) or F21-10 (+DP) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPLACE COMBINATION METER ASSEMBLY (METER CIRCUIT PLATE)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR